Slide Repair
Monroe County · plans pulled by 3 GCs
Monroe County · plans pulled by 3 GCs
2 primes + 1 sub pulled plans · Alan Stone CO INC wins 38% of OH earthwork bids it enters
If your number lands…historical win odds, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and won (n=9,164 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans2 primes · 1 sub
Likely also biddingOH earthwork regulars · 6
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH earthwork work in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
41 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 201E11000 | CLEARING AND GRUBBING | Lump sum |
| 203E10000 | EXCAVATION | 24,206 CY |
| 203E20000 | EMBANKMENT | 40 CY |
| 208E10000 | PRE-BLAST CONDITION SURVEY | Lump sum |
| 208E12000 | BLASTING CONSULTANT | Lump sum |
| 208E13000 | AIR BLAST AND NOISE CONTROL | Lump sum |
| 208E14000 | VIBRATION CONTROL AND MONITORING | Lump sum |
| 208E15000 | PRESPLITTING | 874 SY |
| 208E16000 | HYDROLOGIST | Lump sum |
| 254E01000 | PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 500 SY |
| 601E32300 | ROCK CHANNEL PROTECTION, TYPE D WITH FILTER | 125 CY |
| 659E00541 | SEEDING AND MULCHING, CLASS 3C, AS PER PLAN | 5,342 SY |
| 659E10000 | SEEDING AND MULCHING | 1,002 SY |
| 659E20000 | COMMERCIAL FERTILIZER | 0.86 TON |
| 659E31000 | LIME | 1.31 ACRE |
| 659E35000 | WATER | 17.1 MGAL |
| 832E15000 | STORM WATER POLLUTION PREVENTION PLAN | Lump sum |
| 832E15002 | STORM WATER POLLUTION PREVENTION INSPECTIONS | Lump sum |
| 832E15010 | STORM WATER POLLUTION PREVENTION INSPECTION SOFTWARE | Lump sum |
| 832E30000 | EROSION CONTROL | 8,000 EACH |
| 614E12384 | WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS, (BIDIRECTIONAL) | 2 EACH |
| 614E12740 | WORK ZONE LIGHTING SYSTEM | 1 EACH |
| 614E13310 | BARRIER REFLECTOR, TYPE 1, (BIDIRECTIONAL) | 13 EACH |
| 614E13360 | OBJECT MARKER, TWO WAY | 13 EACH |
| 614E18600 | PORTABLE CHANGEABLE MESSAGE SIGN | 4 SNMT |
| 614E22010 | WORK ZONE EDGE LINE, CLASS I, 6" | 0.15 MILE |
| 614E26000 | WORK ZONE STOP LINE, CLASS I | 24 FT |
| 622E41100 | PORTABLE BARRIER, UNANCHORED | 610 FT |
| 621E00100 | RPM | 21 EACH |
| 621E54000 | RAISED PAVEMENT MARKER REMOVED | 21 EACH |
| 630E85100 | REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH |
| 642E00104 | EDGE LINE, 6", TYPE 1 | 0.31 MILE |
| 642E00300 | CENTER LINE, TYPE 1 | 0.16 MILE |
| 407E20000 | NON-TRACKING TACK COAT | 194 GAL |
| 408E10000 | PRIME COAT | 147 GAL |
| 441E50000 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG64-22 | 109 CY |
| 617E10100 | COMPACTED AGGREGATE | 31 CY |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 623E10000 | CONSTRUCTION LAYOUT STAKES AND SURVEYING | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |