| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 5of 5 | WAR-Central Greenway SUP Seg DSafety | WAR | Apr 2026 | $869k | $697k |
| Rank 5of 5 | MOT-Old N. Dayton Trail, Seg 2Safety | MOT | Apr 2026 | $1.43M | $1.08M |
| Rank 3of 3 | CLE-SR 32-09.80 Herold RdSignals | CLE | Apr 2026 | $792k | $763k |
| Wonof 3 | WAR-SR 123-16.79Pavement | WAR | Apr 2026 | $818k | $818k |
| Rank 2of 4 | HAM-CR 158/CR 460-02.04/00.54Signals | HAM | Mar 2026 | $2.41M | $2.41M |
| Wonof 2 | HAM-IR 74-07.05Pavement | HAM | Mar 2026 | $9.58M | $9.58M |
| Rank 4of 4 | HAM-CR 196-01.89 Delhi AveSignals | HAM | Mar 2026 | $1.66M | $1.53M |
| Wonof 2 | SHE-PAVE-FY26Pavement | SHE | Mar 2026 | $5.00M | $5.00M |
| Rank 4of 4 | HAM-CR 358-00.94 Clough & NewtownSignals | HAM | Mar 2026 | $1.68M | $1.60M |
| Wonof 2 | WAR-SR 73-05.88Pavement | WAR | Feb 2026 | $970k | $970k |
| Wonof 2 | MOT-Westbrook RSF 03.11Pavement | MOT | Feb 2026 | $295k | $295k |
| Rank 2of 2 | CLI-IR 71-04.23Pavement | CLI | Jan 2026 | $3.56M | $3.29M |
| Rank 2of 3 | BUT-SR 73-16.05Pavement | BUT | Jan 2026 | $918k | $878k |
| Rank 2of 3 | CHP-SR 55-15.02Pavement | CHP | Jan 2026 | $474k | $462k |
| Rank 4of 6 | PRE-MR 112-00.99 N Maple Ph 2Pavement | PRE | Jan 2026 | $2.96M | $2.44M |
| Rank 2of 2 | CLE-SR 125-08.95Pavement | CLE | Jan 2026 | $3.06M | $2.82M |
| Rank 2of 2 | HAM-IR 275-36.66Pavement | HAM | Jan 2026 | $11.7M | $9.85M |
| Wonof 2 | BUT-SR 122-00.00Pavement | BUT | Jan 2026 | $2.59M | $2.59M |
| Wonof 2 | HAM-SR 128-00.00Pavement | HAM | Jan 2026 | $2.75M | $2.75M |
| Wonof 2 | HAM-SR 126-06.86Pavement | HAM | Jan 2026 | $4.51M | $4.51M |
| Rank 2of 3 | CLI-US 22-00.00Pavement | CLI | Dec 2025 | $2.29M | $1.98M |
| Rank 3of 3 | CLI-SR 350-00.68Pavement | CLI | Dec 2025 | $2.45M | $1.99M |
| Rank 3of 3 | WAR-SR 73-07.20Pavement | WAR | Dec 2025 | $5.03M | $4.72M |
| Rank 2of 2 | HAM-SR 126-15.68Pavement | HAM | Nov 2025 | $3.68M | $3.28M |
| Rank 6of 10 | CLE-Culverts FY26Drainage | CLE | Nov 2025 | $372k | $294k |
| Rank 2of 3 | WAR-SR 123-00.05 River StPavement | WAR | Nov 2025 | $785k | $769k |
| Wonof 2 | MOT-S. Dixie RSF Ph. 2Pavement | MOT | Oct 2025 | $396k | $396k |
| Rank 2of 2 | BUT-SR 747-00.00Pavement | BUT | Oct 2025 | $4.07M | $3.67M |
| Wonof 2 | BUT-SR 73-09.90Pavement | BUT | Oct 2025 | $2.77M | $2.77M |
| Rank 2of 2 | HAM-SR 4/SR 747-06.13/00.00Pavement | HAM | Oct 2025 | $2.48M | $2.46M |
| Rank 2of 2 | BUT-SR 503-00.00Pavement | BUT | Sep 2025 | $2.70M | $2.64M |
| Rank 3of 3 | CLA-PAVE-FY26 (B)Pavement | CLA | Sep 2025 | $7.63M | $4.77M |
| Rank 4of 5 | HAM-CR 270-02.96 Miami AvePavement | HAM | Sep 2025 | $6.37M | $5.46M |
| Rank 2of 2 | HAM-IR 275-25.45Pavement | HAM | Jul 2025 | $10.5M | $8.96M |
| Rank 2of 2 | MOT-Shiloh Springs Rd. RSFPavement | MOT | Jul 2025 | $495k | $344k |
