D06-ITS MAINT-FY2026
D06 County
Bid dateThursday, July 17—
D06 County
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 34 more items below.
| Item | Quantity | R1Asplundh Construction LLC | R2Danbert Electrical CORP | R3Complete General Construction Company | R4Ruhlin Company | R5Capital Electric Line Builders INC | R6Perram Electric INC | R7Miller Cable Company | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 204E10000 SUBGRADE COMPACTION | 2,095 SY | $50.00 | $6.30 | $6.00 | $2.00 | $5.97 | $3.05 | $3.50 | 11% |
| 304E20000 AGGREGATE BASE | 525 CY | $160 | $94.80 | $150 | $144 | $267 | $116 | $105 | 9% |
| 809E61040 |
| Item | Quantity | R1Asplundh Construction LLC | R2Danbert Electrical CORP | R3Complete General Construction Company | R4Ruhlin Company | R5Capital Electric Line Builders INC | R6Perram Electric INC | R7Miller Cable Company |
|---|---|---|---|---|---|---|---|---|
| 204E45000 PROOF ROLLING | 12 HOUR | $385 | $200 | $260 | $829 | $311 | $340 | $157 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 3 EACH |
| $24,000 |
| $68,800 |
| $50,000 |
| $45,000 |
| $64,177 |
| $53,195 |
| $65,000 |
| 7% |
| 624E10000 MOBILIZATION | 1 LS | $70,000 | $90,200 | $50,000 | $67,500 | $115,697 | $100,000 | $40,000 | 7% |
| 203E10000 EXCAVATION | 525 CY | $110 | $76.50 | $50.00 | $102 | $155 | $103 | $82.00 | 6% |
| 809E65990 ITS DEVICE, MISC.:MAINTENANCE OF EXISTING POWER SE | 6 EACH | $9,271 | $3,350 | $5,000 | $9,401 | $26,658 | $12,810 | $15,000 | 6% |
| 625E23308 DISTRIBUTION CABLE, MISC.:INSTALL ONLY | 20,000 FT | $2.60 | $2.20 | $2.25 | $1.82 | $2.54 | $2.32 | $3.00 | 5% |
| 625E31600 PULL BOX, MISC.:MOW PAD | 60 EACH | $857 | $748 | $1,500 | $1,500 | $1,863 | $2,756 | $3,500 | 5% |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN A | 13 EACH | $3,668 | $560 | $3,700 | $4,707 | $4,628 | $7,277 | $4,600 | 5% |
| 809E02000 32" ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBL | 22 EACH | $2,146 | $2,580 | $3,900 | $4,290 | $3,432 | $4,990 | $5,200 | 5% |
| 809E61090 CCTV LOWERING UNIT | 3 EACH | $15,000 | $14,250 | $11,675 | $12,259 | $11,959 | $23,240 | $16,500 | 5% |
| 809E65000 ITS CABINET - GROUND MOUNTED | 4 EACH | $10,500 | $12,040 | $10,000 | $13,846 | $9,741 | $8,255 | $12,500 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $42,000 | $97,500 | $60,000 | $37,882 | $77,246 | $202,025 | $25,000 | 4% |
| 625E29010 TRENCH, 30" DEEP | 4,475 FT | $8.00 | $7.69 | $12.00 | $14.21 | $21.42 | $26.06 | $15.00 | 4% |
| 809E02002 32" ITS PULL BOX WITH PAD AND HINGED LID ASSEMBLY, | 11 EACH | $3,200 | $4,080 | $5,000 | $6,461 | $4,799 | $6,290 | $7,800 | 4% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 13 EACH | $2,579 | $2,475 | $3,900 | $2,094 | $3,611 | $3,805 | $2,800 | 3% |
| 614E13800 MAINTENANCE OF TRAFFIC, ONE LANE CLOSURE ON A 4 LA | 10 EACH | $3,300 | $6,906 | $4,000 | $5,000 | $6,893 | $3,290 | $8,000 | 3% |
| 809E25000 CONDUIT, MULTICELL, MISC.:4", JACKED OR DRILLED, I | 500 FT | $55.00 | $22.00 | $19.00 | $55.68 | $45.20 | $52.20 | $55.00 | 3% |
| 632E86131 STRAIN POLE, TYPE TC-81.11, DESIGN 10, AS PER PLAN | 2 EACH | $12,000 | $13,246 | $12,750 | $17,512 | $14,233 | $13,740 | $12,750 | 2% |
| 622E90200 BARRIER, MISC.:CONCRETE ENCASEMENT BOX OVER EXPOSE | 10 EACH | $2,266 | $4,080 | $1,825 | $1,894 | $5,304 | $11,100 | $11,750 | 2% |
| 601E21060 TIED CONCRETE BLOCK MAT WITH TYPE 2 UNDERLAYMENT | 100 SY | $78.00 | $119 | $250 | $246 | $186 | $91.65 | $45.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 9 EACH | $56.00 | $210 | $150 | $289 | $109 | $280 | $110 |
| 625E25410 CONDUIT, 2", 725.052 | 1,075 FT | $5.00 | $7.53 | $12.00 | $13.29 | $6.47 | $12.70 | $12.00 |
| 625E25506 CONDUIT, 3", 725.052 | 200 FT | $8.00 | $11.50 | $19.00 | $14.52 | $6.46 | $17.05 | $16.00 |
| 625E29931 MEDIAN JUNCTION BOX, AS PER PLAN | 7 EACH | $1,720 | $4,260 | $12,000 | $2,896 | $7,679 | $5,425 | $45,000 |
| 625E30700 PULL BOX, 725.08, 18" | 17 EACH | $1,200 | $1,162 | $1,400 | $1,312 | $1,760 | $1,485 | $1,800 |
| 625E31510 PULL BOX REMOVED | 8 EACH | $324 | $232 | $350 | $474 | $1,128 | $455 | $325 |
| 625E32001 GROUND ROD, AS PER PLAN | 25 EACH | $200 | $381 | $350 | $518 | $233 | $340 | $350 |
| 625E36010 UNDERGROUND WARNING/MARKING TAPE | 4,475 FT | $1.40 | $0.12 | $2.00 | $2.91 | $1.36 | $1.95 | $2.50 |
| 632E64000 STRAIN POLE FOUNDATION | 2 EACH | $2,464 | $9,720 | $9,800 | $8,252 | $18,748 | $9,610 | $12,000 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN B | 1 EACH | $3,500 | $982 | $13,500 | $13,504 | $20,200 | $17,385 | $16,000 |
| 809E25000 CONDUIT, MULTICELL, MISC.:4", INSTALL ONLY | 1,000 FT | $1.50 | $12.10 | $20.00 | $6.31 | $5.33 | $25.80 | $15.00 |
| 809E25000 CONDUIT, MULTICELL, MISC.:INSTALL ONLY THROUGH EXI | 3,000 FT | $5.50 | $8.80 | $4.00 | $3.03 | $10.15 | $5.16 | $5.00 |
| 809E51000 ITS POWER SERVICE, GROUND MOUNTED, 120/240V, 60 AM | 1 EACH | $5,000 | $9,540 | $7,700 | $7,090 | $9,708 | $7,620 | $25,000 |
| 809E52100 ITS POWER SERVICE, GROUND MOUNTED, 240/480V, 100 A | 1 EACH | $6,000 | $12,540 | $8,700 | $9,435 | $26,658 | $11,520 | $24,000 |
| 809E55000 ITS POWER SERVICE, POLE MOUNTED, 120/240V, 60 AMP | 1 EACH | $4,000 | $8,580 | $8,650 | $6,340 | $7,448 | $5,480 | $18,500 |
| 809E56000 ITS POWER SERVICE, POLE MOUNTED, 240/480V, 60 AMP | 1 EACH | $4,500 | $9,780 | $8,650 | $6,340 | $26,658 | $8,010 | $15,200 |
