| Rank 2of 4 | BEL-SR 7-00.94Drainage | Belmont | Apr 2026 | $219k | $199k |
| Rank 2of 3 | WAS-SR 26-03.75Signals | Washington | Apr 2026 | $977k | $934k |
| Rank 5of 5 | MOE-TR 2214-00.06Bridge | Monroe | Jan 2026 | $1.20M | $921k |
| Rank 4of 4 | BEL-SR 149-15.10Earthwork | Belmont | Jan 2026 | $626k | $558k |
| Rank 6of 6 | MOE-TR 1004-02.27Bridge | Monroe | Dec 2025 | $2.34M | $1.21M |
| Rank 5of 6 | JEF-SR 7-30.92Drainage | Jefferson | Oct 2025 | $2.30M | $1.47M |
| Rank 8of 9 | COL-SR 164-01.66Drainage | Columbiana | Oct 2025 | $718k | $478k |
| Lowof 3 | HAS-SR 212-00.41Drainage | Harrison | Aug 2025 | $1.47M | $1.47M |
| Rank 8of 8 | WAS-Beverly SidewalkSafety | Washington | Aug 2025 | $687k | $326k |
| Rank 4of 5 | HAS-SR 149-01.17Drainage | Harrison | Jul 2025 | $1.05M | $711k |
| Rank 3of 4 | MED-IR 271-05.64Earthwork | Medina | Jul 2025 | $552k | $449k |
| Lowof 4 | BEL-IR 70-10.08Drainage | Belmont | Jul 2025 | $349k | $349k |
| Rank 6of 7 | BEL-SR 149-02.11Drainage | Belmont | Jul 2025 | $1.69M | $879k |
| Rank 3of 5 | LAW-SR 217-02.53Earthwork | Lawrence | Jun 2025 | $519k | $445k |
| Rank 3of 4 | COS-SR 93-00.75Earthwork | Coshocton | May 2025 | $2.29M | $1.94M |
| Rank 2of 5 | JEF-SR 150-03.544Signals | Jefferson | May 2025 | $619k | $499k |
| Rank 2of 3 | BEL-CR 4-27.05Bridge | Belmont | May 2025 | $1.43M | $1.42M |
| Rank 3of 4 | JEF-SR 43-08.40Signals | Jefferson | May 2025 | $1.45M | $1.22M |
| Lowof 4 | WAY-SR 241-01.32Earthwork | Wayne | May 2025 | $413k | $413k |
| Lowof 4 | BEL-SR 7-10.96Earthwork | Belmont | Apr 2025 | $887k | $887k |
| Rank 4of 5 | WAS-SR 550-16.24Drainage | Washington | Apr 2025 | $609k | $514k |
| Lowof 5 | BEL-SR 149-12.20Earthwork | Belmont | Apr 2025 | $119k | $119k |
| Rank 4of 6 | NOB-Mill St.-00.07Bridge | Noble | Apr 2025 | $1.09M | $774k |
| Lowof 8 | BEL-SR 148-08.45Earthwork | Belmont | Apr 2025 | $489k | $489k |
| Rank 2of 5 | BEL-SR 647-03.29Earthwork | Belmont | Feb 2025 | $638k | $619k |
| Rank 3of 4 | MOE-TR 183-(00.13)(00.50)Bridge | Monroe | Feb 2025 | $1.20M | $1.03M |
| Rank 3of 5 | LAW-SR 775-19.50Earthwork | Lawrence | Feb 2025 | $852k | $721k |
| Rank 3of 3 | WAS-SR 60-15.79Earthwork | Washington | Feb 2025 | $943k | $818k |
| Rank 3of 3 | MOE-SR 537-00.32Earthwork | Monroe | Feb 2025 | $2.18M | $1.65M |
| Rank 2of 5 | HOL-SR 515-00.15Drainage | Holmes | Jan 2025 | $685k | $595k |
| Rank 7of 8 | MUS-SR 146-29.36Earthwork | Muskingum | Oct 2024 | $994k | $690k |
| Rank 6of 6 | WAS-SR 339-08.64Drainage | Washington | Oct 2024 | $1.39M | $844k |
| Rank 2of 5 | BEL-SR 379-02.23Earthwork | Belmont | Sep 2024 | $480k | $480k |
| Rank 2of 5 | ATH-SR 690-04.21Earthwork | Athens | May 2024 | $717k | $638k |
| Lowof 3 | ATH-SR 144-12.08Earthwork | Athens | May 2024 | $793k | $793k |
| Rank 2of 6 | JAC-US 35-15.36 SlideEarthwork | Jackson | May 2024 | $331k | $309k |
| Lowof 4 | MRG-SR 37-08.09Earthwork | Morgan | May 2024 | $462k | $462k |
| Lowof 3 | WAS-SR 550-14.30Earthwork | Washington | May 2024 | $546k | $546k |