| Rank 2of 2 | HAM-US 52-35.22Pavement | HAM | Jun 2025 | $1.86M | $995k |
| Wonof 1 | SHE-SR 29-15.14Pavement | SHE | Jun 2025 | $1.10M | $1.10M |
| Rank 2of 2 | MOT-SR 741-08.43Pavement | MOT | Jun 2025 | $931k | $846k |
| Rank 2of 5 | HAM-WW to Glenwood Gardens TrailSafety | HAM | May 2025 | $7.70M | $6.76M |
| Wonof 3 | HAM-CR 91-01.05 Poole Rd SidewalkSafety | HAM | May 2025 | $495k | $495k |
| Rank 2of 2 | GRE-US 35-00.08 (PART 1 AND PART 2)Pavement | GRE | May 2025 | $7.66M | $6.59M |
| Rank 2of 2 | MOT-CS-Denlinger Rd RSF-01.51Pavement | MOT | Apr 2025 | $904k | $838k |
| Rank 2of 2 | HAM-US 22-04.80Pavement | HAM | Mar 2025 | $3.54M | $3.24M |
| Wonof 6 | HAM-IR 71-08.24 Ramp TMaintenance | HAM | Mar 2025 | $508k | $508k |
| Wonof 5 | WAR-US 42-20.23Signals | WAR | Feb 2025 | $1.29M | $1.29M |
| Wonof 3 | MOT-SR 4-19.30Pavement | MOT | Feb 2025 | $4.22M | $4.22M |
| Rank 3of 3 | CLA-US 68-04.43Pavement | CLA | Feb 2025 | $9.28M | $7.09M |
| Wonof 2 | SHE-PAVE-FY25Pavement | SHE | Feb 2025 | $2.88M | $2.88M |
| Wonof 7 | MOT-Woodman Dr ReconstructionPavement | MOT | Jan 2025 | $4.75M | $4.75M |
| Rank 2of 2 | MIA-SR 571-00.00/07.18/13.26Pavement | MIA | Jan 2025 | $3.38M | $2.96M |
| Rank 2of 7 | BUT-SR 122-02.70Signals | BUT | Dec 2024 | $1.79M | $1.78M |
| Rank 3of 5 | HAM-Culverts FY25Drainage | HAM | Nov 2024 | $727k | $442k |
| Wonof 2 | MOT-SR 48/SR 835-06.49/01.48Pavement | MOT | Oct 2024 | $2.23M | $2.23M |
| Wonof 2 | BUT-US 127-07.48Pavement | BUT | Oct 2024 | $5.46M | $5.46M |
| Rank 3of 4 | CLE-East Fork Resurfacing FY25Pavement | CLE | Oct 2024 | $330k | $261k |
| Rank 2of 2 | AUG-SR 65-00.00Pavement | AUG | Oct 2024 | $1.36M | $1.24M |
| Wonof 2 | PRE-SR 726-00.00Pavement | PRE | Sep 2024 | $3.60M | $3.60M |
| Wonof 2 | HAM-IR 275-13.90Pavement | HAM | Sep 2024 | $3.88M | $3.88M |
| Rank 2of 2 | GRE-IR 675-14.91Pavement | GRE | Sep 2024 | $3.56M | $3.50M |
| Rank 2of 2 | D07-/CLA-ST-FY25Pavement | D07 | Jul 2024 | $956k | $619k |
| Rank 2of 2 | HAM-IR 75-02.50 Lg JtsPavement | HAM | Jul 2024 | $4.16M | $2.63M |
| Wonof 2 | DAR-/MOT-SR 722/US 40-12.65/00.00Pavement | DAR | Jun 2024 | $1.57M | $1.57M |
| Wonof 2 | HAM-IR 74-11.16Pavement | HAM | Jun 2024 | $12.9M | $12.9M |
| Rank 3of 3 | HAM-CR 614-01.39 Northland BlvdPavement | HAM | May 2024 | $11.7M | $8.80M |
| Rank 2of 2 | MOT-Spinning Rd Improvement Ph 2Pavement | MOT | May 2024 | $1.18M | $1.15M |
| Rank 2of 2 | MIA-Looney Road ResurfacingPavement | MIA | Apr 2024 | $645k | $644k |
| Rank 2of 3 | CLE-SR 125-11.98Signals | CLE | Apr 2024 | $1.03M | $986k |
| Wonof 6 | HAM-CR 101-13.63Signals | HAM | Apr 2024 | $1.06M | $1.06M |
| Wonof 2 | MOT-Webster St ResurfacingPavement | MOT | Apr 2024 | $995k | $995k |
| Rank 2of 5 | CLE-SR 133-20.30 Shared Use PathSafety | CLE | Apr 2024 | $759k | $737k |
| Rank 2of 2 | MOT-SR 201/SR 202/SR 835-02.18/02.06/00.18Pavement | MOT | Mar 2024 | $1.85M | $1.73M |
