MOT-SR 48-06.12
MOT County · est $0.1M
Bid dateThursday, January 25—
MOT County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 9 more items below.
| Item | Quantity | R1Outdoor Enterprise LLC | R2J & J Schlaegel INC | R3Ohio Irrigation Lawn Sprinkler Systems | R4INC Eagle Bridge CO | R5R B Jergens Contractors INC | R6L J Deweese CO INC | R7John R Jurgensen Company | R8Barrett Paving Materials INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $9,000 | $8,725 | $9,000 | $5,000 | $4,000 | $5,500 | $2,000 | $2,000 | 17% |
| 611E10900 24" CONDUIT, TYPE D | 179 FT | $45.00 | $102 | $110 | $100 |
| Item | Quantity | R1Outdoor Enterprise LLC | R2J & J Schlaegel INC | R3Ohio Irrigation Lawn Sprinkler Systems | R4INC Eagle Bridge CO | R5R B Jergens Contractors INC | R6L J Deweese CO INC | R7John R Jurgensen Company | R8Barrett Paving Materials INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 20 FT | $16.00 | $20.00 | $25.00 | $7.00 | $9.00 | $8.00 | $45.54 | $12.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 10 FT | $28.00 | $15.00 | $5.00 | $9.00 | $15.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $100 |
| $135 |
| $105 |
| $155 |
| 15% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,800 | $2,500 | $5,000 | $4,000 | $6,500 | $5,500 | $14,902 | $16,125 | 7% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 42 SY | $90.00 | $78.00 | $90.00 | $95.00 | $75.00 | $108 | $114 | $115 | 7% |
| 611E10600 24" CONDUIT, TYPE C | 50 FT | $65.00 | $65.00 | $110 | $120 | $145 | $125 | $151 | $180 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3 CY | $1,000 | $600 | $150 | $601 | $580 | $400 | $716 | $575 | 6% |
| 608E15000 8" CONCRETE WALK | 250 SF | $11.00 | $18.00 | $10.00 | $11.00 | $9.00 | $13.00 | $16.83 | $12.00 | 5% |
| 608E10000 4" CONCRETE WALK | 230 SF | $10.00 | $10.00 | $8.00 | $10.00 | $6.50 | $10.00 | $15.42 | $10.00 | 4% |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,200 | $2,850 | $1,500 | $2,750 | $3,100 | $4,500 | $2,914 | $5,000 | 4% |
| 659E10000 SEEDING AND MULCHING | 675 SY | $3.20 | $3.00 | $1.30 | $4.00 | $5.00 | $4.00 | $2.96 | $3.00 | 4% |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $2,000 | $1,150 | $1,200 | $1,300 | $1,750 | $1,800 | $1,631 | $3,200 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $1,500 | $1,000 | $1,500 | $900 | $2,000 | $3,007 | $4,000 | 4% |
| 609E26000 CURB, TYPE 6 | 20 FT | $65.00 | $40.00 | $35.00 | $65.00 | $53.00 | $25.00 | $77.79 | $80.00 | 2% |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $1,300 | $600 | $400 | $2,061 | $300 | $250 | $2,057 | $700 | 2% |
| 202E23000 PAVEMENT REMOVED | 76 SY | $16.00 | $10.00 | $15.00 | $22.00 | $20.00 | $27.00 | $27.27 | $24.00 | 2% |
| 202E35101 PIPE REMOVED, 24" AND UNDER, AS PER PLAN | 130 FT | $9.00 | $30.00 | $5.00 | $35.00 | $90.00 | $15.00 | $23.34 | $50.00 | 2% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 202E30000 WALK REMOVED | 480 SF | $2.00 | $2.00 | $2.50 | $2.00 | $2.00 | $2.00 | $3.81 | $3.00 | 2% |
| 611E04600 12" CONDUIT, TYPE C | 10 FT | $95.00 | $60.00 | $90.00 | $80.00 | $65.00 | $80.00 | $264 | $115 | 2% |
| 304E20000 AGGREGATE BASE | 8 CY | $100 | $58.00 | $50.00 | $120 | $95.00 | $75.00 | $264 | $100 | 2% |
| $15.00 |
| $77.27 |
| $18.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $700 | $350 | $500 | $150 | $500 | $250 | $974 | $750 |
| 204E10000 SUBGRADE COMPACTION | 76 SY | $2.50 | $1.25 | $30.00 | $10.00 | $3.00 | $5.00 | $4.61 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $800 | $600 | $3,000 | $1,000 | $750 | $800 | $3,000 | $3,000 |
| 659E35000 WATER | 2 MGAL | $50.00 | $10.00 | $50.00 | $10.00 | $25.00 | $10.00 | $10.00 | $10.00 |
| 407E10000 TACK COAT | 2 GAL | $100 | $3.00 | $100 | $3.01 | $65.00 | $20.00 | $5.00 | $2.50 |
| 616E10000 WATER | 2 MGAL | $50.00 | $25.00 | $50.00 | $10.00 | $150 | $10.00 | $98.67 | $25.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $600 | $1,500 | $3,000 | $1,000 | $750 | $2,000 | $759 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 624E10000 MOBILIZATION | 1 LS | $9,000 | $9k | 16% |
| 611E10900 24" CONDUIT, TYPE D | 179 FT | $45 | $8k | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,800 | $4k | 7% |
| 452E12010 8" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 42 SY | $90 | $4k | 7% |
| 611E10600 24" CONDUIT, TYPE C | 50 FT | $65 | $3k | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 3 CY | $1,000 | $3k | 5% |
| 608E15000 8" CONCRETE WALK | 250 SF | $11 | $3k | 5% |
| 608E10000 4" CONCRETE WALK | 230 SF | $10 | $2k | 4% |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $2,200 | $2k | 4% |
| 659E10000 SEEDING AND MULCHING | 675 SY | $3.2 | $2k | 4% |