D08-LG-FY2026/2027
D08 County · est $2.6M
Bid dateThursday, June 12—
D08 County · est $2.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 66 more items below.
| Item | Quantity | R1Capital Electric Line Builders INC | % of bid |
|---|---|---|---|
| 625E50100 TROUBLESHOOTING UNDERGROUND AND ABOVE GROUND CIRCU | 1,000 EACH | $245 | 13% |
| 625E98700 LIGHTING, MISC.: MARKING EXISTING LIGHTING CABLE | 2,000 HOUR | $123 | 13% |
| 625E50301 FRANGIBLE BASE, AS PER PLAN | 200 EACH | $952 | 10% |
| 625E27600 LUMINAIRE, MISC.: LUMINAIRE MAINTENANCE | 5,929 EACH | $30.72 | 9% |
| 625E50500 SPECIAL - EMERGENCY RESPONSE-KNOCKDOWN, ROADWAY HA | 300 EACH | $491 | 8% |
| 625E10500 LIGHT POLE, MISC.: STRUCTURE MAINTENANCE FOR LIGH | 3,856 EACH | $32.22 | 6% |
| 625E98000 LIGHTING, MISC.: LAMP FOR LUMINAIRE, CONVENTIONAL | 2,448 EACH | $43.86 | 6% |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN | — | $2,066 | 4% |
| 625E27600 LUMINAIRE, MISC.: LUMINAIRE, CONVENTIONAL | 200 EACH | $410 | 4% |
| 625E98000 LIGHTING, MISC.: CONNECTOR KIT, KTK FUSE | 1,500 EACH | $41.66 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 5 EACH | $12,448 | 3% |
| 625E98000 LIGHTING, MISC.: LYTLE TUNNEL LED INSPECTION AND | 12 EACH | $4,965 | 3% |
| 625E23201 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA | 15,000 FT | $3.65 | 3% |
| 625E50401 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO | 5 EACH | $10,881 | 3% |
| 625E18600 BRACKET ARM, MISC.: CONVENTIONAL LIGHT POLE | 40 EACH | $1,339 | 3% |
| 625E13500 LIGHT TOWER, MISC.: STRUCTURE MAINTENANCE FOR LIG | 520 EACH | $92.26 | 2% |
| 625E14401 LIGHT POLE FOUNDATION REPAIR, AS PER PLAN | 40 EACH | $1,091 | 2% |
| 625E11200 LIGHT TOWER, BB100 | 1 EACH | $36,143 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $34,265 | 2% |
| 625E98000 LIGHTING, MISC.: LAMP FOR LUMINAIRE, TOWER | 764 EACH | $43.86 | 2% |
| Item | Quantity | R1Capital Electric Line Builders INC |
|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,456 |
| 611E00400 4" CONDUIT, TYPE E | 50 FT | $6.73 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 80 EACH | $67.27 |
| 625E10495 LIGHT POLE, LOW MAST, AS PER PLAN, (REPLACEMENTS) | 2 EACH | $4,231 |
| 625E10505 ERECTING REUSABLE DOWNED LIGHT POLE, AS PER PLAN | 50 EACH | $641 |
| 625E13500 LIGHT TOWER, MISC.: PLUG | 25 EACH | $119 |
| 625E13500 LIGHT TOWER, MISC.:JUNCTION BOX | 10 EACH | $1,953 |
| 625E13500 LIGHT TOWER, MISC.:PLUG ON TOWER RING | 10 EACH | $149 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 625E13500 LIGHT TOWER, MISC.:REPLACE S-O CABLE | 1 EACH | $1,922 |