| Rank 2of 4 | NOB-SR 147-09.93Earthwork | Noble | May 2024 | $624k | $574k |
| Rank 3of 5 | HAS-US 22-05.43Earthwork | Harrison | May 2024 | $487k | $408k |
| Rank 2of 4 | BEL-SR 379-06.34Earthwork | Belmont | Apr 2024 | $568k | $508k |
| Rank 4of 4 | ATH-SR 144-06.04Earthwork | Athens | Apr 2024 | $998k | $805k |
| Lowof 4 | MAH-SR 14-09.18Earthwork | Mahoning | Apr 2024 | $474k | $474k |
| Lowof 3 | MOE-TR 1206-00.01Bridge | Monroe | Apr 2024 | $309k | $309k |
| Lowof 3 | NOB-CR 40-02.41Bridge | Noble | Apr 2024 | $1.68M | $1.68M |
| Lowof 5 | BEL-US 250-09.08Earthwork | Belmont | Mar 2024 | $274k | $274k |
| Lowof 5 | BRO-US 52-10.25Earthwork | Brown | Feb 2024 | $1.43M | $1.43M |
| Rank 4of 4 | NOB-SR 513-09.17Bridge | Noble | Feb 2024 | $1.70M | $1.38M |
| Rank 4of 7 | BRO-US 50-03.95 CulvertDrainage | Brown | Feb 2024 | $279k | $219k |
| Rank 3of 3 | NOB-SR 78-07.15 SafetySafety | Noble | Feb 2024 | $606k | $438k |
| Rank 9of 10 | TUS-Towpath Trail ImprovementsSafety | Tuscarawas | Feb 2024 | $1.07M | $717k |
| Rank 2of 6 | STA-SR 225-02.65 SlideEarthwork | Stark | Feb 2024 | $387k | $339k |
| Rank 6of 8 | NOB-SR 145/SR 147-00.38/18.41Drainage | Noble | Jan 2024 | $1.29M | $1.08M |
| Rank 2of 7 | PIK-SR 772-14.10 Slide RepairEarthwork | Pike | Jan 2024 | $889k | $847k |
| Rank 5of 6 | HOC-SR 278-05.47Drainage | Hocking | Jan 2024 | $475k | $328k |
| Rank 5of 5 | MAH-SR 11-13.30 Noise WallSafety | Mahoning | Jan 2024 | $2.19M | $1.98M |
| Rank 2of 5 | BEL-SR 147-02.84Earthwork | Belmont | Jan 2024 | $2.12M | $2.09M |
| Rank 2of 5 | BRO-US 52-22.27 Slide RepairEarthwork | Brown | Jan 2024 | $1.17M | $1.17M |
| Rank 6of 7 | HOC-SR 328-06.22Drainage | Hocking | Jan 2024 | $412k | $258k |
| Rank 6of 8 | NOB-SR 513/SR 564-07.03/00.26Drainage | Noble | Jan 2024 | $1.09M | $868k |
| Rank 2of 6 | WAS-SR 26-19.32Drainage | Washington | Dec 2023 | $787k | $682k |
| Rank 5of 6 | JEF-US 22-13.83/14.71Drainage | Jefferson | Nov 2023 | $927k | $849k |
| Rank 5of 7 | MAH-IR 76-03.03 Noise WallSafety | Mahoning | Nov 2023 | $1.42M | $1.15M |
| Lowof 7 | LAK-IR 90-05.57 SlideEarthwork | Lake | Nov 2023 | $1.09M | $1.09M |
| Rank 3of 5 | WAS-SR 339-07.32Drainage | Washington | Oct 2023 | $278k | $236k |
| Rank 2of 6 | HAS-SR 342-03.88Earthwork | Harrison | Oct 2023 | $479k | $316k |
| Rank 7of 7 | MUS-IR 70-07.36Earthwork | Muskingum | Sep 2023 | $734k | $482k |
| Rank 2of 9 | PIK-CR 50-02.55 OH18-01Earthwork | Pike | Sep 2023 | $1.39M | $1.13M |
| Rank 4of 6 | ALL-SR 115-01.11Earthwork | Allen | Sep 2023 | $798k | $600k |
| Rank 3of 4 | BEL-US 40-27.30Drainage | Belmont | Sep 2023 | $1.12M | $818k |
| Lowof 7 | MUS-SR 16-06.70Earthwork | Muskingum | Aug 2023 | $1.81M | $1.81M |
| Lowof 3 | BEL-SR 7-14.49Drainage | Belmont | Aug 2023 | $1.43M | $1.43M |
| Lowof 2 | TUS-IR 77-07.12Drainage | Tuscarawas | Aug 2023 | $1.49M | $1.49M |
| Rank 3of 5 | NOB-IR 77-11.97Drainage | Noble | Jul 2023 | $897k | $868k |
| Rank 2of 3 | JEF-SR 213-04.21Earthwork | Jefferson | Jun 2023 | $523k | $500k |
