GEA-US 422-13.04 Intersection
GEA County · est $0.8M
Bid dateThursday, January 25—
GEA County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 106 more items below.
| Item | Quantity | R1Digioia-suburban Excavating LLC | R2Eclipse CO LLC | R3Shelly & Sands INC | R4Catts Construction INC | R5S E T INC | R6Burton Scot Contractors LLC | R7Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 611E05900 15" CONDUIT, TYPE B | 1,285 FT | $59.00 | $65.23 | $80.00 | $104 | $100 | $90.00 | $43.00 | 15% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 491 CY | $125 | $131 | $123 | $144 | $130 | $175 | $237 | 12% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( |
| Item | Quantity | R1Digioia-suburban Excavating LLC | R2Eclipse CO LLC | R3Shelly & Sands INC | R4Catts Construction INC | R5S E T INC | R6Burton Scot Contractors LLC | R7Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,400 | $1,865 | $6,000 | $2,430 | $15,250 | $20,000 | $2,000 |
| 201E21800 TREE REMOVED, 18", SPECIFIED LOCATION | 7 EACH | $800 | $788 | $800 | $1,395 | $900 | $800 | $1,155 |
| 201E23000 TREE REMOVED, 30", SPECIFIED LOCATION | 1 EACH |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 240 CY |
| $170 |
| $182 |
| $183 |
| $198 |
| $180 |
| $215 |
| $342 |
| 8% |
| 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11 | 4 EACH | $9,200 | $7,774 | $7,400 | $11,000 | $7,500 | $9,200 | $9,000 | 7% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $28,583 | $49,000 | $29,100 | $32,193 | $50,000 | $33,000 | 5% |
| 809E69100 STOP-BAR RADAR DETECTION | 3 EACH | $7,500 | $7,143 | $7,900 | $8,974 | $6,500 | $7,500 | $2,650 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $38,630 | $20,000 | $16,000 | $100,000 | $40,000 | $37,500 | 4% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,370 FT | $14.50 | $10.99 | $33.00 | $2.75 | $17.00 | $22.00 | $10.00 | 4% |
| 304E20000 AGGREGATE BASE | 405 CY | $48.50 | $68.94 | $65.00 | $84.00 | $50.00 | $90.00 | $50.00 | 4% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $4,800 | $6,408 | $3,700 | $5,740 | $4,000 | $4,800 | $5,500 | 4% |
| 609E26000 CURB, TYPE 6 | 1,117 FT | $15.50 | $21.10 | $24.00 | $13.00 | $13.00 | $15.20 | $33.00 | 3% |
| 809E69000 ADVANCE RADAR DETECTION | 2 EACH | $8,100 | $7,879 | $7,400 | $9,690 | $6,500 | $8,100 | $3,700 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,500 | $3,677 | $19,000 | $8,700 | $22,600 | $15,345 | $20,000 | 3% |
| 203E10000 EXCAVATION | 1,503 CY | $10.00 | $16.01 | $30.00 | $24.50 | $40.00 | $20.00 | $54.00 | 3% |
| 619E16011 FIELD OFFICE, TYPE B, AS PER PLAN | 6 MNTH | $2,500 | $200 | $2,600 | $2,530 | $1,350 | $1,500 | $790 | 3% |
| 442E20200 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 95 CY | $150 | $162 | $180 | $181 | $160 | $240 | $331 | 3% |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 12 SNMT | $1,050 | $1,156 | $1,083 | $1,256 | $1,000 | $1,050 | $1,100 | 3% |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 1,320 FT | $8.75 | $10.23 | $15.00 | $12.00 | $12.00 | $17.00 | $24.00 | 2% |
