LAW-US 52-21.52
LAW County · est $1.6M
Bid dateThursday, March 26—
Awarded toSHELLY COMPANY$2.11M
LAW County · est $1.6M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 4,521 CY | $60 | $271k | 13% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 858 CY | $260 | $223k | 11% |
| 203E35120 GRANULAR MATERIAL, TYPE C (12") | 1,846 CY | $84 | $155k | 7% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $131,500 | $132k | 6% |
| 202E23000 PAVEMENT REMOVED | 3,390 SY | $32.5 | $110k | 5% |
| 442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 275 CY | $345 | $95k | 4% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 235 CY | $355 | $83k | 4% |
| 204E13000 EXCAVATION OF SUBGRADE (12") | 1,846 CY | $43 | $79k | 4% |
| 304E20000 AGGREGATE BASE | 886 CY | $82.25 | $73k | 3% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $216,500.00 2 $231,000.00 | 1 LS | $50,000 | $50k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 102 more items below.
| Item | Quantity | R1Shelly Company | R2Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 4,521 CY | $60.00 | $55.00 | 17% |
| 301E56000 ASPHALT CONCRETE BASE, PG64-22, (449) | 858 CY | $260 | $370 | 14% |
| 203E35120 GRANULAR MATERIAL, TYPE C (12") | 1,846 CY | $84.00 | $128 | 10% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $131,500 | $75,000 | 8% |
| 202E23000 PAVEMENT REMOVED | 3,390 SY | $32.50 | $18.00 | 7% |
| 442E20170 ASPHALT CONCRETE INTERMEDIATE COURSE, 12.5 MM, TYP | 275 CY | $345 | $444 | 6% |
| 442E20000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 235 CY | $355 | $414 | 5% |
| 204E13000 EXCAVATION OF SUBGRADE (12") | 1,846 CY | $43.00 | $55.00 | 5% |
| 304E20000 AGGREGATE BASE | 886 CY | $82.25 | $155 | 5% |
| 624E10000 MOBILIZATION Section 8 - INCIDENTALS - Totals Awd $216,500.00 2 $231,000.00 | 1 LS | $50,000 | $100,000 | 3% |
| 203E10000 EXCAVATION | 1,033 CY | $44.00 | $75.00 | 3% |
| 632E87150 COMBINATION STRAIN POLE, TYPE TC-81.11, DESIGN 13 | 2 EACH | $19,000 | $19,000 | 2% |
| 611E99574 MANHOLE, NO. 3 | 4 EACH | $9,050 | $7,500 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $35,000 | $15,000 | 2% |
| 832E30000 EROSION CONTROL | 35,000 EACH | $1.00 | $1.00 | 2% |
| 611E07600 18" CONDUIT, TYPE C | 235 FT | $144 | $125 | 2% |
| 622E41101 PORTABLE BARRIER, UNANCHORED, AS PER PLAN Section 7 - MAINTENANCE OF TRAFFIC - Totals Awd $83,119.44 2 $116,116.00 | 935 FT | $29.25 | $48.00 | 2% |
| 605E11100 6" SHALLOW PIPE UNDERDRAINS | 1,722 FT | $14.75 | $28.00 | 2% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 975 FT | $25.20 | $30.00 | 2% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $12,000 | $12,000 | 2% |
| Item | Quantity | R1Shelly Company | R2Axis Civil Construction LLC |
|---|---|---|---|
| 202E35100 PIPE REMOVED, 24" DIAMETER AND UNDER | 804 FT | $18.25 | $38.00 |
| 202E35200 PIPE REMOVED, OVER 24" DIAMETER | 38 FT | $38.35 | $42.00 |
| 202E38000 GUARDRAIL REMOVED | 1,189 FT | $2.00 | $10.00 |
| 202E42010 ANCHOR ASSEMBLY REMOVED, TYPE E | 1 EACH | $182 | $900 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 5 EACH | $95.00 | $900 |
| 202E52990 SPECIAL - PARKING BLOCK REMOVED | 6 EACH | $54.00 | $100 |
| 202E58100 CATCH BASIN REMOVED | 3 EACH | $730 | $2,000 |
| 202E75000 FENCE REMOVED | 288 FT | $3.00 | $6.00 |
| 202E98100 REMOVAL MISC.: PRIVATE SIGN | 2 EACH | $160 | $2,000 |
| 204E10000 SUBGRADE COMPACTION | 5,537 SY | $1.50 | $4.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $260 | $300 |