| Lowof 4 | MOE-SR 78-06.78Drainage | Monroe | Jun 2023 | $318k | $318k |
| Rank 3of 4 | ADA-SR 348-11.20Safety | Adams | May 2023 | $2.12M | $1.90M |
| Rank 2of 3 | NOB-SR 146-16.35Earthwork | Noble | May 2023 | $1.09M | $1.04M |
| Rank 2of 5 | MOE-SR 255-16.38Earthwork | Monroe | May 2023 | $541k | $529k |
| Lowof 4 | VIN-SR 356-01.34Earthwork | Vinton | May 2023 | $799k | $799k |
| Rank 2of 3 | MOE-TR 183-00.13Bridge | Monroe | May 2023 | $617k | $549k |
| Rank 3of 4 | MOE-TR 2001-00.13Bridge | Monroe | May 2023 | $669k | $489k |
| Rank 2of 4 | MOE-SR 78-08.63Maintenance | Monroe | May 2023 | $525k | $500k |
| Rank 4of 4 | JEF-SR 151-12.45Signals | Jefferson | May 2023 | $672k | $581k |
| Rank 2of 3 | WAS-SR 821-08.69Earthwork | Washington | May 2023 | $834k | $799k |
| Lowof 5 | JEF-SR 164-08.80Earthwork | Jefferson | Apr 2023 | $427k | $427k |
| Rank 2of 5 | BEL-US 250-06.45Earthwork | Belmont | Apr 2023 | $443k | $442k |
| Rank 3of 6 | BEL-US 250-07.90Earthwork | Belmont | Apr 2023 | $543k | $504k |
| Rank 2of 4 | MOE-TR 307-00.72Bridge | Monroe | Mar 2023 | $809k | $705k |
| Rank 3of 4 | WAS-SR 676-02.50Earthwork | Washington | Mar 2023 | $613k | $580k |
| Rank 4of 5 | WAS-SR 530-05.04Drainage | Washington | Mar 2023 | $367k | $292k |
| Rank 6of 7 | NOB-Appalachian Hills WLAPavement | Noble | Mar 2023 | $1.19M | $1.07M |
| Rank 9of 10 | HOC-SR 664-16.51Drainage | Hocking | Mar 2023 | $704k | $449k |
| Lowof 3 | COL-SR 39-20.81Drainage | Columbiana | Feb 2023 | $798k | $798k |
| Rank 5of 8 | NOB-SR 821-18.71Drainage | Noble | Feb 2023 | $279k | $196k |
| Rank 2of 5 | MOE-CR 29-06.93Bridge | Monroe | Feb 2023 | $665k | $617k |
| Rank 2of 9 | GUE-SR 265-05.68Earthwork | Guernsey | Feb 2023 | $144k | $124k |
| Rank 6of 6 | MUS-TR 49-00.56 (Multiuse Path)Safety | Muskingum | Jan 2023 | $878k | $637k |
| Rank 4of 5 | FAI-SR 37-27.41Earthwork | Fairfield | Jan 2023 | $926k | $569k |
| Rank 4of 4 | MRG-SR 376-01.10Earthwork | Morgan | Jan 2023 | $1.96M | $1.33M |
| Lowof 5 | ERI-SR 4-00.23Earthwork | Erie | Jan 2023 | $496k | $496k |
| Lowof 6 | BEL-SR 9-18.70Earthwork | Belmont | Jan 2023 | $269k | $269k |
| Lowof 4 | BEL-SR 800-01.57Earthwork | Belmont | Jan 2023 | $423k | $423k |
| Rank 8of 8 | HOL-SR 39/SR 754-11.17/00.16,TUS-SR 93-10.80Drainage | Holmes | Dec 2022 | $2.30M | $1.58M |
| Rank 3of 4 | HAS-SR 258-01.11Earthwork | Harrison | Dec 2022 | $428k | $387k |
| Rank 5of 6 | FRA-/FAI-US 33-31.04/00.00 Noise WallSafety | Franklin | Dec 2022 | $1.49M | $1.14M |
| Rank 5of 6 | COL-SR 14-01.42Drainage | Columbiana | Dec 2022 | $593k | $466k |
| Rank 6of 6 | MUS-SR 146/SR 340-31.42/03.26 (PART 1 AND PART 2)Earthwork | Muskingum | Dec 2022 | $993k | $683k |
| Rank 4of 7 | MOE-CR 28-00.54Bridge | Monroe | Nov 2022 | $852k | $752k |
| Rank 8of 8 | VIN-SR 93-12.16Drainage | Vinton | Nov 2022 | $1.38M | $905k |
| Rank 7of 7 | VIN-SR 160-16.05Drainage | Vinton | Oct 2022 | $938k | $621k |
| Rank 10of 10 | HIG-SR 72-02.26Drainage | Highland | Sep 2022 | $725k | $439k |