| AA1 633E01605 CONTROLLER UNIT, TYPE 2070E WITH 2070-1C CPU, AS P | 1 EACH | $11,200 | $10,295 | $10,585 | $13,400 | $10,500 | $11,200 | $15,750 | 2% |
| $1,100 |
| $2,941 |
| $2,500 |
| $2,000 |
| $1,200 |
| $1,100 |
| $2,100 |
| 202E20010 HEADWALL REMOVED | 1 EACH | $250 | $193 | $340 | $460 | $200 | $1,000 | $500 |
| 202E23000 PAVEMENT REMOVED | 776 SY | $8.50 | $15.43 | $11.00 | $13.50 | $10.00 | $30.00 | $10.00 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 50 SY | $4.50 | $11.81 | $10.00 | $10.00 | $11.00 | $25.00 | $10.00 |
| 202E30000 WALK REMOVED | 212 SF | $1.00 | $0.25 | $4.00 | $1.25 | $5.00 | $10.00 | $0.20 |
| 202E32000 CURB REMOVED | 857 FT | $2.50 | $0.50 | $2.50 | $2.30 | $4.00 | $5.00 | $2.00 |
| 202E58000 MANHOLE REMOVED | 4 EACH | $700 | $385 | $435 | $175 | $820 | $1,000 | $588 |
| 202E58100 CATCH BASIN REMOVED | 8 EACH | $500 | $385 | $370 | $175 | $600 | $500 | $470 |
| 202E98100 REMOVAL MISC.:PRIVATE SIGN AND SUPPORT | 3 EACH | $500 | $78.12 | $320 | $97.00 | $250 | $500 | $125 |
| 203E20000 EMBANKMENT | 33 CY | $11.00 | $8.49 | $110 | $18.00 | $15.00 | $73.00 | $20.00 |
| 204E10000 SUBGRADE COMPACTION | 2,280 SY | $1.15 | $1.70 | $2.00 | $1.00 | $2.50 | $3.00 | $2.00 |
| 204E45000 PROOF ROLLING | 2 HOUR | $150 | $215 | $200 | $160 | $250 | $200 | $250 |
| 608E52001 CURB RAMP, AS PER PLAN | 289 SF | $8.00 | $25.84 | $20.00 | $12.00 | $13.00 | $8.00 | $18.00 |
| 608E53020 DETECTABLE WARNING | 48 SF | $35.00 | $25.43 | $25.00 | $25.00 | $13.00 | $35.00 | $34.00 |
| 623E38500 MONUMENT ASSEMBLY | 2 EACH | $1,000 | $831 | $1,100 | $575 | $750 | $1,000 | $950 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $325 | $334 | $83.00 | $450 | $450 | $750 | $425 |
| 623E40520 RIGHT-OF-WAY MONUMENT | 3 EACH | $165 | $105 | $430 | $300 | $185 | $1,000 | $625 |
| 690E50350 SPECIAL - MAILBOX REMOVED AND RESET | 3 EACH | $250 | $151 | $300 | $125 | $300 | $300 | $375 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 1 CY | $200 | $161 | $400 | $770 | $250 | $1,000 | $806 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $175 | $263 | $80.00 | $120 | $150 | $100 | $315 |
| 659E00300 TOPSOIL | 243 CY | $35.00 | $48.00 | $23.00 | $40.00 | $45.00 | $34.00 | $50.00 |
| 659E00500 SEEDING AND MULCHING, CLASS 1 | 2,186 SY | $1.25 | $3.10 | $2.50 | $1.20 | $3.00 | $0.78 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 109 SY | $0.75 | $0.53 | $0.40 | $4.00 | $0.50 | $1.00 | $2.00 |
| 659E15000 INTER-SEEDING | 109 SY | $0.75 | $0.11 | $0.10 | $4.00 | $0.15 | $0.10 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.3 TON | $750 | $499 | $470 | $1,200 | $450 | $800 | $525 |
| 659E31000 LIME | 0.45 ACRE | $200 | $105 | $105 | $100 | $110 | $2.00 | $420 |
| 659E35000 WATER | 12 MGAL | $30.00 | $1.05 | $1.00 | $75.00 | $1.00 | $0.10 | $70.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $4,125 | $5,578 | $6,600 | $7,000 | $8,500 | $3,495 | $2,700 |