| 625E14300 MEDIAN LIGHT POLE FOUNDATION, 8' DEEP | 1 EACH | $31,425 |
| 625E18600 BRACKET ARM, MISC.: INSTALLATION OF REUSABLE BRAC | 40 EACH | $123 |
| 625E18600 BRACKET ARM, MISC.: LOW MAST LIGHT POLE | 5 EACH | $645 |
| 625E19101 BALLAST FOR TOWER LIGHT FIXTURE, AS PER PLAN | 50 EACH | $281 |
| 625E23301 NO. 2 AWG 2400 VOLT DISTRIBUTION CABLE, AS PER PLA | 1,000 FT | $4.76 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 7,500 FT | $1.30 |
| 625E24101 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 1,000 FT | $20.21 |
| 625E24301 1-1/2" DUCT CABLE WITH TWO NO. 2 AWG 2400 VOLT CAB | 1,000 FT | $27.74 |
| 625E24321 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 1,000 FT | $27.65 |
| 625E25401 CONDUIT, 2", 725.04, AS PER PLAN | 500 FT | $14.22 |
| 625E25402 CONDUIT, 2", 725.05 | 100 FT | $6.17 |
| 625E25900 CONDUIT, JACKED OR DRILLED, 3" | 1,000 FT | $29.16 |
| 625E26263 LUMINAIRE, HIGH MAST, SOLID STATE (LED), AS PER PL | 2 EACH | $30.66 |
| 625E27600 LUMINAIRE, MISC.: LUMINAIRE, LOW MAST | 20 EACH | $1,397 |
| 625E27600 LUMINAIRE, MISC.: LUMINAIRE, TOWER | 15 EACH | $1,428 |
| 625E27600 LUMINAIRE, MISC.: LUMINAIRE, UNDERDECK OR WALL MO | 10 EACH | $709 |
| 625E27800 BALLAST, MISC.: BALLAST FOR LOW MAST LIGHT FIXTUR | 20 EACH | $281 |
| 625E27800 BALLAST, MISC.: BALLAST FOR UNDERDECK LIGHT FIXTU | 5 EACH | $171 |
| 625E29003 TRENCH, 24" DEEP, AS PER PLAN | 600 FT | $9.92 |
| 625E29901 JUNCTION BOX, AS PER PLAN | 1 EACH | $2,454 |
| 625E30700 PULL BOX, 725.08, 18" | 10 EACH | $1,346 |
| 625E32000 GROUND ROD | 2 EACH | $226 |
| 625E32001 GROUND ROD, AS PER PLAN | 10 EACH | $226 |
| 625E33101 CIRCUIT BREAKER, TOWER LIGHTING, AS PER PLAN | 10 EACH | $721 |
| 625E34451 CONTROL CENTER CABINET, COMPLETE, AS PER PLAN, 100 | 5 EACH | $5,381 |
| 625E34507 CONTROL CENTER MAINTENANCE ITEM, AS PER PLAN, CIRC | 5 EACH | $749 |
| 625E34507 CONTROL CENTER MAINTENANCE ITEM, AS PER PLAN, CONT | 130 EACH | $128 |
| 625E34507 CONTROL CENTER MAINTENANCE ITEM, AS PER PLAN, DISC | 5 EACH | $1,345 |
| 625E34507 CONTROL CENTER MAINTENANCE ITEM, AS PER PLAN, FUSE | 50 EACH | $58.16 |
| 625E34507 CONTROL CENTER MAINTENANCE ITEM, AS PER PLAN, H-O- | 10 EACH | $171 |
| 625E34507 CONTROL CENTER MAINTENANCE ITEM, AS PER PLAN, LIGH | 10 EACH | $281 |
| 625E34507 CONTROL CENTER MAINTENANCE ITEM, AS PER PLAN, PHOT | 5 EACH | $281 |
| 625E35101 REERECT EXISTING LUMINAIRE, AS PER PLAN | 10 EACH | $30.66 |
| 625E36201 POWER CABLE FOR LIGHT TOWER, AS PER PLAN | 500 FT | $4.53 |
| 625E50001 REPAIRING UNDERGROUND BREAK OF CABLE IN DUCT OR CO | 50 EACH | $601 |