| Rank 2of 3 | HOL-SR 241-08.92Safety | Holmes | Sep 2022 | $494k | $327k |
| Rank 3of 4 | HAS-SR 646-06.33Pavement | Harrison | Sep 2022 | $816k | $684k |
| Rank 4of 5 | GAL-SR 553-00.61Earthwork | Gallia | Aug 2022 | $322k | $196k |
| Rank 7of 7 | D10-CR FY2023Drainage | D10 | Aug 2022 | $356k | $106k |
| Lowof 5 | HAS-US 22-03.59Earthwork | Harrison | Aug 2022 | $808k | $808k |
| Rank 4of 10 | MUS-IR 70-25.90Earthwork | Muskingum | Aug 2022 | $727k | $642k |
| Rank 5of 5 | JEF-SR 7-03.49Drainage | Jefferson | Aug 2022 | $297k | $256k |
| Rank 2of 4 | MEG-SR 124-62.80Earthwork | Meigs | Jul 2022 | $713k | $700k |
| Lowof 4 | MOE-SR 26-14.76Earthwork | Monroe | Jul 2022 | $517k | $517k |
| Rank 6of 9 | ROS-SR 772-10.60Earthwork | Ross | Jun 2022 | $783k | $662k |
| Rank 2of 4 | BEL-US 250-04.49Earthwork | Belmont | Jun 2022 | $361k | $353k |
| Rank 2of 3 | BEL-CR 4-23.62/25.79Earthwork | Belmont | Jun 2022 | $732k | $732k |
| Lowof 4 | BEL-SR 149-08.15 (PART 1 AND PART 2)Earthwork | Belmont | Jun 2022 | $1.08M | $1.08M |
| Rank 2of 5 | BEL-US 250-08.10Earthwork | Belmont | Jun 2022 | $296k | $272k |
| Lowof 3 | HAS-SR 519-06.38Pavement | Harrison | Jun 2022 | $509k | $509k |
| Rank 3of 4 | PAU-US 24-13.52Earthwork | Paulding | Jun 2022 | $2.54M | $2.15M |
| Lowof 5 | HAS-US 22-01.86Earthwork | Harrison | Jun 2022 | $332k | $332k |
| Rank 4of 4 | LIC-SR 310-09.88Drainage | Licking | Jun 2022 | $781k | $423k |
| Rank 4of 4 | MEG-SR 143-09.20Earthwork | Meigs | May 2022 | $1.24M | $880k |
| Lowof 1 | BEL-SR 7-09.77Maintenance | Belmont | May 2022 | $1.79M | $1.79M |
| Rank 5of 5 | BRO-US 62-10.75Earthwork | Brown | May 2022 | $898k | $527k |
| Rank 5of 6 | ADA-SR 125-01.34 Slide RepairSafety | Adams | May 2022 | $313k | $279k |
| Rank 2of 4 | BEL-SR 149-13.63Earthwork | Belmont | May 2022 | $547k | $508k |
| Rank 4of 6 | COL-SR 45-03.36Drainage | Columbiana | May 2022 | $827k | $557k |
| Rank 2of 4 | BEL-SR 26-06.92Earthwork | Belmont | May 2022 | $398k | $391k |
| Lowof 5 | JEF-SR 7-04.00 Truck Parking AreaPavement | Jefferson | May 2022 | $594k | $594k |
| Rank 3of 3 | LAW-SR 378-06.56 LandslideEarthwork | Lawrence | May 2022 | $1.55M | $1.33M |
| Rank 3of 4 | SCI-SR 335-09.38 Slide RepairEarthwork | Scioto | May 2022 | $304k | $249k |
| Rank 8of 10 | MEG-SR 681-04.78Earthwork | Meigs | May 2022 | $841k | $595k |
| Lowof 4 | GAL-SR 7-29.99Earthwork | Gallia | Apr 2022 | $644k | $644k |
| Lowof 6 | HAS-SR 151-24.96Earthwork | Harrison | Apr 2022 | $1.24M | $1.24M |
| Lowof 7 | BEL-CR 56-33.21/34.26Earthwork | Belmont | Apr 2022 | $429k | $429k |
| Rank 2of 4 | WAS-SR 7-28.97Drainage | Washington | Apr 2022 | $349k | $309k |
| Rank 4of 6 | PIK-CR 50-03.32 OH16-01Earthwork | Pike | Apr 2022 | $923k | $802k |
| Lowof 5 | BEL-SR 26-03.75/03.91Earthwork | Belmont | Mar 2022 | $374k | $374k |
| Rank 2of 4 | MRG-SR 376-01.32Earthwork | Morgan | Mar 2022 | $1.10M | $1.07M |
| Rank 3of 5 | HOL-US 62-15.03Earthwork | Holmes | Mar 2022 | $581k | $543k |
