LAW-SR 775-05.77
LAW County · est $0.6M
Bid dateThursday, February 19—
Awarded toALLARD EXCAVATION LLC$564,007.25
LAW County · est $0.6M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W21X83 STEEL BEAM, FURNISHED, | 2,170 FT | $75 | $163k | 29% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 1,253 FT | $89 | $112k | 20% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILES, 30" DIAMETER, U Section 5 - RETAINING WALLS (LAW-775-5.77) - Totals Awd $481,250.02 2 $423,103.00 3 $593,225.00 | 999 FT | $86 | $86k | 15% |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 650 FT | $93 | $60k | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,500 | $25k | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 150 SY | $102 | $15k | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $59,560.00 2 $51,919.50 3 $65,985.00 | 370 FT | $38 | $14k | 2% |
| 624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $102,600.00 2 $54,950.00 3 $89,100.00 | 1 LS | $12,750 | $13k | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,210 | $9k | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $176 | $9k | 2% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 14 more items below.
| Item | Quantity | R1Allard Excavation LLC | R2Alan Stone CO INC | R3Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: W21X83 STEEL BEAM, FURNISHED, | 2,170 FT | $75.00 | $90.00 | $85.00 | 29% |
| 524E94603 DRILLED SHAFTS, 30" DIAMETER, ABOVE BEDROCK, AS PE | 1,253 FT | $89.00 | $95.00 | $135 | 20% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILES, 30" DIAMETER, U Section 5 - RETAINING WALLS (LAW-775-5.77) - Totals Awd $481,250.02 2 $423,103.00 3 $593,225.00 | 999 FT | $86.00 | $85.00 | $130 | 15% |
| 524E94605 DRILLED SHAFTS, 30" DIAMETER INTO BEDROCK, AS PER | 650 FT | $93.00 | $120 | $155 | 11% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $24,500 | $60,000 | $20,000 | 4% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 150 SY | $102 | $85.00 | $120 | 3% |
| 622E41100 PORTABLE BARRIER, UNANCHORED Section 4 - MAINTENANCE OF TRAFFIC - Totals Awd $59,560.00 2 $51,919.50 3 $65,985.00 | 370 FT | $38.00 | $30.00 | $40.00 | 3% |
| 624E10000 MOBILIZATION Section 6 - INCIDENTALS - Totals Awd $102,600.00 2 $54,950.00 3 $89,100.00 | 1 LS | $12,750 | $21,000 | $40,000 | 2% |
| 614E12384 WORK ZONE IMPACT ATTENUATOR, 24" WIDE HAZARDS | — | $2,210 | $2,900 | $2,500 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 50 CY | $176 | $350 | $300 | 2% |
| 304E20000 AGGREGATE BASE Section 3 - PAVEMENT - Totals Awd $6,860.00 2 $7,987.00 3 $7,840.00 | 49 CY | $163 | $140 | $160 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $7,000 | $7,500 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,800 | $11,000 | $15,000 | 1% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $1,800 | $1,200 | $2,200 | 1% |
| 203E20000 EMBANKMENT | 325 CY | $16.00 | $20.00 | $30.00 | 1% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $8,196.90 2 $5,748.75 3 $7,230.50 | 5,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 150 FT | $33.00 | $50.00 | $28.48 | 1% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T Section 1 - ROADWAY - Totals Awd $54,580.00 2 $20,299.00 3 $33,742.00 | 4 EACH | $1,229 | $1,800 | $1,050 | 1% |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.27 MILE | $10,650 | $13,000 | $22,000 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,763 | $28,000 | $10,000 | 0% |
| Item | Quantity | R1Allard Excavation LLC | R2Alan Stone CO INC | R3Axis Civil Construction LLC |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 104 CY | $17.00 | $20.00 | $30.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $702 | $3,300 | $2,400 |
| 659E10000 SEEDING AND MULCHING | 343 SY | $2.00 | $8.00 | $6.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 35 SY | $0.05 | $10.00 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.05 TON | $500 | $680 | $700 |
| 659E31000 LIME | 0.07 ACRE | $500 | $970 | $450 |
| 659E35000 WATER | 1 MGAL | $1.00 | $1.00 | $1.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $85.00 | $110 | $75.00 |
| 614E11630 INCREASED BARRIER DELINEATION | 50 FT | $2.00 | $2.50 | $10.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 9 EACH | $10.00 | $40.00 | $9.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $12.00 | $40.00 | $9.00 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 27 FT | $12.00 | $15.00 | $12.00 |
| 616E10000 WATER | 50 MGAL | $1.00 | $1.00 | $1.00 |
| 202E11005 STRUCTURE REMOVED, AS PER PLAN | 6 EACH | $412 | $667 | $1,500 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →