| Item | Quantity | R1Great Lakes Demolition Company | R2Vernon Nagel INC | R3Mark Schaffer Excavating & Trucking | % of bid |
|---|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,889 CY | $174 | $152 | $175 | 14% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 1,364 CY | $216 | $195 | $235 | 12% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 909 CY | $290 | $245 | $300 | 11% |
| 203E20000 EMBANKMENT | 19,500 CY | $12.00 | $14.00 | $10.00 | 10% |
| 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 2,610 SY | $78.50 | $85.00 | $85.00 | 9% |
| 304E20000 AGGREGATE BASE | 2,538 CY | $65.00 | $65.00 | $60.00 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $138,000 |
| Item | Quantity | R1Great Lakes Demolition Company | R2Vernon Nagel INC | R3Mark Schaffer Excavating & Trucking |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $5,000 | $19,160 |
| 202E30700 CONCRETE BARRIER REMOVED | 234 FT | $5.00 | $55.00 | $75.00 |
| 202E38000 GUARDRAIL REMOVED | 1,888 FT | $3.50 | $3.50 | $4.25 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $250 | $250 | $300 |
| 202E47000 BRIDGE TERMINAL ASSEMBLY REMOVED | 4 EACH | $250 | $250 | $300 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $156,000 |
| $100,000 |
| 6% |
| 202E23000 PAVEMENT REMOVED | 15,493 SY | $8.00 | $16.50 | $10.00 | 5% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 2,435 CY | $40.00 | $25.00 | $30.00 | 4% |
| 204E30030 GRANULAR MATERIAL, TYPE D | 877 CY | $75.00 | $65.00 | $45.00 | 3% |
| 832E30000 EROSION CONTROL | 65,000 EACH | $1.00 | $1.00 | $1.00 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3 1/4" | 10,613 SY | $5.00 | $3.70 | $5.00 | 2% |
| 622E41100 PORTABLE BARRIER, UNANCHORED | 1,370 FT | $35.00 | $12.00 | $45.00 | 2% |
| 203E10000 EXCAVATION | 4,688 CY | $10.00 | $14.00 | $28.00 | 2% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, 7 | 4,572 FT | $10.00 | $15.00 | $15.51 | 2% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT22B35 | 10 EACH | $4,400 | $3,527 | $4,000 | 2% |
| 659E10000 SEEDING AND MULCHING | 21,939 SY | $2.00 | $1.30 | $0.92 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 1,675 FT | $21.00 | $21.00 | $22.00 | 1% |
| 609E18001 COMBINATION CURB AND GUTTER, TYPE 3, AS PER PLAN | 1,274 FT | $24.50 | $28.00 | $30.00 | 1% |
| 609E22001 CURB, TYPE 3-B, AS PER PLAN | 2,102 FT | $14.75 | $18.00 | $20.00 | 1% |
| 202E53100 MAILBOX REMOVED | 1 EACH | $100 | $100 | $25.00 |
| 204E10000 SUBGRADE COMPACTION | 12,742 SY | $1.00 | $1.00 | $5.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 877 CY | $20.00 | $15.00 | $20.00 |
| 204E45000 PROOF ROLLING | 4 HOUR | $200 | $250 | $250 |
| 204E50000 GEOTEXTILE FABRIC, TYPE D, 712.09 | 2,632 SY | $5.00 | $1.30 | $2.00 |
| 206E10500 CEMENT | 86 TON | $185 | $225 | $225 |
| 206E11000 CURING COAT | 2,834 SY | $2.70 | $1.85 | $2.00 |
| 206E15020 CEMENT STABILIZED SUBGRADE, 14 INCHES DEEP | 2,834 SY | $5.30 | $6.50 | $6.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 1 EACH | $2,350 | $2,350 | $2,500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,425 | $1,425 | $1,450 |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 3 EACH | $2,275 | $2,275 | $2,300 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 3 EACH | $650 | $650 | $700 |
| 606E60028 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), 60 MPH, | 1 EACH | $31,000 | $31,000 | $32,000 |
| 622E10200 BARRIER TRANSITION | 1 EACH | $7,500 | $6,300 | $8,000 |
| 622E24840 CONCRETE BARRIER END SECTION, TYPE B | 1 EACH | $11,250 | $10,000 | $12,000 |
| 622E90000 BARRIER, MISC.:CONCRETE BARRIER, TYPE A1 | 30 FT | $375 | $305 | $450 |
| 623E38550 MONUMENT ASSEMBLY, TYPE D | 2 EACH | $1,650 | $1,000 | $2,300 |
| 623E40500 REFERENCE MONUMENT, TYPE A | 1 EACH | $1,400 | $500 | $1,000 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 1 EACH | $150 | $165 | $170 |
| 206E20000 TEST ROLLING | 5 HOUR | $200 | $250 | $250 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 286 SY | $70.00 | $65.00 | $60.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 1,097 SY | $1.00 | $0.92 | $0.92 |
| 659E15000 INTER-SEEDING | 1,097 SY | $1.00 | $0.80 | $0.80 |
| 659E20000 COMMERCIAL FERTILIZER | 3.18 TON | $1,000 | $850 | $850 |
| 659E35000 WATER | 121 MGAL | $20.00 | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 4,374 SY | $3.00 | $1.80 | $1.80 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,000 | $2,000 | $1,200 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $7,000 | $12,000 | $8,000 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $15,000 | $15,000 | $20,000 |
| 202E20010 HEADWALL REMOVED | 7 EACH | $400 | $150 | $281 |
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 430 FT | $20.00 | $20.00 | $17.58 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $400 | $250 | $332 |
| 602E20000 CONCRETE MASONRY | 1 CY | $3,000 | $2,900 | $3,669 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 104 FT | $10.00 | $24.00 | $17.39 |
| 605E14021 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC, A | 2,055 FT | $10.00 | $18.00 | $12.04 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 384 FT | $15.00 | $30.00 | $18.16 |
| 611E04400 12" CONDUIT, TYPE B | 60 FT | $65.00 | $85.00 | $69.89 |
| 611E04600 12" CONDUIT, TYPE C | 25 FT | $60.00 | $68.00 | $62.77 |
| 611E07400 18" CONDUIT, TYPE B | 128 FT | $85.00 | $100 | $87.13 |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 2 EACH | $3,200 | $4,800 | $3,035 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 1 EACH | $1,450 | $1,000 | $1,065 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 7 EACH | $400 | $400 | $606 |
| 253E02000 PAVEMENT REPAIR | 63 CY | $400 | $375 | $375 |
| 255E11000 FULL DEPTH PAVEMENT REMOVAL AND RIGID REPLACEMENT, | 135 SY | $120 | $150 | $180 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 48 FT | $5.00 | $3.00 | $3.50 |
| 407E10000 TACK COAT | 2,948 GAL | $3.00 | $2.50 | $3.00 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $590 | $875 | $600 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (7 CY | $590 | $850 | $600 |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 352 FT | $18.25 | $22.00 | $23.00 |
| 609E31001 COMBINATION CURB AND GUTTER, TYPE 9, AS PER PLAN | 191 FT | $20.00 | $22.00 | $25.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 813 LB | $4.00 | $1.00 | $4.00 |
| 638E10801 VALVE BOX ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $1,650 | $500 | $750 |
| 625E00450 CONNECTION, FUSED PULL APART | 20 EACH | $150 | $169 | $200 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 15 EACH | $125 | $169 | $200 |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 10 EACH | $1,500 | $1,739 | $2,000 |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 579 FT | $5.00 | $5.56 | $6.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 1,860 FT | $2.00 | $2.28 | $2.50 |
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 1,679 FT | $13.00 | $18.27 | $21.00 |
| 625E25504 CONDUIT, 3", 725.051 | 173 FT | $5.00 | $11.48 | $13.00 |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 10 EACH | $500 | $589 | $700 |
| 625E29002 TRENCH, 24" DEEP | 1,732 FT | $10.00 | $11.21 | $12.00 |
| 625E30700 PULL BOX, 725.08, 18" | 3 EACH | $1,000 | $1,104 | $1,300 |
| 625E30706 PULL BOX, 725.08, 24" | 1 EACH | $1,100 | $1,430 | $1,500 |
| 625E32000 GROUND ROD | 10 EACH | $250 | $315 | $350 |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $8,500 | $8,715 | $10,000 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 1,732 FT | $1.00 | $1.82 | $2.00 |
| 625E39000 TEMPORARY LIGHTING | 1 LS | $10,000 | $6,525 | $6,500 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, DISCONNECT SWITC | 1 EACH | $1,500 | $1,975 | $2,200 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, ENCLOSURE | 1 EACH | $1,500 | $1,975 | $2,200 |
| 620E00500 DELINEATOR, POST GROUND MOUNTED (TYPE C) | 13 EACH | $85.00 | $239 | $90.00 |
| 620E70000 DELINEATOR, MISC.:HIGH INTENSITY RETRO-REFLECTIVE | 3 EACH | $580 | $1,628 | $600 |
| 621E00100 RPM | 117 EACH | $70.00 | $70.00 | $75.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 34 EACH | $80.00 | $20.00 | $40.00 |
| 626E00102 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 28 EACH | $13.00 | $13.00 | $15.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (UNIDIRECTIONAL) | 20 EACH | $13.00 | $13.00 | $16.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 503 FT | $16.00 | $15.00 | $16.00 |