| Rank 3of 6 | ERI-SR 113-05.85 GSMEarthwork | Erie | Mar 2022 | $744k | $660k |
| Rank 5of 5 | MEG-SR 684-00.19Drainage | Meigs | Mar 2022 | $491k | $299k |
| Rank 3of 3 | BEL-SR 149-23.64Signals | Belmont | Mar 2022 | $1.25M | $1.04M |
| Rank 3of 3 | MRG-SR 376/SR 555-12.33/15.60Earthwork | Morgan | Mar 2022 | $1.69M | $1.61M |
| Rank 3of 3 | MOE-SR 26-16.85Signals | Monroe | Mar 2022 | $1.93M | $1.44M |
| Rank 5of 6 | HAS-Country Club Rd SidewalksSafety | Harrison | Feb 2022 | $293k | $223k |
| Rank 3of 5 | JEF-SR 150-04.80Earthwork | Jefferson | Feb 2022 | $452k | $443k |
| Rank 3of 5 | BRO-US 52-16.22 SlideEarthwork | Brown | Feb 2022 | $1.27M | $1.04M |
| Lowof 6 | BEL-SR 149-06.23Earthwork | Belmont | Jan 2022 | $444k | $444k |
| Lowof 3 | GAL-SR 7-02.45Drainage | Gallia | Jan 2022 | $143k | $143k |
| Lowof 5 | LAW-SR 7-01.62 Slide RepairEarthwork | Lawrence | Jan 2022 | $849k | $849k |
| Lowof 5 | LAW-SR 7-00.58 Slide RepairEarthwork | Lawrence | Jan 2022 | $990k | $990k |
| Rank 2of 3 | WAS-IR 77-00.84Drainage | Washington | Jan 2022 | $996k | $922k |
| Lowof 6 | LIC-SR 16-16.57Maintenance | Licking | Jan 2022 | $209k | $209k |
| Rank 2of 10 | ROS-SR 41-05.50 GeotechEarthwork | Ross | Jan 2022 | $459k | $435k |
| Lowof 7 | JEF-SR 7-10.37 Ramp BEarthwork | Jefferson | Dec 2021 | $194k | $194k |
| Rank 2of 3 | BEL-Great Stone ViaductBridge | Belmont | Nov 2021 | $1.83M | $1.79M |
| Rank 2of 7 | BEL-SR 800-13.15Earthwork | Belmont | Nov 2021 | $173k | $167k |
| Rank 2of 6 | BEL-SR 800-00.70Earthwork | Belmont | Nov 2021 | $261k | $206k |
| Lowof 8 | BEL-SR 147-00.07Earthwork | Belmont | Nov 2021 | $126k | $126k |
| Rank 2of 6 | BEL-SR 149-10.08Earthwork | Belmont | Nov 2021 | $1.05M | $1.04M |
| Lowof 8 | HAS-US 22-05.87Earthwork | Harrison | Nov 2021 | $484k | $484k |
| Lowof 4 | BEL-SR 147-16.14Earthwork | Belmont | Oct 2021 | $237k | $237k |
| Rank 7of 10 | GAL-SR 218-10.26Earthwork | Gallia | Oct 2021 | $604k | $580k |
| Rank 2of 10 | HOL-SR 520-11.80/12.91Earthwork | Holmes | Sep 2021 | $1.27M | $1.24M |
| Rank 2of 4 | D05-CUL FY2022Drainage | D05 | Sep 2021 | $835k | $740k |
| Rank 2of 7 | MEG-SR 681-04.95/05.51Earthwork | Meigs | Sep 2021 | $1.99M | $1.89M |
| Rank 2of 10 | GUE-US 22-14.57Earthwork | Guernsey | Sep 2021 | $428k | $383k |
| Rank 2of 6 | HOC-Tar Hollow State ParkEarthwork | Hocking | Sep 2021 | $284k | $279k |
| Rank 5of 6 | NOB-SR 146-08.01Bridge | Noble | Aug 2021 | $1.24M | $955k |
| Rank 5of 5 | COL-SR 7-17.74Earthwork | Columbiana | Aug 2021 | $303k | $242k |
| Lowof 5 | BEL-CR 16-02.18/02.46Earthwork | Belmont | Aug 2021 | $369k | $369k |
| Lowof 6 | PER-SR 669-09.11Earthwork | Perry | Aug 2021 | $68k | $68k |
| Rank 3of 8 | JEF-CR 6-05.39Earthwork | Jefferson | Aug 2021 | $224k | $210k |
| Rank 3of 4 | NOB-SR 285-03.97Earthwork | Noble | Jul 2021 | $441k | $365k |
| Rank 7of 8 | MOE-CR 12-18.00Bridge | Monroe | Jul 2021 | $410k | $329k |
| Lowof 7 | GUE-US 40-14.31Earthwork | Guernsey | Jul 2021 | $836k | $836k |
| Rank 3of 4 | NOB-SR 146-07.15Drainage | Noble | Jul 2021 | $142k | $63k |
