D11-LG-FY2025
D11 County · est $0.6M
Bid dateThursday, August 22—
D11 County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 80 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Asplundh Construction LLC | % of bid |
|---|---|---|---|---|
| 625E37211 LIGHTING, MINIMAL MAINTENANCE, AS PER PLAN | 500 EACH | $225 | $379 | 23% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $89,031 | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $61,196 | 11% |
| 625E98700 LIGHTING, MISC.: TROUBLESHOOTING UNDERGROUND AND A | 200 HOUR | $260 | $151 | 11% |
| 625E98700 LIGHTING, MISC.: LOCATING AND MARKING UNDERGROUND | 100 HOUR | $250 | $151 | 5% |
| 625E98000 LIGHTING, MISC.: ANNUAL OPERATION AND INSPECTION O | 82 EACH | $200 | $404 | 3% |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, STYLE B, TYP | 40 EACH | $400 | $362 | 3% |
| 625E10505 ERECTING REUSABLE DOWNED LIGHT POLE, AS PER PLAN | 15 EACH | $1,000 | $728 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $15,000 | $9,118 | 3% |
| 809E02000 32" ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBL | 3 EACH | $5,000 | $4,796 | 3% |
| 625E10490 LIGHT POLE, CONVENTIONAL, DESIGN AT10B40 | 3 EACH | $4,500 | $3,969 | 3% |
| 625E25900 CONDUIT, JACKED OR DRILLED, 3" | 200 FT | $65.00 | $122 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $12,500 | $11,244 | 3% |
| 625E02803 TRANSFORMER BASE, MISC.:BY TYPE | 15 EACH | $825 | $920 | 3% |
| 625E29001 TRENCH, AS PER PLAN | 1,000 FT | $12.00 | $12.80 | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $11,000 | $11,244 | 2% |
| 809E65000 ITS CABINET - GROUND MOUNTED | 1 EACH | $10,000 | $11,807 | 2% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $9,000 | $4,849 | 2% |
| 625E24101 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 1,000 FT | $8.00 | $10.03 | 2% |
| 625E23201 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA | 2,000 FT | $3.50 | $3.41 | 1% |
| Item | Quantity | R1Cornerstone Electric INC | R2Asplundh Construction LLC |
|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 202E98100 REMOVAL MISC.:PORTION OF LIGHT POLE FOUNDATION REM | 1 EACH | $200 | $1,160 |
| 611E00400 4" CONDUIT, TYPE E | 60 FT | $3.00 | $37.15 |
| 611E00401 4" CONDUIT, TYPE E, AS PER PLAN | 50 FT | $3.00 | $37.15 |
| 625E00450 CONNECTION, FUSED PULL APART | 16 EACH | $200 | $135 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 3 EACH | $200 | $132 |
| 625E10500 LIGHT POLE, MISC.:29.5' POLE HEIGHT, 34.2' MOUNTIN |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 3 EACH |
| $2,000 |
| $2,492 |
| 625E10500 LIGHT POLE, MISC.:35.5' POLE HEIGHT, 41.7' MOUNTIN | 1 EACH | $2,000 | $2,591 |
| 625E13500 LIGHT TOWER, MISC.:LIGHTNING PROTECTION SYSTEM MOD | 1 EACH | $200 | $254 |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 3 EACH | $2,150 | $3,366 |
| 625E14401 LIGHT POLE FOUNDATION REPAIR, AS PER PLAN | 1 EACH | $2,000 | $2,733 |
| 625E14501 LIGHT POLE FOUNDATION, AS PER PLAN | 2 EACH | $1,800 | $3,331 |
| 625E17901 BRACKET ARM, AS PER PLAN | 3 EACH | $400 | $1,427 |
