Culvert Replacement
Clinton County · plans pulled by 2 GCs
Clinton County · plans pulled by 2 GCs
2 subs pulled plans · BCC Ohio INC wins 56% of OH drainage bids it enters
If your number lands…historical win odds, OH
Share of OH bids over the last 5 years that landed there vs the official estimate and won (n=9,164 bids) — historical frequency, not a forecast. ODOT's estimate stays sealed until bids open.
Pulled plans2 subs
Likely also biddingOH drainage regulars · 8
Confirmed = pulled plans on this letting (revealed interest, from the agency portal). Likely = firms that bid OH drainage work in the last 3 years, ranked by where and how recently they bid it — firms most active in this project’s county and ODOT district rank first. Win rate is historical — the share of bids that firm entered and won, not a prediction of this letting.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
Bid form · ODOT
37 advertised pay items from the ODOT bid form. Open a category to see its items — unit prices appear here once bids open.
| 202E23000 | PAVEMENT REMOVED | 79 SY |
| 202E35200 | PIPE REMOVED, OVER 24" DIAMETER | 100 FT |
| 203E10000 | EXCAVATION | 339 CY |
| 203E20000 | EMBANKMENT | 763 CY |
| 204E10000 | SUBGRADE COMPACTION | 87 SY |
| 503E11101 | COFFERDAMS AND EXCAVATION BRACING, AS PER PLAN | Lump sum |
| 606E15050 | GUARDRAIL, TYPE MGS | 525 FT |
| 606E26150 | ANCHOR ASSEMBLY, MGS TYPE E | 4 EACH |
| 623E40520 | RIGHT-OF-WAY MONUMENT, TYPE B | 4 EACH |
| 878E25000 | INSPECTION AND COMPACTION TESTING OF UNBOUND MATERIALS | Lump sum |
| 601E32100 | ROCK CHANNEL PROTECTION, TYPE B WITH FILTER | 14.9 CY |
| 659E00300 | TOPSOIL | 462 CY |
| 659E10000 | SEEDING AND MULCHING | 4,162 SY |
| 659E20000 | COMMERCIAL FERTILIZER | 0.56 TON |
| 659E31000 | LIME | 0.86 ACRE |
| 659E35000 | WATER | 22.5 MGAL |
| 832E30000 | EROSION CONTROL | 5,000 EACH |
| 254E01000 | PAVEMENT PLANING, ASPHALT CONCRETE 3" | 117 SY |
| 301E56000 | ASPHALT CONCRETE BASE, PG64-22, (449) | 21 CY |
| 304E20000 | AGGREGATE BASE | 15 CY |
| 407E10000 | TACK COAT | 23 GAL |
| 441E70000 | ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG64-22 | 16 CY |
| 621E00100 | RPM | 2 EACH |
| 621E54000 | RAISED PAVEMENT MARKER REMOVED | 2 EACH |
| 626E00110 | BARRIER REFLECTOR, TYPE 2 BI-DIRECTIONAL | 14 EACH |
| 642E00104 | EDGE LINE, 6", TYPE 1 | 0.02 MILE |
| 642E00300 | CENTER LINE, TYPE 1 | 0.01 MILE |
| 602E20000 | CONCRETE MASONRY | 3.94 CY |
| 611E04400 | 12" CONDUIT, TYPE B | 200 FT |
| 611E05900 | 15" CONDUIT, TYPE B | 200 FT |
| 611E53400 | 58" X 91" CONDUIT, TYPE A, 706.04 | 68 FT |
| 103E05000 | PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYMENT BOND | Lump sum |
| 614E11000 | MAINTAINING TRAFFIC | Lump sum |
| 623E10000 | CONSTRUCTION LAYOUT STAKES AND SURVEYING | Lump sum |
| 624E10000 | MOBILIZATION | Lump sum |
| 614E11110 | LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSISTANCE | 40 HOUR |
| 614E12420 | DETOUR SIGNING | Lump sum |