| Rank 5of 5 | MRG-SR 60-21.20Earthwork | Morgan | Jul 2021 | $931k | $650k |
| Rank 6of 6 | MOE-Monroe Lake ODNR Slip RepairEarthwork | Monroe | Jul 2021 | $79k | $49k |
| Rank 8of 10 | WAS-SR 550-09.21Earthwork | Washington | Jul 2021 | $198k | $139k |
| Rank 2of 7 | WAS-SR 26-22.52Earthwork | Washington | Jul 2021 | $627k | $580k |
| Lowof 7 | HAS-SR 151-21.12/25.34Drainage | Harrison | May 2021 | $454k | $454k |
| Rank 2of 6 | BEL-CR 4-04.34/05.15Earthwork | Belmont | May 2021 | $747k | $729k |
| Lowof 5 | BEL-CR 46-02.48/02.79 (PART 1 AND PART 2)Earthwork | Belmont | May 2021 | $745k | $745k |
| Rank 4of 5 | NOB-SR 78-11.38Earthwork | Noble | May 2021 | $894k | $782k |
| Rank 2of 5 | BEL-US 40-11.62/11.81Drainage | Belmont | May 2021 | $340k | $326k |
| Rank 3of 7 | WAS-SR 26-25.10Earthwork | Washington | May 2021 | $333k | $272k |
| Rank 4of 5 | PIK-CR 50-03.40 OH18-01Earthwork | Pike | Apr 2021 | $1.19M | $839k |
| Rank 2of 6 | JEF-CR 53-07.45Earthwork | Jefferson | Apr 2021 | $660k | $535k |
| Lowof 6 | BEL-US 250-07.65Earthwork | Belmont | Mar 2021 | $249k | $249k |
| Rank 3of 7 | GAL-US 35-13.07Earthwork | Gallia | Mar 2021 | $454k | $408k |
| Rank 2of 7 | MOE-SR 260-01.48Earthwork | Monroe | Mar 2021 | $743k | $637k |
| Lowof 8 | BEL-CR 214-06.58Earthwork | Belmont | Mar 2021 | $149k | $149k |
| Rank 4of 6 | MOE-CR 29-00.85Bridge | Monroe | Feb 2021 | $978k | $809k |
| Lowof 4 | BEL-SR 147-04.45Signals | Belmont | Feb 2021 | $186k | $186k |
| Rank 2of 10 | MOE-WNF Drainage Improvement Ph1Drainage | Monroe | Feb 2021 | $382k | $350k |
| Rank 7of 10 | HOL-US 62/VAR-05.06/VARDrainage | Holmes | Jan 2021 | $498k | $356k |
| Lowof 7 | TUS-SR 800-27.11Earthwork | Tuscarawas | Jan 2021 | $203k | $203k |
| Rank 7of 9 | LIC-US 40-14.90Drainage | Licking | Jan 2021 | $569k | $444k |
| Rank 5of 5 | JEF-SR 150A/SR 7 Park & RidePavement | Jefferson | Jan 2021 | $391k | $282k |
| Lowof 7 | WAS-SR 555-19.29Bridge | Washington | Dec 2020 | $1.03M | $1.03M |
| Lowof 10 | BEL-SR 9-00.01Earthwork | Belmont | Dec 2020 | $964k | $964k |
| Rank 5of 10 | HAS-SR 342-01.79Earthwork | Harrison | Dec 2020 | $97k | $83k |
| Lowof 8 | MOE-CR 81-01.50Earthwork | Monroe | Nov 2020 | $279k | $279k |
| Lowof 6 | HAS-SR 646-01.21Earthwork | Harrison | Nov 2020 | $148k | $148k |
| Rank 2of 8 | COL-CR 427A-00.09Earthwork | Columbiana | Oct 2020 | $442k | $412k |
| Rank 2of 9 | TUS-SR 800-26.67Earthwork | Tuscarawas | Oct 2020 | $444k | $403k |
| Lowof 5 | BEL-CR 214-06.87Earthwork | Belmont | Oct 2020 | $169k | $169k |
| Rank 2of 10 | NOB-SR 146-13.17Drainage | Noble | Sep 2020 | $304k | $279k |
| Rank 2of 9 | BRO-SR 41-04.18Earthwork | Brown | Sep 2020 | $319k | $317k |
| Rank 3of 5 | GAL-SR 588-11.00Earthwork | Gallia | Sep 2020 | $350k | $326k |
| Rank 2of 7 | BEL-SR 148-09.36Earthwork | Belmont | Sep 2020 | $114k | $97k |
| Lowof 7 | WAS-SR 821-13.28Earthwork | Washington | Sep 2020 | $1.25M | $1.25M |
| Rank 5of 8 | MUS-SR 146-24.60Bridge | Muskingum | Aug 2020 | $374k | $298k |