| 625E19101 BALLAST FOR TOWER LIGHT FIXTURE, AS PER PLAN | 5 EACH | $100 | $357 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 837 FT | $6.00 | $3.41 |
| 625E23301 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA | 250 FT | $4.00 | $4.27 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 90 FT | $1.50 | $1.57 |
| 625E23401 NO. 10 AWG POLE AND BRACKET CABLE, AS PER PLAN | 1,000 FT | $1.50 | $1.46 |
| 625E24301 1-1/2" DUCT CABLE WITH TWO NO. 2 AWG 2400 VOLT CAB | 300 FT | $8.25 | $10.03 |
| 625E25400 CONDUIT, 2", 725.04 | 100 FT | $12.00 | $21.70 |
| 625E25920 CONDUIT, MISC.:WALL MOUNTED, 2" | 100 FT | $20.00 | $41.60 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, STYLE B, TYP | 12 EACH | $100 | $376 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, STYLE B, TYP | 2 EACH | $100 | $362 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 1 EACH | $450 | $376 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 1 EACH | $1,500 | $1,363 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 1 EACH | $600 | $320 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 1 EACH | $650 | $320 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 1 EACH | $600 | $320 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE | 3 EACH | $600 | $341 |
| 625E26261 LUMINAIRE, HIGH MAST, AS PER PLAN, 1000 WATT HPS, | 3 EACH | $10.00 | $1,706 |
| 625E26261 LUMINAIRE, HIGH MAST, AS PER PLAN, 400 WATT HPS, 7 | 3 EACH | $10.00 | $1,099 |
| 625E26271 LUMINAIRE, LOW MAST, AS PER PLAN, 400 WATT SYMMETR | 1 EACH | $1,000 | $1,036 |
| 625E26271 LUMINAIRE, LOW MAST, AS PER PLAN, 400 WATT SYMMETR | 1 EACH | $1,000 | $1,036 |
| 625E27500 LUMINAIRE, UNDERPASS, HIGH PRESSURE SODIUM, 725.13 | 3 EACH | $450 | $461 |
| 625E29400 TRENCH IN PAVED AREA | 100 FT | $50.00 | $18.98 |
| 625E30701 PULL BOX, 725.08, 18", AS PER PLAN | 2 EACH | $1,250 | $1,670 |
| 625E30707 PULL BOX, 725.08, 24", AS PER PLAN | 1 EACH | $1,500 | $1,825 |
| 625E32000 GROUND ROD | 3 EACH | $250 | $205 |
| 625E33100 CIRCUIT BREAKER, TOWER LIGHTING | 3 EACH | $800 | $357 |
| 625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN | 2 EACH | $200 | $8,090 |
| 625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN | 2 EACH | $200 | $7,380 |
| 625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN | 2 EACH | $200 | $7,632 |
| 625E35521 REMOVE AND REERECT BRACKET ARM, AS PER PLAN | 4 EACH | $100 | $414 |
| 625E36201 POWER CABLE FOR LIGHT TOWER, AS PER PLAN | 150 FT | $5.00 | $10.17 |
| 625E50000 REPAIRING UNDERGROUND BREAK OF CABLE IN DUCT OR CO | 20 EACH | $210 | $1,456 |
| 625E50401 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO | 2 EACH | $3,000 | $2,022 |
| 625E50500 SPECIAL - EMERGENCY RESPONSE-KNOCKDOWN, ROADWAY HA | 10 EACH | $250 | $603 |
| 625E70001 LIGHTING CONTACTOR, AS PER PLAN | 2 EACH | $650 | $510 |
| 625E70001 LIGHTING CONTACTOR, AS PER PLAN | 2 EACH | $500 | $272 |
| 625E70001 LIGHTING CONTACTOR, AS PER PLAN | 2 EACH | $800 | $328 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL. | 1 EACH | $500 | $1,269 |
| 625E98000 LIGHTING, MISC.: DISCONNECT SWITCH WITH ENCLOSURE, | 1 EACH | $2,000 | $3,288 |