| 625E50451 SECONDARY SURGE PROTECTOR, AS PER PLAN | 5 EACH | $58.16 |
| 625E75351 LIGHT TOWER REMOVED, AS PER PLAN | 1 EACH | $6,362 |
| 625E75500 LIGHT POLE FOUNDATION REMOVED | 5 EACH | $502 |
| 625E75504 LUMINAIRE REMOVED FOR STORAGE | 5 EACH | $30.66 |
| 625E75540 LIGHT TOWER FOUNDATION REMOVED | 1 EACH | $502 |
| 625E75801 DISCONNECT CIRCUIT, AS PER PLAN | 6 EACH | $123 |
| 625E76000 ARC FLASH CALCULATIONS AND LABEL, (BY LOCATION) | 10 EACH | $2,750 |
| 625E98000 LIGHTING, MISC.: FUSED, PULL-APART CONNECTOR KIT | 300 EACH | $83.79 |
| 625E98000 LIGHTING, MISC.: LAMP FOR LUMINAIRE, LOW MAST | 134 EACH | $43.86 |
| 625E98000 LIGHTING, MISC.: LAMP FOR LUMINAIRE, UNDERDECK OR | 341 EACH | $43.86 |
| 625E98000 LIGHTING, MISC.: PHOTOELECTRIC CELL | 50 EACH | $106 |
| 625E98000 LIGHTING, MISC.: REMOVAL AND RE-ERECTION OF LIGHT | 50 EACH | $245 |
| 625E98000 LIGHTING, MISC.: SERVICE TO UNDERPASS LIGHTING RE | 1 EACH | $1,962 |
| 625E98100 LIGHTING, MISC.: REMOVAL OF CABLE IN EXISTING DUC | 1,500 FT | $1.23 |
| 631E97700 SIGN LIGHTING MISC.: REMOVAL OF SIGN SERVICE AND | 3 EACH | $368 |
| 631E97700 SIGN LIGHTING MISC.: REMOVAL OF SIGN WIRING AND D | 3 EACH | $368 |
| 631E97700 SIGN LIGHTING MISC.: REPAIR OF WEIGH STATION "OPE | 10 EACH | $1,345 |
| 632E69350 POWER CABLE, MISC.: TEMPORARY OVERHEAD CABLE (TRI | 1,000 FT | $2.00 |
| 632E89301 WOOD POLE, AS PER PLAN | 5 EACH | $1,971 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 125 HOUR | $88.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $16,992 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $33,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E50100 TROUBLESHOOTING UNDERGROUND AND ABOVE GROUND CIRCU | 1,000 EACH | $245.3 | $245k | 9% |
| 625E98700 LIGHTING, MISC.: MARKING EXISTING LIGHTING CABLE | 2,000 HOUR | $122.65 | $245k | 9% |
| 625E50301 FRANGIBLE BASE, AS PER PLAN | 200 EACH | $952.16 | $190k | 7% |
| 625E27600 LUMINAIRE, MISC.: LUMINAIRE MAINTENANCE | 5,929 EACH | $30.72 | $182k | 7% |
| 625E50500 SPECIAL - EMERGENCY RESPONSE-KNOCKDOWN, ROADWAY HA | 300 EACH | $490.6 | $147k | 6% |
| 625E10500 LIGHT POLE, MISC.: STRUCTURE MAINTENANCE FOR LIGH | 3,856 EACH | $32.22 | $124k | 5% |
| 625E98000 LIGHTING, MISC.: LAMP FOR LUMINAIRE, CONVENTIONAL | 2,448 EACH | $43.86 | $107k | 4% |
| 625E10491 LIGHT POLE, CONVENTIONAL, AS PER PLAN | — | $2,066 | $83k | 3% |
| 625E27600 LUMINAIRE, MISC.: LUMINAIRE, CONVENTIONAL | 200 EACH | $410.16 | $82k | 3% |
| 625E98000 LIGHTING, MISC.: CONNECTOR KIT, KTK FUSE | 1,500 EACH | $41.66 | $62k | 2% |