| Rank 10of 10 | LAW-CR 169-00.41Drainage | Lawrence | Aug 2020 | $437k | $308k |
| Rank 2of 8 | BEL-SR 149-12.71Earthwork | Belmont | Jul 2020 | $740k | $688k |
| Rank 4of 9 | JEF-SR 164-09.40Earthwork | Jefferson | Jul 2020 | $267k | $209k |
| Lowof 7 | BEL-SR 647-02.27Earthwork | Belmont | Jul 2020 | $130k | $130k |
| Rank 7of 8 | MEG-SR 124-63.33Earthwork | Meigs | Jul 2020 | $403k | $262k |
| Rank 5of 8 | VIN-SR 93-06.67Earthwork | Vinton | Jul 2020 | $349k | $254k |
| Lowof 6 | BEL-SR 147-27.44Earthwork | Belmont | Jul 2020 | $293k | $293k |
| Lowof 6 | WAS-SR 60-08.60Earthwork | Washington | Jul 2020 | $3.85M | $3.85M |
| Rank 6of 8 | MRG-SR 60-13.31Earthwork | Morgan | Jun 2020 | $2.00M | $1.32M |
| Rank 2of 5 | MRG-SR 376-12.87Earthwork | Morgan | Jun 2020 | $1.38M | $1.17M |
| Lowof 7 | ATH-SR 144-01.99Earthwork | Athens | Jun 2020 | $398k | $398k |
| Rank 2of 8 | BEL-SR 9-11.72Earthwork | Belmont | Jun 2020 | $411k | $395k |
| Rank 3of 5 | JEF-SR 213-18.43Bridge | Jefferson | Jun 2020 | $765k | $634k |
| Rank 3of 7 | LIC-SR 16-23.68Maintenance | Licking | Jun 2020 | $94k | $74k |
| Rank 2of 5 | MEG-US 33-08.66 RBridge | Meigs | Jun 2020 | $113k | $85k |
| Rank 3of 6 | GAL-SR 218-07.87 & VarDrainage | Gallia | Jun 2020 | $649k | $481k |
| Rank 3of 9 | JAC-SR 139-12.45Drainage | Jackson | Jun 2020 | $478k | $449k |
| Rank 3of 6 | BEL-SR 647-02.70Earthwork | Belmont | May 2020 | $328k | $272k |
| Lowof 6 | BEL-SR 9-22.81Earthwork | Belmont | May 2020 | $274k | $274k |
| Rank 3of 7 | BEL-SR 147-10.40, BEL-SR 149-22.91Drainage | Belmont | May 2020 | $224k | $208k |
| Rank 5of 7 | HAS-SR 258-01.18Earthwork | Harrison | May 2020 | $302k | $241k |
| Rank 5of 5 | MRG-SR 60-21.42Earthwork | Morgan | Apr 2020 | $744k | $528k |
| Rank 2of 3 | D05-CUL FY2020Drainage | D05 | Apr 2020 | $1.10M | $976k |
| Rank 2of 5 | BEL-BARKCAMP ODNR BRIDGESBridge | Belmont | Apr 2020 | $275k | $253k |
| Rank 3of 4 | WAS-SR 821-05.20Maintenance | Washington | Apr 2020 | $953k | $719k |
| Rank 5of 6 | LIC-SR 13-07.82Maintenance | Licking | Apr 2020 | $793k | $591k |
| Rank 5of 5 | D10-Culverts FY2020BDrainage | D10 | Apr 2020 | $368k | $222k |
| Lowof 7 | COL-SR 267-00.59Earthwork | Columbiana | Apr 2020 | $368k | $368k |
| Rank 4of 4 | BEL-US 250-08.16Earthwork | Belmont | Apr 2020 | $277k | $203k |
| Rank 5of 6 | BEL-SR 9-16.18/16.74Drainage | Belmont | Apr 2020 | $680k | $497k |
| Rank 4of 5 | WAS-SR 555-05.62Earthwork | Washington | Apr 2020 | $592k | $497k |
| Rank 4of 7 | JEF-TR 62-02.87 -ODNR Brush CreekEarthwork | Jefferson | Apr 2020 | $189k | $149k |
| Rank 8of 8 | D10-Culverts FY2020ADrainage | D10 | Mar 2020 | $268k | $145k |
| Lowof 6 | BEL-SR 647-01.40Earthwork | Belmont | Mar 2020 | $231k | $231k |
| Rank 5of 8 | CAR-SR 212-05.84Drainage | Carroll | Mar 2020 | $283k | $217k |
| Rank 4of 4 | MRG-SR 60-01.95Earthwork | Morgan | Mar 2020 | $658k | $537k |
| Lowof 5 | BEL-SR 26-00.35 & VAR.Earthwork | Belmont | Mar 2020 | $733k | $733k |
| Lowof 5 | PIC-SR 674-10.19/10.35Earthwork | Pickaway | Mar 2020 | $397k | $397k |
| Rank 2of 4 | ATH-SR 56-10.08Earthwork | Athens | Mar 2020 | $469k | $433k |
| Lowof 6 | MOE-SR 255-17.60Earthwork | Monroe | Feb 2020 | $317k | $317k |
| Rank 2of 6 | BEL-SR 9-09.20Earthwork | Belmont | Feb 2020 | $213k | $205k |
| Rank 4of 9 | NOB-SR 340 4.100Earthwork | Noble | Feb 2020 | $373k | $319k |
| Lowof 5 | MOE-CR 81-01.55Earthwork | Monroe | Dec 2018 | $243k | $243k |
| Lowof 4 | MOE-SR 26-09.56Earthwork | Monroe | Nov 2018 | $271k | $271k |
| Lowof 3 | WAS-SR 260-09.00Earthwork | Washington | Nov 2018 | $429k | $429k |
| Rank 9of 10 | GUE-Salt Fork Culverts FY 2019Drainage | Guernsey | Nov 2018 | $291k | $173k |
| Rank 3of 5 | WAS-SR 550-14.30Earthwork | Washington | Nov 2018 | $314k | $305k |
| Rank 2of 3 | MOE-SR 26-22.01Earthwork | Monroe | Nov 2018 | $1.17M | $1.01M |
| Rank 2of 3 | MOE-SR 536-02.84Earthwork | Monroe | Nov 2018 | $634k | $548k |
| Rank 4of 4 | WAS-SR 26-07.63Earthwork | Washington | Nov 2018 | $943k | $778k |
| Rank 2of 5 | NOB-SR 313-00.67Earthwork | Noble | Oct 2018 | $205k | $160k |
| Lowof 3 | MOE-SR 536-01.97Earthwork | Monroe | Oct 2018 | $375k | $375k |
| Rank 7of 8 | TUS-SR 800-25.65Earthwork | Tuscarawas | Oct 2018 | $324k | $209k |
| Rank 4of 4 | WAS-SR 26-25.90Earthwork | Washington | Oct 2018 | $748k | $578k |
| Lowof 4 | MOE-CR 81-02.07Earthwork | Monroe | Oct 2018 | $211k | $211k |
| Rank 5of 5 | WAS-SR 145-01.51Earthwork | Washington | Oct 2018 | $479k | $383k |
| Rank 2of 5 | NOB-SR 78-02.10Earthwork | Noble | Oct 2018 | $444k | $443k |
| Rank 2of 4 | BEL-SR 147-31.86Earthwork | Belmont | Oct 2018 | $242k | $230k |
| Lowof 7 | BEL-SR 9-00.21Earthwork | Belmont | Sep 2018 | $635k | $635k |
| Lowof 3 | MOE-Monroe Lake ODNRPavement | Monroe | Sep 2018 | $195k | $195k |
| Lowof 7 | MOE-SR 556-04.15Earthwork | Monroe | Sep 2018 | $533k | $533k |
| Lowof 7 | BEL-US 250-07.40Earthwork | Belmont | Aug 2018 | $474k | $474k |
| Rank 2of 3 | MRG-SR 78-13.90Earthwork | Morgan | Aug 2018 | $353k | $266k |
| Rank 2of 5 | BEL-US 250-09.18Earthwork | Belmont | Aug 2018 | $169k | $168k |
| Rank 2of 5 | MRG-SR 60-03.90Earthwork | Morgan | Aug 2018 | $474k | $437k |
| Lowof 4 | MOE-SR 536-02.26Earthwork | Monroe | Aug 2018 | $409k | $409k |
| Lowof 2 | MOE-SR 537-02.10Earthwork | Monroe | Aug 2018 | $449k | $449k |
| Rank 9of 9 | HAS-SR 9-21.27Drainage | Harrison | Aug 2018 | $393k | $232k |
| Rank 6of 6 | NOB-CR 15-00.04Bridge | Noble | Aug 2018 | $527k | $419k |
| Rank 2of 7 | HAS-TR 185-00.80Earthwork | Harrison | Jul 2018 | $279k | $255k |
| Rank 3of 5 | BEL-SR 647-03.38Earthwork | Belmont | Jul 2018 | $137k | $68k |
| Rank 2of 5 | BEL-SR 147-25.48Earthwork | Belmont | Jul 2018 | $144k | $128k |
| Lowof 4 | MOE-SR 26-12.32Earthwork | Monroe | Jul 2018 | $422k | $422k |
| Lowof 4 | BEL-SR 7-11.00 & VARIOUSEarthwork | Belmont | Jul 2018 | $71k | $71k |
| Rank 2of 4 | MOE-SR 536-07.48Earthwork | Monroe | Jul 2018 | $668k | $665k |
| Rank 3of 3 | BEL-SR 149-05.32Earthwork | Belmont | Jul 2018 | $282k | $253k |