| 625E98000 LIGHTING, MISC.: DISCONNECT SWITCH WITH ENCLOSURE, | 1 EACH | $1,500 | $2,693 |
| 625E98000 LIGHTING, MISC.: DISCONNECT SWITCH, 100 AMP | 2 EACH | $1,000 | $1,709 |
| 625E98000 LIGHTING, MISC.: DISCONNECT SWITCH, 30 AMP | 2 EACH | $750 | $1,444 |
| 625E98000 LIGHTING, MISC.: DISCONNECT SWITCH, 60 AMP | 2 EACH | $1,000 | $1,567 |
| 625E98000 LIGHTING, MISC.: H.O.A. SWITCH | 2 EACH | $450 | $271 |
| 625E98000 LIGHTING, MISC.: LIGHTNING ROD REPAIR | 1 EACH | $500 | $4,031 |
| 625E98000 LIGHTING, MISC.: LIGHTNING SURGE ARRESTOR SYSTEM R | 3 EACH | $300 | $894 |
| 625E98000 LIGHTING, MISC.: PHOTO-CELL TRANSFORMER, 0.75 kVA | 3 EACH | $150 | $254 |
| 625E98000 LIGHTING, MISC.: REMOVE AND REERECT STANDING LIGHT | 2 EACH | $500 | $728 |
| 625E98000 LIGHTING, MISC.: TOWER LIGHTING CONNECTORS | 10 EACH | $500 | $254 |
| 625E98100 LIGHTING, MISC.: REMOVING CABLE IN EXISTING DUCT O | 1,500 FT | $0.15 | $1.51 |
| 631E85000 DISCONNECT SWITCH, 30 AMP | 1 EACH | $350 | $2,041 |
| 631E85101 DISCONNECT SWITCH WITH ENCLOSURE, TYPE X, AS PER P | 1 EACH | $100 | $2,041 |
| 631E87102 BALLAST, TYPE CMRI-100-480 | 10 EACH | $20.00 | $408 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 1 EACH | $200 | $127 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 1,380 FT | $4.00 | $3.57 |
| 625E25408 CONDUIT, 2", 725.051 | 670 FT | $10.00 | $9.43 |
| 625E29010 TRENCH, 30" DEEP | 335 FT | $12.00 | $8.51 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,200 | $1,670 |
| 625E32001 GROUND ROD, AS PER PLAN | 4 EACH | $200 | $205 |
| 625E36011 UNDERGROUND WARNING/MARKING TAPE, AS PER PLAN | 335 FT | $2.00 | $1.54 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL | 1 EACH | $500 | $1,269 |
| 809E61100 CCTV LOWERING UNIT, INSTALLATION ONLY | 1 EACH | $5,000 | $5,074 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 425 FT | $5.00 | $8.34 |
| 809E65990 ITS DEVICE, MISC.:CCTV IP CAMERA SYSTEM, QUAD MULT | 1 EACH | $5,000 | $754 |
| 809E70050 AS-BUILT CONSTRUCTION PLANS | 1 LS | $1,000 | $1,507 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $65.00 | $82.40 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,000 | $17,115 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E37211 LIGHTING, MINIMAL MAINTENANCE, AS PER PLAN | 500 EACH | $225 | $113k | 18% |
| 624E10000 MOBILIZATION | 1 LS | $60,000 | $60k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $55,000 | $55k | 9% |
| 625E98700 LIGHTING, MISC.: TROUBLESHOOTING UNDERGROUND AND A | 200 HOUR | $260 | $52k | 8% |
| 625E98700 LIGHTING, MISC.: LOCATING AND MARKING UNDERGROUND | 100 HOUR | $250 | $25k | 4% |
| 625E98000 LIGHTING, MISC.: ANNUAL OPERATION AND INSPECTION O | 82 EACH | $200 | $16k | 3% |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, STYLE B, TYP | 40 EACH | $400 | $16k | 3% |
| 625E10505 ERECTING REUSABLE DOWNED LIGHT POLE, AS PER PLAN | 15 EACH | $1,000 | $15k | 2% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $15,000 | $15k | 2% |
| 809E02000 32" ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBL | 3 EACH | $5,000 | $15k | 2% |