D03-LG FY2018
D03 County · est $0.1M
Bid dateThursday, January 11—
D03 County · est $0.1M
Bid form · ODOT
| Item | Qty | Unit price |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount.
| Item | Quantity | R1Miller Cable Company | R2Complete General Construction Company | R3Perram Electric INC | R4J Ranck Electric INC | % of bid |
|---|---|---|---|---|---|---|
| 625E50401 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO | 30 EACH | $1,800 | $2,000 | $1,290 | $5,685 | 50% |
| 625E98000 LIGHTING, MISC.: HOISTING CABLE KIT | 30 EACH | $600 | $900 | $2,070 | $780 | 17% |
| 625E98000 LIGHTING, MISC.: HPS LAMP REPLACEMENT & CLEANING O | 140 EACH | $70.00 | $90.00 | $34.15 | $97.00 | 9% |
| 625E34450 CONTROL CENTER CABINET, COMPLETE | 1 EACH | $8,000 | $3,500 | $6,965 | $3,000 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4,000 | $4,000 | $13,700 | 4% |
| 625E98000 LIGHTING, MISC.: HOLOPHANE FIELD REPRESENTATIVE | 2 EACH | $1,500 | $2,000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $1,945 |
| $2,200 |
| 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,350 | $2,500 | $5,765 | $16,500 | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $690 | $1,500 | $1,800 | $3,000 | 2% |
| 202E75700 CONTROL CENTER REMOVED | 1 LS | $1,290 | $750 | $605 | $900 | 1% |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,000 | $1,200 | $1,310 | $1,200 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $794 | $1,100 | $2,625 | $1,800 | 1% |
| 625E34000 POWER SERVICE | 1 EACH | $750 | $4,000 | $1,310 | $6,700 | 1% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 120 FT | $4.00 | $3.00 | $2.05 | $8.60 | 0% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 4 EACH | $110 | $120 | $105 | $140 | 0% |
| 625E25502 CONDUIT, 3", 725.05 | 15 FT | $25.00 | $17.00 | $11.75 | $10.00 | 0% |
| 625E29000 TRENCH | 15 FT | $25.00 | $13.00 | $10.10 | $42.00 | 0% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $350 | $1,000 | $200 | $3,000 | 0% |
| 625E32000 GROUND ROD | 1 EACH | $325 | $175 | $225 | $300 | 0% |
| 625E40000 SPECIAL - MAINTAIN EXISTING LIGHTING | 1 LS | $100 | $6,200 | $150 | $50.00 | 0% |
| 625E36000 PLASTIC CAUTION TAPE | 15 FT | $0.10 | $1.00 | $1.35 | $3.50 | 0% |
| Extended |
|---|
| % |
|---|
| 625E50401 REPAIR INTEGRAL LUMINAIRE LOWERING MECHANISM OF TO | 30 EACH | $1,800 | $54k | 50% |
| 625E98000 LIGHTING, MISC.: HOISTING CABLE KIT | 30 EACH | $600 | $18k | 17% |
| 625E98000 LIGHTING, MISC.: HPS LAMP REPLACEMENT & CLEANING O | 140 EACH | $70 | $10k | 9% |
| 625E34450 CONTROL CENTER CABINET, COMPLETE | 1 EACH | $8,000 | $8k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 4% |
| 625E98000 LIGHTING, MISC.: HOLOPHANE FIELD REPRESENTATIVE | 2 EACH | $1,500 | $3k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,350 | $2k | 2% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $690 | $2k | 2% |
| 202E75700 CONTROL CENTER REMOVED | 1 LS | $1,290 | $1k | 1% |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,000 | $1k | 1% |