Parking Areas
Wyandot County · plans pulled by 1 GCs
Wyandot County · plans pulled by 1 GCs
1 sub pulled plans · Shelly & Sands INC wins 52% of OH pavement bids it enters
If your number lands…historical win odds, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and won (n=9,164 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans1 sub
Likely also biddingOH pavement regulars · 8
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH pavement work in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
21 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 659E00100 | SOIL ANALYSIS TEST | 2 EACH |
| 659E00300 | TOPSOIL | 489 CY |
| 659E10000 | SEEDING AND MULCHING | 4,392 SY |
| 659E14000 | REPAIR SEEDING AND MULCHING | 220 SY |
| 659E15000 | INTER-SEEDING | 220 SY |
| 659E20000 | COMMERCIAL FERTILIZER | 0.59 TON |
| 659E31000 | LIME | 0.91 ACRE |
| 659E35000 | WATER | 13 MGAL |
| 832E30001 | EROSION CONTROL, AS PER PLAN | 20,000 EACH |
| 252E01500 | FULL DEPTH PAVEMENT SAWING | 200 FT |
| 304E20000 | AGGREGATE BASE | 613 CY |
| 407E10000 | TACK COAT | 183 GAL |
| 441E70000 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG64-22 | 154 CY |
| 441E70300 | ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2, (449) | 256 CY |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 623E10000 | CONSTRUCTION LAYOUT STAKES AND SURVEYING | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |
| 203E10001 | EXCAVATION, AS PER PLAN | 2,228 CY |
| 203E20000 | EMBANKMENT | 714 CY |
| 204E10000 | SUBGRADE COMPACTION | 3,674 SY |