| 809E60000 CCTV IP-CAMERA SYSTEM, PTZ | 1 EACH | $5,000 | $12,060 | $10,200 | $9,140 | $8,694 | $7,522 | $10,500 |
| 809E60040 CCTV IP-CAMERA SYSTEM, QUAD MULTI-VIEW FIXED WITH | 3 EACH | $6,530 | $10,780 | $10,200 | $13,718 | $7,519 | $14,240 | $9,500 |
| 809E61100 CCTV LOWERING UNIT, INSTALLATION ONLY | 1 EACH | $1,549 | $1,710 | $1,900 | $1,000 | $3,159 | $4,765 | $7,500 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 1,050 FT | $2.20 | $3.51 | $3.00 | $4.76 | $1.79 | $3.66 | $4.00 |
| 809E65100 STEP-DOWN TRANSFORMER, 3KVA | 1 EACH | $12,000 | $2,800 | $11,000 | $2,651 | $13,565 | $17,720 | $22,000 |
| 809E65990 ITS DEVICE, MISC.:REMOVAL AND DELIVERY OF STEEL PO | 4 EACH | $587 | $880 | $1,400 | $1,364 | $3,326 | $6,510 | $5,000 |
| 809E65990 ITS DEVICE, MISC.:REMOVAL AND DELIVERY OF WOOD POL | 22 EACH | $587 | $892 | $1,625 | $1,364 | $2,255 | $2,580 | $1,850 |
| 625E25930 CONDUIT, MISC.:CONDUIT REPAIR | 1 EACH | $3,774 | $1,680 | $1,600 | $2,800 | $2,255 | $6,300 | $3,250 |
| 625E31600 PULL BOX, MISC.:INSTALL ONLY | 6 EACH | $647 | $788 | $1,200 | $1,955 | $1,580 | $4,320 | $2,600 |
| 632E90400 SIGNALIZATION, MISC.:CLEARING OF ITS SITES | 10 EACH | $1,911 | $2,750 | $1,000 | $1,578 | $3,159 | $4,940 | $3,500 |
| 809E65990 ITS DEVICE, MISC.:REMOVAL OF CABINET | 3 EACH | $513 | $390 | $650 | $909 | $2,312 | $1,290 | $500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR | $99.00 | $125 | $110 | $85.00 | $90.40 | $100 | $80.00 |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 2 SNMT | $3,135 | $1,200 | $2,300 | $1,400 | $2,145 | $2,820 | $1,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,150 | $7,560 | $7,000 | $6,812 | $13,559 | $30,723 | $8,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,500 | $45,780 | $10,500 | $2,280 | $11,300 | $18,000 | $40,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 204E10000 SUBGRADE COMPACTION | 2,095 SY | $50 | $105k | 9% |
| 304E20000 AGGREGATE BASE | 525 CY | $160 | $84k | 7% |
| 809E61040 CCTV POLE, 70' TALL | 3 EACH | $24,000 | $72k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $70,000 | $70k | 6% |
| 203E10000 EXCAVATION | 525 CY | $110 | $58k | 5% |
| 809E65990 ITS DEVICE, MISC.:MAINTENANCE OF EXISTING POWER SE | 6 EACH | $9,271 | $56k | 5% |
| 625E23308 DISTRIBUTION CABLE, MISC.:INSTALL ONLY | 20,000 FT | $2.6 | $52k | 4% |
| 625E31600 PULL BOX, MISC.:MOW PAD | 60 EACH | $857 | $51k | 4% |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN A | 13 EACH | $3,668 | $48k | 4% |
| 809E02000 32" ITS PULL BOX WITH PAD AND STANDARD LID ASSEMBL | 22 EACH | $2,146 | $47k | 4% |