| 204E50000 GEOTEXTILE FABRIC | 5,537 SY | $1.25 | $2.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 100 FT | $21.60 | $27.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,640 | $1,850 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E, MASH 2016 | 1 EACH | $2,860 | $2,800 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $1,380 | $1,500 |
| 607E15000 FENCE, TYPE 47 | 366 FT | $28.50 | $28.00 |
| 623E40520 RIGHT-OF-WAY MONUMENT, TYPE B | 1 EACH | $465 | $500 |
| 623E50000 PRECONSTRUCTION SURVEY MONUMENT VERIFICATION AND R | 1 LS | $1,900 | $1,600 |
| 623E51000 POST CONSTRUCTION SURVEY MONUMENT VERIFICATION AND Section 1 - ROADWAY - Totals Awd $783,885.05 2 $889,404.00 | 1 LS | $1,900 | $1,600 |
| 601E11000 RIPRAP, TYPE D | 9 SY | $570 | $450 |
| 601E21050 TIED CONCRETE BLOCK MAT WITH TYPE 1 UNDERLAYMENT | 64 SY | $95.00 | $110 |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 25 CY | $135 | $145 |
| 659E00300 TOPSOIL | 213 CY | $110 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 567 SY | $2.00 | $6.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 29 SY | $2.20 | $6.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $1,400 | $1,250 |
| 659E31000 LIME | 0.12 ACRE | $450 | $150 |
| 659E35000 WATER | 4 MGAL | $1.00 | $1.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,343 SY | $2.00 | $2.00 |
| 670E00720 DITCH EROSION PROTECTION MAT, TYPE B | 222 SY | $2.00 | $3.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,950 | $2,000 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,900 | $6,750 |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $8,225 | $9,000 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING Section 2 - EROSION CONTROL - Totals Awd $90,736.15 2 $89,941.00 | 43 SY | $3.45 | $12.00 |
| 602E20000 CONCRETE MASONRY | 4.3 CY | $2,045 | $3,800 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 929 FT | $18.00 | $28.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 306 FT | $32.00 | $45.00 |
| 611E04400 12" CONDUIT, TYPE B | 70 FT | $159 | $120 |
| 611E04600 12" CONDUIT, TYPE C | 67 FT | $128 | $120 |
| 611E05900 15" CONDUIT, TYPE B, 706.02 | 6 FT | $385 | $350 |
| 611E06100 15" CONDUIT, TYPE C, 706.02 | 26 FT | $286 | $225 |
| 611E16400 36" CONDUIT, TYPE B, 706.02 | 14 FT | $286 | $490 |
| 611E16600 36" CONDUIT, TYPE C, 706.02 | 24 FT | $325 | $490 |
| 611E28000 84" CONDUIT, TYPE A, 707.02 (0.218), 707.02 (ALUMI | 11 FT | $1,010 | $1,500 |
| 611E96550 FIELD PAVING OF EXISTING PIPE TYPE A, 84" | 11 FT | $700 | $700 |
| 611E98150 CATCH BASIN, NO. 3 | 2 EACH | $9,175 | $9,000 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $3,015 | $5,000 |
| 611E98540 CATCH BASIN, NO. 2-4 | 1 EACH | $5,450 | $7,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET Section 3 - DRAINAGE - Totals Awd $217,960.50 2 $261,623.00 | 1 EACH | $450 | $700 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.25") | 601 SY | $25.50 | $25.00 |
| 304E20000 AGGREGATE BASE, 8" | 46 CY | $102 | $170 |
| 407E10000 TACK COAT, (0.055 GAL/SY) | 12 GAL | $2.50 | $2.50 |
| 407E20000 NON-TRACKING TACK COAT | 639 GAL | $4.10 | $4.10 |
| 441E70500 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449) | — | $440 | $445 |
| 441E70700 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 449 (11 CY | $360 | $414 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC 1P | 75 SY | $152 | $270 |