| 630E08601 SIGN POST REFLECTOR, AS PER PLAN | 20 EACH | $45.00 | $45.00 | $50.00 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 16 EACH | $625 | $625 | $650 |
| 630E80100 SIGN, FLAT SHEET | 277 SF | $17.00 | $17.00 | $20.00 |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 108 SF | $22.50 | $22.50 | $25.00 |
| 630E80224 SIGN, OVERHEAD EXTRUSHEET | 860 SF | $23.00 | $23.00 | $25.00 |
| 630E81100 SIGN ERECTED, FLAT SHEET | 277 SF | $5.00 | $5.00 | $6.00 |
| 630E81200 SIGN ERECTED, EXTRUSHEET | 924 SF | $6.50 | $6.50 | $7.50 |
| 630E84501 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION, | 4 EACH | $865 | $865 | $1,000 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 99 EACH | $10.00 | $10.00 | $12.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 66 EACH | $15.00 | $15.00 | $18.00 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 7 EACH | $85.00 | $85.00 | $100 |
| 630E97900 SIGNING, MISC.: 4" X 6" WOOD POST | 21 FT | $35.00 | $35.00 | $40.00 |
| 630E97900 SIGNING, MISC.: 6" X 8" WOOD POST | 67 FT | $50.00 | $50.00 | $60.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 2.57 MILE | $1,000 | $1,000 | $1,000 |
| 642E00204 LANE LINE, 6", TYPE 1 | 0.38 MILE | $2,000 | $2,000 | $1,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.35 MILE | $4,000 | $4,000 | $1,200 |
| 644E00500 STOP LINE | 33 FT | $8.00 | $8.00 | $10.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 116 FT | $6.00 | $6.00 | $10.00 |
| 644E01300 LANE ARROW | 3 EACH | $100 | $100 | $120 |
| 644E01350 LANE REDUCTION ARROW | 3 EACH | $150 | $150 | $275 |
| 644E01510 DOTTED LINE, 6" | 870 FT | $1.00 | $1.00 | $1.20 |
| 644E20800 YIELD LINE | 54 FT | $7.00 | $7.00 | $20.00 |
| 204E50000 GEOTEXTILE FABRIC, TYPE B, 712.09 | 169 SY | $3.00 | $6.00 | $6.25 |
| 657E10001 RIPRAP FOR TREE PROTECTION, AS PER PLAN | 169 SY | $80.00 | $16.00 | $20.00 |
| 653E10001 TOPSOIL FURNISHED AND PLACED, AS PER PLAN | 16 CY | $70.00 | $60.00 | $60.00 |
| 209E60200 LINEAR GRADING | 18 STA | $500 | $151 | $500 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 100 CY | $65.00 | $30.00 | $60.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 24 HOUR | $150 | $75.00 | $100 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,340 FT | $1.50 | $1.50 | $3.00 |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $3,260 | $3,850 | $2,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $16,000 | $16,000 | $15,000 |
| 614E12500 REPLACEMENT SIGN | 3 EACH | $200 | $192 | $150 |
| 614E12600 REPLACEMENT DRUM | 3 EACH | $56.00 | $56.00 | $55.00 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 20 CY | $200 | $490 | $600 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (ONE-WAY) | 29 EACH | $8.00 | $8.00 | $12.00 |
| 614E13350 OBJECT MARKER, ONE WAY | 29 EACH | $16.00 | $16.00 | $22.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 19 SNMT | $900 | $900 | $1,300 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6" | 0.76 MILE | $2,000 | $2,000 | $2,500 |
| 614E40051 BUSINESS ENTRANCE SIGN, AS PER PLAN | 4 EACH | $225 | $225 | $250 |
| 616E10000 WATER | 84 MGAL | $20.00 | $1.00 | $1.00 |
| 617E10100 COMPACTED AGGREGATE | 163 CY | $65.00 | $75.00 | $130 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $24,485 | $25,000 | $35,000 |
| 108E10000 CPM PROGRESS SCHEDULE | 1 LS | $6,500 | $7,500 | $2,500 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25,000 | $75,000 |
| 619E16021 FIELD OFFICE, TYPE C, AS PER PLAN | 14 MNTH | $1,000 | $2,200 | $3,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,000 | $30,000 | $50,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 1,889 CY | $174 | $329k | 11% |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 1,364 CY | $216 | $295k | 9% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 909 CY | $290 | $264k | 8% |
| 203E20000 EMBANKMENT | 19,500 CY | $12 | $234k | 8% |
| 452E12011 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P, | 2,610 SY | $78.5 | $205k | 7% |
| 304E20000 AGGREGATE BASE | 2,538 CY | $65 | $165k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $138,000 | $138k | 4% |
| 202E23000 PAVEMENT REMOVED | 15,493 SY | $8 | $124k | 4% |
| 653E10000 TOPSOIL FURNISHED AND PLACED | 2,435 CY | $40 | $97k | 3% |
| 204E30030 GRANULAR MATERIAL, TYPE D | 877 CY | $75 | $66k | 2% |