| 836E10000 SEEDING AND EROSION CONTROL WITH TURF REINFORCING | 12 SY | $20.00 | $10.19 | $10.00 | $9.00 | $11.00 | $10.00 | $5.00 |
| 602E20000 CONCRETE MASONRY | 0.27 CY | $3,150 | $2,059 | $2,100 | $1,690 | $1,500 | $8,000 | $726 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 100 FT | $12.50 | $10.85 | $32.00 | $13.75 | $9.00 | $25.00 | $24.00 |
| 611E00200 4" CONDUIT, TYPE C | 50 FT | $12.00 | $8.86 | $18.00 | $6.00 | $8.00 | $25.00 | $31.00 |
| 611E01100 6" CONDUIT, TYPE C | 50 FT | $15.50 | $10.07 | $24.00 | $97.00 | $9.00 | $25.00 | $32.00 |
| 611E01500 6" CONDUIT, TYPE F | 103 FT | $14.00 | $9.02 | $30.00 | $25.00 | $16.00 | $32.74 | $32.00 |
| 611E04400 12" CONDUIT, TYPE B | 55 FT | $63.00 | $76.45 | $68.00 | $100 | $95.00 | $150 | $40.00 |
| 611E04600 12" CONDUIT, TYPE C | 10 FT | $67.75 | $88.64 | $90.00 | $180 | $65.00 | $150 | $40.00 |
| 611E98150 CATCH BASIN, NO. 3 | 1 EACH | $2,450 | $2,299 | $2,800 | $3,387 | $2,500 | $3,800 | $1,566 |
| 611E98180 CATCH BASIN, NO. 3A | 5 EACH | $1,950 | $1,978 | $2,500 | $2,650 | $2,350 | $3,500 | $1,566 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,650 | $1,556 | $1,900 | $1,675 | $1,500 | $1,800 | $1,306 |
| 611E98630 CATCH BASIN ADJUSTED TO GRADE | 5 EACH | $500 | $450 | $720 | $485 | $600 | $800 | $586 |
| 611E98650 CATCH BASIN FRAME AND GRATE | 5 EACH | $450 | $741 | $235 | $815 | $600 | $500 | $442 |
| 611E99574 MANHOLE, NO. 3 | 3 EACH | $2,350 | $2,335 | $3,000 | $2,570 | $3,000 | $3,500 | $2,640 |
| 611E99720 INSPECTION WELL | 3 EACH | $650 | $566 | $800 | $1,645 | $250 | $2,500 | $1,870 |
| 611E99820 SPECIAL - MISCELLANEOUS METAL | 500 LB | $1.10 | $2.05 | $1.00 | $1.35 | $1.00 | $5.00 | $3.50 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 1,515 FT | $2.00 | $1.84 | $3.00 | $1.10 | $2.50 | $5.00 | $2.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.5" | 3,813 SY | $2.10 | $2.36 | $3.50 | $2.40 | $2.50 | $5.00 | $5.00 |
| 407E20000 NON-TRACKING TACK COAT | 389 GAL | $4.00 | $4.20 | $2.00 | $4.00 | $4.00 | $3.00 | $5.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 79 CY | $60.00 | $78.64 | $70.00 | $121 | $75.00 | $100 | $50.00 |
| 441E50400 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $550 | $578 | $768 | $605 | $600 | $750 | $342 |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 33 SY | $70.00 | $106 | $230 | $92.00 | $68.00 | $70.00 | $47.00 |
| 617E10100 COMPACTED AGGREGATE | 10 CY | $125 | $74.23 | $123 | $145 | $90.00 | $200 | $59.00 |
| 617E20000 SHOULDER PREPARATION | 287 SY | $1.00 | $6.14 | $0.85 | $34.75 | $3.00 | $7.50 | $11.00 |
| 617E25000 WATER | 0.48 MGAL | $25.00 | $68.08 | $180 | $1,273 | $400 | $250 | $2.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 299 LB | $4.00 | $4.20 | $0.75 | $4.80 | $4.00 | $10.00 | $5.00 |
| 621E00100 RPM | 64 EACH | $66.25 | $79.37 | $26.00 | $10.00 | $70.00 | $25.00 | $70.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 64 EACH | $3.00 | $10.65 | $3.40 | $3.60 | $3.00 | $10.00 | $27.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 172 FT | $10.00 | $9.72 | $6.75 | $11.00 | $11.00 | $10.00 | $11.00 |
| 630E80100 SIGN, FLAT SHEET | 77 SF | $15.00 | $26.26 | $16.00 | $18.00 | $17.00 | $15.00 | $16.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 17 EACH | $25.00 | $10.51 | $26.00 | $29.00 | $28.00 | $25.00 | $27.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 5 EACH | $75.00 | $47.27 | $50.00 | $89.00 | $84.00 | $75.00 | $53.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 14 EACH | $30.00 | $11.56 | $28.00 | $36.00 | $33.00 | $30.00 | $27.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 4 EACH | $20.00 | $15.76 | $31.00 | $24.00 | $22.00 | $20.00 | $53.00 |
| 644E00500 STOP LINE | 72 FT | $6.00 | $7.04 | $11.00 | $7.00 | $7.00 | $6.00 | $12.00 |
| 644E00600 CROSSWALK LINE | 243 FT | $2.75 | $4.88 | $7.00 | $3.25 | $3.00 | $2.75 | $5.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 171 FT | $5.50 | $6.30 | $9.00 | $6.00 | $6.00 | $5.50 | $9.00 |
| 644E01300 LANE ARROW | 5 EACH | $125 | $78.79 | $137 | $149 | $130 | $125 | $163 |
| 646E10010 EDGE LINE, 6" | 0.47 MILE | $3,800 | $15,563 | $7,600 | $4,545 | $4,000 | $3,800 | $9,000 |
| 646E10200 CENTER LINE | 0.37 MILE | $6,500 | $17,249 | $11,000 | $7,775 | $7,000 | $6,500 | $9,000 |
| 646E10300 CHANNELIZING LINE, 8" | 328 FT | $2.20 | $4.20 | $3.00 | $2.60 | $2.50 | $2.20 | $2.00 |
| 625E25400 CONDUIT, 2", 725.04 | 10 FT | $12.00 | $15.76 | $10.00 | $14.00 | $18.00 | $12.00 | $7.00 |
| 625E25402 CONDUIT, 2", 725.05 | 101 FT | $6.50 | $6.30 | $3.00 | $8.00 | $3.00 | $6.50 | $7.00 |
| 625E25600 CONDUIT, 4", 725.04 | 165 FT | $25.00 | $31.52 | $26.00 | $30.00 | $22.00 | $25.00 | $9.00 |
| 625E25602 CONDUIT, 4", 725.05 | 6 FT | $7.00 | $21.01 | $10.00 | $8.00 | $35.00 | $7.00 | $9.00 |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 72 FT | $52.00 | $52.53 | $47.00 | $62.00 | $45.00 | $52.00 | $69.00 |
| 625E29000 TRENCH | 279 FT | $9.00 | $12.61 | $5.80 | $10.00 | $10.00 | $9.00 | $13.00 |
| 625E30706 PULL BOX, 725.08, 24" | 4 EACH | $900 | $945 | $900 | $1,075 | $1,050 | $900 | $1,000 |
| 625E32000 GROUND ROD | 9 EACH | $155 | $299 | $185 | $185 | $150 | $155 | $163 |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 12 EACH | $75.00 | $578 | $264 | $89.00 | $80.00 | $75.00 | $400 |
| 630E80100 SIGN, FLAT SHEET | 36 SF | $18.00 | $26.26 | $26.00 | $21.00 | $20.00 | $18.00 | $16.00 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $900 | $788 | $899 | $1,075 | $650 | $900 | $1,025 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,200 | $1,418 | $1,270 | $1,435 | $1,150 | $1,200 | $1,260 |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 6 EACH | $475 | $525 | $690 | $568 | $400 | $475 | $552 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 9 EACH | $40.00 | $42.02 | $26.00 | $47.00 | $30.00 | $40.00 | $42.00 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 6 EACH | $40.00 | $31.52 | $26.00 | $47.00 | $25.00 | $40.00 | $42.00 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 2 EACH | $175 | $158 | $210 | $209 | $130 | $175 | $290 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 563 FT | $1.95 | $2.65 | $2.50 | $2.30 | $2.00 | $1.95 | $2.00 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 856 FT | $2.25 | $2.88 | $3.00 | $2.65 | $2.00 | $2.25 | $3.00 |
| 632E40900 SIGNAL CABLE, 9 CONDUCTOR, NO. 14 AWG | 277 FT | $2.95 | $3.05 | $3.00 | $3.50 | $3.00 | $2.95 | $3.00 |
| 632E64020 PEDESTAL FOUNDATION | 4 EACH | $700 | $735 | $680 | $837 | $800 | $700 | $735 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 57 FT | $3.00 | $1.58 | $5.00 | $3.50 | $3.00 | $3.00 | $4.00 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 262 FT | $4.00 | $2.10 | $6.00 | $4.70 | $3.00 | $4.00 | $4.00 |
| 632E70000 POWER SERVICE | 1 EACH | $2,800 | $1,156 | $1,500 | $3,350 | $2,500 | $2,800 | $3,600 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $350 | $263 | $260 | $418 | $600 | $350 | $53.00 |
| 632E90000 PEDESTAL, 11', TRANSFORMER BASE | 4 EACH | $750 | $630 | $790 | $897 | $500 | $750 | $940 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $2,800 | $630 | $2,100 | $3,350 | $2,500 | $2,800 | $3,700 |
| 633E67100 CABINET FOUNDATION | 1 EACH | $2,500 | $2,836 | $1,585 | $2,990 | $1,100 | $2,500 | $2,625 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $700 | $473 | $370 | $837 | $200 | $700 | $263 |
| 633E75001 UNINTERRUPTIBLE POWER SUPPLY (UPS), 1000 WATT, AS | 1 EACH | $5,500 | $5,883 | $5,800 | $6,580 | $5,000 | $5,500 | $5,800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $65.00 | $68.28 | $75.00 | $55.00 | $70.00 | $65.00 | $53.00 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.42 MILE | $2,500 | $2,868 | $2,890 | $2,990 | $2,750 | $2,500 | $11,000 |
| 614E22350 WORK ZONE EDGE LINE, CLASS III, 4", 642 PAINT | 0.84 MILE | $1,500 | $2,716 | $2,700 | $1,794 | $1,650 | $1,500 | $6,900 |
| 614E26610 WORK ZONE STOP LINE, CLASS III, 642 PAINT | 20 FT | $3.50 | $2.63 | $2.12 | $5.00 | $4.00 | $3.50 | $6.00 |
| 616E10000 WATER | 1 MGAL | $30.00 | $65.41 | $170 | $375 | $100 | $200 | $13,200 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,500 | $15,907 | $5,000 | $11,100 | $15,000 | $10,000 | $38,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E05900 15" CONDUIT, TYPE B | 1,285 FT | $59 | $76k | 11% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 491 CY | $125 | $61k | 9% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 240 CY | $170 | $41k | 6% |
| 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11 | 4 EACH | $9,200 | $37k | 5% |
| 832E30000 EROSION CONTROL | 30,000 EACH | $1 | $30k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 4% |
| 809E69100 STOP-BAR RADAR DETECTION | 3 EACH | $7,500 | $23k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 3% |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 1,370 FT | $14.5 | $20k | 3% |
| 304E20000 AGGREGATE BASE | 405 CY | $48.5 | $20k | 3% |