| 609E26000 CURB, TYPE 6 | 87 FT | $84.00 | $70.00 |
| 609E30000 CURB, TYPE 8 Section 4 - PAVEMENT - Totals Awd $528,696.40 2 $737,728.90 | 45 FT | $125 | $80.00 |
| 621E00100 RPM | 37 EACH | $42.00 | $135 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 76 FT | $18.00 | $15.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 126 FT | $20.50 | $18.50 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 42 FT | $25.50 | $22.00 |
| 630E80100 SIGN, FLAT SHEET | 78.5 SF | $28.00 | $28.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 14 EACH | $15.00 | $30.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 2 EACH | $70.00 | $150 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 17 EACH | $20.00 | $30.00 |
| 644E00104 EDGE LINE, 6" | 1.06 MILE | $3,500 | $3,500 |
| 644E00204 LANE LINE, 6" | 0.38 MILE | $2,100 | $2,100 |
| 644E00300 CENTER LINE | 0.19 MILE | $6,000 | $6,000 |
| 644E00404 CHANNELIZING LINE, 12" | 995 FT | $2.80 | $2.80 |
| 644E00500 STOP LINE | 140 FT | $10.00 | $10.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 130 FT | $8.00 | $8.00 |
| 644E01300 LANE ARROW Section 5 - TRAFFIC CONTROL - Totals Awd $21,988.00 2 $25,342.00 | 15 EACH | $110 | $110 |
| 625E18510 BRACKET ARM, 30' | 2 EACH | $3,500 | $3,500 |
| 625E23304 NO. 8 AWG 600 VOLT DISTRIBUTION CABLE | 686 FT | $5.00 | $5.00 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 573 FT | $2.75 | $2.75 |
| 625E26252 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), TYPE I | 2 EACH | $500 | $500 |
| 625E32000 GROUND ROD | 2 EACH | $400 | $400 |
| 632E30600 TETHER WIRE, WITH ACCESSORIES | 439 FT | $30.00 | $30.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 686 FT | $5.00 | $5.00 |
| 632E64950 TEST HOLE PERFORMED | 1 EACH | $3,600 | $3,600 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $20,000 | $20,000 |
| 632E90200 REUSE OF VEHICULAR SIGNAL HEAD | 1 EACH | $600 | $600 |
| 632E90300 SIGNALIZATION, MISC.: PARTIAL SPAN WIRE INSTALLATI | 1 LS | $20,000 | $20,000 |
| 632E90300 SIGNALIZATION, MISC.: UNLASH AND RELASH MESSENGER | 1 LS | $1,000 | $1,000 |
| 809E69001 ADVANCE RADAR DETECTION, AS PER PLAN | 1 EACH | $10,500 | $10,500 |
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN Section 6 - TRAFFIC SIGNALS - Totals Awd $168,105.75 2 $168,105.75 | 2 EACH | $10,000 | $10,000 |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 1 EACH | $2,035 | $7,500 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $80.00 | $65.00 |
| 614E12420 DETOUR SIGNING | 1 LS | $14,250 | $14,250 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 35 CY | $385 | $400 |
| 614E18000 MAINTAINING TRAFFIC, MISC.: BUSINESS ENTRANCE SIGN | 3 EACH | $125 | $125 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 10 SNMT | $1,700 | $1,600 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.07 MILE | $2,500 | $15,250 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", WHITE | 0.62 MILE | $2,500 | $8,875 |
| 614E22010 WORK ZONE EDGE LINE, CLASS I, 6", YELLOW | 0.49 MILE | $2,500 | $8,875 |
| 614E23000 WORK ZONE CHANNELIZING LINE, CLASS I, 8" | 2,485 FT | $1.00 | $2.25 |
| 616E10000 WATER | 1 MGAL | $1.00 | $1.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $20,000 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $2,000 | $4,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $19,500 | $20,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →