BEL-SR 149-15.10
BEL County · est $0.5M
Bid dateThursday, January 15—
Awarded toSHELLY & SANDS INC$558,224.5
BEL County · est $0.5M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 530E50010 SPECIAL - RETAINING WALL, STACKED CELLULAR WALL Section 6 - RETAINING WALLS (RFWN: 1014807) - Totals Awd $256,569.00 2 $235,445.00 3 $227,547.68 4 $310,509.58 | 1,581 SF | $87 | $138k | 25% |
| 601E34000 ROCK CHANNEL PROTECTION, TYPE A WITHOUT FILTER | 469 CY | $115 | $54k | 10% |
| 511E53010 CLASS QC1 CONCRETE, MISC.: SCOUR PROTECTION | 53 CY | $740 | $39k | 7% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $33,925 | $34k | 6% |
| 519E11100 PATCHING CONCRETE STRUCTURE | 150 SF | $210 | $32k | 6% |
| 203E10000 EXCAVATION | 539 CY | $48 | $26k | 5% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $46,470.00 2 $66,835.50 3 $96,491.60 4 $44,530.00 | 1 LS | $25,000 | $25k | 4% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 61 CY | $388 | $24k | 4% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $400 | $20k | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $19,000 | $19k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Rudzik Excavating INC | R3Eclipse CO LLC | R4Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|---|
| 530E50010 SPECIAL - RETAINING WALL, STACKED CELLULAR WALL Section 6 - RETAINING WALLS (RFWN: 1014807) - Totals Awd $256,569.00 2 $235,445.00 3 $227,547.68 4 $310,509.58 | 1,581 SF | $87.00 | $70.00 | $46.92 | $81.50 | 27% |
| 601E34000 ROCK CHANNEL PROTECTION, TYPE A WITHOUT FILTER | 469 CY | $115 | $135 | $138 | $115 | 11% |
| 511E53010 CLASS QC1 CONCRETE, MISC.: SCOUR PROTECTION | 53 CY | $740 | $610 | $807 | $708 | 8% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $33,925 | $26,000 | $23,545 | $10,000 | 7% |
| 519E11100 PATCHING CONCRETE STRUCTURE | 150 SF | $210 | $188 | $30.87 | $91.00 | 6% |
| 203E10000 EXCAVATION | 539 CY | $48.00 | $65.00 | $70.04 | $50.00 | 5% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $46,470.00 2 $66,835.50 3 $96,491.60 4 $44,530.00 | 1 LS | $25,000 | $43,716 | $76,974 | $22,100 | 5% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 61 CY | $388 | $546 | $388 | $338 | 5% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $400 | $100 | $568 | $586 | 4% |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $19,000 | $16,000 | $82,241 | $91,180 | 4% |
| 512E10600 CONCRETE REPAIR BY EPOXY INJECTION | 150 FT | $95.00 | $188 | $43.93 | $89.50 | 3% |
| 441E70300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 Section 3 - PAVEMENT - Totals Awd $67,775.50 2 $84,134.55 3 $68,923.60 4 $76,200.03 | 449 (35 CY | $388 | $549 | $388 | $434 | 3% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN Section 1 - ROADWAY - Totals Awd $88,900.50 2 $89,810.00 3 $88,174.66 4 $75,084.52 | 275 FT | $41.40 | $49.00 | $41.40 | $51.38 | 2% |
| 441E70100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 25 CY | $450 | $543 | $450 | $655 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $11,000 | $5,000 | $7,322 | $6,500 | 2% |
| 304E20000 AGGREGATE BASE | 86 CY | $120 | $140 | $133 | $149 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 345 SY | $25.00 | $16.50 | $25.00 | $27.21 | 2% |
| 503E21320 UNCLASSIFIED EXCAVATION, INCLUDING ROCK | 1 LS | $8,000 | $6,625 | $4,500 | $10,500 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $7,220 | $12,420 | $4,126 | $7,730 | 1% |
| 202E23000 PAVEMENT REMOVED | 327 SY | $20.00 | $19.00 | $24.76 | $29.17 | 1% |
| Item | Quantity | R1Shelly & Sands INC | R2Rudzik Excavating INC | R3Eclipse CO LLC | R4Ohio-west Virginia Excavating CO |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 263 FT | $7.50 | $6.00 | $2.00 | $8.46 |
| 203E20000 EMBANKMENT | 8 CY | $60.00 | $100 | $33.39 | $103 |
| 204E10000 SUBGRADE COMPACTION | 395 SY | $6.00 | $3.00 | $1.21 | $2.91 |
| 204E21001 GRANULAR EMBANKMENT, AS PER PLAN | 32 CY | $154 | $128 | $139 | $205 |
| 204E50000 GEOTEXTILE FABRIC , 712.09 TYPE D | 476 SY | $3.00 | $3.00 | $3.53 | $7.76 |
| 601E34200 ROCK CHANNEL PROTECTION, TYPE C WITHOUT FILTER | 62 CY | $105 | $135 | $113 | $216 |
| 659E10000 SEEDING AND MULCHING | 696 SY | $4.50 | $3.00 | $4.45 | $5.58 |
| 659E20000 COMMERCIAL FERTILIZER | 0.09 TON | $1,250 | $400 | $900 | $1,550 |
| 659E31000 LIME | 0.14 ACRE | $150 | $5.00 | $10.00 | $200 |
| 659E35000 WATER | 5 MGAL | $1.00 | $0.05 | $0.50 | $1.00 |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $68,715.50 2 $78,809.95 3 $79,978.40 4 $76,464.96 | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 95 GAL | $3.50 | $3.41 | $3.50 | $19.39 |
| 621E00100 RPM | 4 EACH | $500 | $550 | $500 | $620 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $70.00 | $50.00 | $68.34 | $40.60 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $11.50 | $13.00 | $11.50 | $14.27 |
| 646E10010 EDGE LINE, 6" | 0.1 MILE | $22,300 | $25,735 | $22,300 | $44,275 |
| 646E10200 CENTER LINE Section 4 - TRAFFIC CONTROL - Totals Awd $6,344.00 2 $6,770.00 3 $6,337.36 4 $10,662.44 | 0.05 MILE | $35,300 | $34,370 | $35,300 | $70,100 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,200 | $3,190 | $2,900 | $3,600 |
| 616E10000 WATER Section 5 - MAINTENANCE OF TRAFFIC - Totals Awd $23,450.00 2 $8,195.00 3 $32,646.70 4 $32,950.00 | 5 MGAL | $50.00 | $1.00 | $272 | $10.00 |
| 202E11200 PORTIONS OF STRUCTURE REMOVED | 1 LS | $3,500 | $7,500 | $2,837 | $7,960 |
| 510E09950 DOWEL HOLES WITH CEMENT GROUT | 148 EACH | $24.00 | $40.00 | $66.21 | $50.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,250 | $5,700 | $8,071 | $8,200 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →