D04-LG FY2025 (East)
D04 County · est $0.9M
Bid dateThursday, August 22—
D04 County · est $0.9M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 50 more items below.
| Item | Quantity | R1Cornerstone Electric INC | % of bid |
|---|---|---|---|
| 625E98000 LIGHTING, MISC.: ANNUAL OPERATION AND INSEPCTION O | 688 EACH | $125 | 16% |
| 625E27700 LUMINAIRE, MISC.:: HIGH MAST SOLID STATE | 29,472 FXMT | $2.50 | 13% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | 11% |
| 625E50100 TROUBLESHOOTING UNDERGROUND AND ABOVE GROUND CIRCU | 200 EACH | $200 | 7% |
| 625E02501 TRANSFORMER BASE, TYPE AT-A, AS PER PLAN | 50 EACH | $700 | 6% |
| 619E16000 FIELD OFFICE, TYPE A | 24 MNTH | $1,300 | 6% |
| 625E98000 LIGHTING, MISC.: LAYING OUT UNDERGROUND CABLE | 200 EACH | $150 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | 5% |
| 625E27700 LUMINAIRE, MISC.:: HIGH MAST SOLID STATE | 9,912 FXMT | $2.50 | 4% |
| 625E10500 LIGHT POLE, MISC.:: 29.5 FT HEIGHT [34.5 M.H.] | 10 EACH | $2,400 | 4% |
| 625E26262 LUMINAIRE, HIGH MAST, SOLID STATE | 15 EACH | $1,200 | 3% |
| 625E50000 REPAIRING UNDERGROUND BREAK OF CABLE IN DUCT OR CO | 60 EACH | $300 | 3% |
| 625E27700 LUMINAIRE, MISC.:: CONVENTIONAL, SOLID STATE | 5,640 FXMT | $2.50 | 3% |
| 625E26262 LUMINAIRE, HIGH MAST, SOLID STATE | 10 EACH | $1,200 | 2% |
| 625E27700 LUMINAIRE, MISC.:: CONVENTIONAL, STYLE B, TYPE II | 4,584 FXMT | $2.50 | 2% |
| 625E50500 SPECIAL - EMERGENCY RESPONSE-KNOCKDOWN, ROADWAY HA | 50 EACH | $225 | 2% |
| 625E10505 ERECTING REUSABLE DOWNED LIGHT POLE, AS PER PLAN | 35 EACH | $300 | 2% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE | 15 EACH | $550 | 1% |
| 625E27700 LUMINAIRE, MISC.:: CONVENTIONAL, STYLE B, TYPE II | 2,640 FXMT | $3.00 | 1% |
| 625E23201 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA | 2,500 FT | $3.00 | 1% |
| Item | Quantity | R1Cornerstone Electric INC |
|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 |
| 625E02601 TRANSFORMER BASE, TYPE AT-C, AS PER PLAN | 1 EACH | $950 |
| 625E10490 LIGHT POLE, CONVENTIONAL: DESIGN AT12B41.7 | 1 EACH | $3,700 |
| 625E10490 LIGHT POLE, CONVENTIONAL: DESIGN AT18B51.7 | 1 EACH | $5,800 |
| 625E10500 LIGHT POLE, MISC.:: [725.21] 33.5 FT HEIGHT [41.7 | 1 EACH | $2,600 |
| 625E10503 LIGHT POLE | 5 EACH | $500 |
| 625E14401 LIGHT POLE FOUNDATION REPAIR, AS PER PLAN | 2 EACH | $350 |
| 625E18101 BRACKET ARM, 12', AS PER PLAN | 1 EACH | $750 |
| 625E18201 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5 EACH |
| $800 |
| 625E18301 BRACKET ARM, 18', AS PER PLAN | 1 EACH | $900 |
| 625E18600 BRACKET ARM, MISC.:: INSTALLATION ONLY | 5 EACH | $200 |
| 625E19101 BALLAST FOR TOWER LIGHT FIXTURE, AS PER PLAN: 1000 | 20 EACH | $50.00 |
| 625E19101 BALLAST FOR TOWER LIGHT FIXTURE, AS PER PLAN: 400W | 50 EACH | $40.00 |
| 625E23301 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA | 500 FT | $4.00 |
| 625E23401 NO. 10 AWG POLE AND BRACKET CABLE, AS PER PLAN | 4,000 FT | $1.50 |
| 625E24101 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 500 FT | $7.00 |
| 625E24301 1-1/2" DUCT CABLE WITH TWO NO. 2 AWG 2400 VOLT CAB | 50 FT | $10.00 |
| 625E25500 CONDUIT, 3", 725.04 | 10 FT | $35.00 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN: STYLE B, TYP | 20 EACH | $300 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN: STYLE C, TYP | 2 EACH | $325 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE | 5 EACH | $425 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE | 10 EACH | $425 |
| 625E27502 LUMINAIRE, UNDERPASS, SOLID STATE (LED) | 2 EACH | $800 |
| 625E27521 REMOVAL OF LUMINAIRE AND REERECTION, AS PER PLAN | 10 EACH | $100 |
| 625E27700 LUMINAIRE, MISC.:: CONVENTIONAL, SOLID STATE | 2,688 FXMT | $2.50 |
| 625E27700 LUMINAIRE, MISC.:: CONVENTIONAL, STYLE C, TYPE III | 960 FXMT | $3.00 |
| 625E27700 LUMINAIRE, MISC.:: POST TOP SOLID STATE LED 5300-8 | 312 FXMT | $2.50 |
| 625E27700 LUMINAIRE, MISC.:: TUNNEL SOLID STATE, IES III-M, | 48 FXMT | $3.00 |
| 625E27700 LUMINAIRE, MISC.:: UNDERPASS SOLID STATE | 1,176 FXMT | $3.00 |
| 625E27700 LUMINAIRE, MISC.:: UNDERPASS, 100W HPS FIXTURE, 72 | 600 FXMT | $3.00 |
| 625E29000 TRENCH | 1,450 FT | $5.00 |
| 625E30701 PULL BOX, 725.08, 18", AS PER PLAN | 10 EACH | $700 |
| 625E34001 POWER SERVICE, AS PER PLAN | 2 EACH | $3,500 |
| 625E35521 REMOVE AND REERECT BRACKET ARM, AS PER PLAN | 5 EACH | $400 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 450 FT | $0.25 |
| 625E36201 POWER CABLE FOR LIGHT TOWER, AS PER PLAN | 10 FT | $5.00 |
| 625E50400 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO | 1 EACH | $1,000 |
| 625E70001 LIGHTING CONTACTOR, AS PER PLAN: 60 AMP | 3 EACH | $450 |
| 625E98000 LIGHTING, MISC.: CIRCUIT BREAK, 30 AMP, TOWER LIGH | 10 EACH | $700 |
| 625E98000 LIGHTING, MISC.: DISCONNECT SWITCH, 60 AMP | 1 EACH | $1,100 |
| 625E98000 LIGHTING, MISC.: HOISTING CABLE KIT | 2 EACH | $2,200 |
| 625E98000 LIGHTING, MISC.: HPS LAMP REPLACEMENT | 100 EACH | $75.00 |
| 625E98000 LIGHTING, MISC.: PHOTO-CELL TRANSFORMER, 60 AMP | 2 EACH | $350 |
| 625E98000 LIGHTING, MISC.: REMOVE AND RE-ERECT STANDING LIGH | 10 EACH | $350 |
| 625E98000 LIGHTING, MISC.: SECONDARY SURGE PROTECTOR [LIGHTI | 5 EACH | $250 |
| 625E98000 LIGHTING, MISC.: WEATHERTIGHT TWIST LOCK POWER INL | 5 EACH | $350 |
| 625E98000 LIGHTING, MISC.: LOWERING TOWER | 1 EACH | $2,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $60.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E98000 LIGHTING, MISC.: ANNUAL OPERATION AND INSEPCTION O | 688 EACH | $125 | $86k | 12% |
| 625E27700 LUMINAIRE, MISC.:: HIGH MAST SOLID STATE | 29,472 FXMT | $2.5 | $74k | 11% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $60k | 9% |
| 625E50100 TROUBLESHOOTING UNDERGROUND AND ABOVE GROUND CIRCU | 200 EACH | $200 | $40k | 6% |
| 625E02501 TRANSFORMER BASE, TYPE AT-A, AS PER PLAN | 50 EACH | $700 | $35k | 5% |
| 619E16000 FIELD OFFICE, TYPE A | 24 MNTH | $1,300 | $31k | 5% |
| 625E98000 LIGHTING, MISC.: LAYING OUT UNDERGROUND CABLE | 200 EACH | $150 | $30k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 4% |
| 625E27700 LUMINAIRE, MISC.:: HIGH MAST SOLID STATE | 9,912 FXMT | $2.5 | $25k | 4% |
| 625E10500 LIGHT POLE, MISC.:: 29.5 FT HEIGHT [34.5 M.H.] | 10 EACH | $2,400 | $24k | 3% |