ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Cornerstone Electric INC | R2Miller Cable Company | R3Perram Electric INC | R4Greenwich Electric INC | % of bid |
|---|---|---|---|---|---|---|
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 5,461 FT | $9.00 | $13.00 | $11.08 | $11.20 | 18% |
| 625E29000 TRENCH | 5,173 FT | $9.00 | $5.00 | $7.81 | $8.90 | 17% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B35 | 9 EACH | $3,500 | $3,300 | $2,880 | $3,115 | 12% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 386 FT | $62.00 | $42.00 | $73.45 | $62.00 | 9% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 14 EACH | $1,250 | $1,550 | $1,435 | $1,450 | 6% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B35 | 5 EACH | $3,250 | $3,200 | $2,820 | $3,050 |
| Item | Quantity | R1Cornerstone Electric INC | R2Miller Cable Company | R3Perram Electric INC | R4Greenwich Electric INC |
|---|---|---|---|---|---|
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $500 | $5,000 | $1,400 | $2,400 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E00401 4" CONDUIT, TYPE E, AS PER PLAN | 260 FT | $4.50 | $1.90 | $6.75 | $9.75 |
| 625E25500 CONDUIT, 3", 725.04 | 8 FT | $35.00 | $30.00 | $42.40 | $32.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 4,092 FT | $2.68 | $3.00 | $2.95 | $3.60 | 4% |
| 625E30700 PULL BOX, 725.08, 18" | 8 EACH | $1,200 | $850 | $1,270 | $1,050 | 4% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 78 EACH | $100 | $100 | $129 | $115 | 3% |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 5,173 FT | $1.40 | $2.00 | $1.43 | $2.00 | 3% |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $1,400 | $1,100 | $1,445 | $1,250 | 3% |
| 625E75401 LIGHT POLE REMOVED, AS PER PLAN | 14 EACH | $500 | $200 | $455 | $325 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,500 | $6,800 | $9,400 | $9,545 | 2% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 18 EACH | $325 | $375 | $447 | $330 | 2% |
| 625E00450 CONNECTION, FUSED PULL APART | 36 EACH | $150 | $100 | $184 | $130 | 2% |
| 625E75550 DISTRIBUTION CABLE REMOVED | 5,191 FT | $1.00 | $0.10 | $0.36 | $0.95 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $5,000 | $10,000 | $10,000 | $12,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,000 | $8,100 | $2,100 | $5,800 | 1% |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 14 EACH | $250 | $200 | $560 | $425 | 1% |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 2,655 FT | $1.20 | $2.00 | $0.92 | $1.50 | 1% |
| 625E31510 PULL BOX REMOVED |
| 10 EACH |
| $250 |
| $150 |
| $187 |
| $210 |
| 625E32000 GROUND ROD | 15 EACH | $200 | $225 | $312 | $290 |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $2,000 | $100 | $750 | $1,500 |
| 625E75504 LUMINAIRE REMOVED FOR STORAGE | 18 EACH | $100 | $50.00 | $95.00 | $50.00 |
| 625E75510 POWER SERVICE REMOVED | 2 EACH | $500 | $500 | $750 | $700 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, POWER SERVICE | 1 EACH | $500 | $2,600 | $1,800 | $3,500 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $500 | $500 | $645 | $660 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,200 | $400 | $260 | $750 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $65.00 | $80.00 | $55.00 | $80.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,800 | $3,420 | $5,584 | $9,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,500 | $6,500 | $4,500 | $8,800 |
| 619E16010 FIELD OFFICE, TYPE B | 4 MNTH | $500 | $850 | $3,280 | $2,400 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 5,461 FT | $9 | $49k | 16% |
| 625E29000 TRENCH | 5,173 FT | $9 | $47k | 16% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B35 | 9 EACH | $3,500 | $32k | 11% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 3" | 386 FT | $62 | $24k | 8% |
| 625E14000 LIGHT POLE FOUNDATION, 24" X 6' DEEP | 14 EACH | $1,250 | $18k | 6% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B35 | 5 EACH | $3,250 | $16k | 5% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 4,092 FT | $2.68 | $11k | 4% |
| 625E30700 PULL BOX, 725.08, 18" | 8 EACH | $1,200 | $10k | 3% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 78 EACH | $100 | $8k | 3% |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 5,173 FT | $1.4 | $7k | 2% |