| Rank 3of 4 | WAR-SR 123-29.40 Community ParkSignals | WAR | Mar 2024 | $2.49M | $2.31M |
| Rank 2of 2 | MOT-SR 4-02.43Pavement | MOT | Mar 2024 | $2.58M | $2.49M |
| Rank 4of 6 | GRE-US 68-13.51Signals | GRE | Mar 2024 | $2.35M | $2.29M |
| Wonof 2 | BUT-/HAM-SR 128-10.75/00.00 (PART 1 AND PART 2)Pavement | BUT | Feb 2024 | $4.85M | $4.85M |
| Wonof 2 | WAR-SR 73-02.07Pavement | WAR | Feb 2024 | $1.69M | $1.69M |
| Wonof 2 | CLE-US 50/SR 132-07.68/15.85Pavement | CLE | Feb 2024 | $1.09M | $1.09M |
| Wonof 2 | MOT-Wolf Creek St. ResurfacingPavement | MOT | Feb 2024 | $403k | $403k |
| Rank 2of 2 | HAM-IR 275-30.01Safety | HAM | Feb 2024 | $776k | $693k |
| Wonof 2 | MOT-SR 48-08.66Pavement | MOT | Jan 2024 | $1.60M | $1.60M |
| Rank 2of 2 | SHE-SR 29-00.00Pavement | SHE | Jan 2024 | $1.44M | $1.38M |
| Rank 4of 4 | CLE-SR 132-12.49Signals | CLE | Jan 2024 | $2.89M | $2.65M |
| Rank 2of 2 | MOT-IR 70-00.00Pavement | MOT | Jan 2024 | $6.43M | $5.40M |
| Rank 3of 7 | PRE-MR 112-01.316 N. Maple St.Pavement | PRE | Dec 2023 | $2.98M | $2.65M |
| Wonof 2 | BUT-SR 4-09.28Pavement | BUT | Dec 2023 | $19.6M | $19.6M |
| Wonof 1 | SHE-SR 119-02.19Pavement | SHE | Nov 2023 | $1.91M | $1.91M |
| Rank 2of 2 | PRE-US 35-02.62Pavement | PRE | Nov 2023 | $3.45M | $3.30M |
| Wonof 2 | CLE-SR 133-22.00Pavement | CLE | Oct 2023 | $6.09M | $6.09M |
| Rank 2of 2 | WAR-CR 119-00.00 Clearcreek-FrankPavement | WAR | Oct 2023 | $745k | $637k |
| Wonof 2 | HAM-SR 561-03.09Pavement | HAM | Sep 2023 | $2.67M | $2.67M |
| Rank 2of 2 | GRE-US 42-11.26Pavement | GRE | Sep 2023 | $2.24M | $1.80M |
| Wonof 2 | MOT-Spinning Rd Ph 1-00.00-00.61Maintenance | MOT | Aug 2023 | $924k | $924k |
| Rank 2of 2 | BUT-SP FY2024Pavement | BUT | Jul 2023 | $2.29M | $2.16M |
| Wonof 2 | MOT-SR 4-00.00Pavement | MOT | Jul 2023 | $1.09M | $1.09M |
| Rank 2of 2 | MOT-CS-Salem Bend ResurfacingPavement | MOT | Jun 2023 | $329k | $196k |
| Rank 2of 2 | MOT-SR 201-04.48Pavement | MOT | Jun 2023 | $1.53M | $1.30M |
| Rank 2of 2 | HAM-SR 747-00.86Pavement | HAM | Jun 2023 | $925k | $918k |
| Rank 2of 2 | BUT-SR 4-24.00Pavement | BUT | Jun 2023 | $1.49M | $1.39M |
| Wonof 2 | HAM-Embshoff Woods ResurfacingPavement | HAM | Jun 2023 | $1.47M | $1.47M |
| Rank 4of 4 | MOT-Webster St Ramp ConnectorSafety | MOT | May 2023 | $299k | $250k |
| Wonof 2 | MOT-Second St Market Parking LotPavement | MOT | Apr 2023 | $247k | $247k |
| Rank 2of 2 | MOT-Market St. ResurfacingPavement | MOT | Apr 2023 | $218k | $195k |
| Rank 2of 5 | BUT-CR 19-05.88Safety | BUT | Apr 2023 | $1.34M | $1.23M |
| Rank 3of 3 | CLA-SR 235-03.95Pavement | CLA | Apr 2023 | $661k | $607k |
| Wonof 3 | MOT-SR 48-01.02Signals | MOT | Apr 2023 | $2.57M | $2.57M |
| Rank 2of 2 | MOT-Free Pike ResurfacingPavement | MOT | Apr 2023 | $1.32M | $1.05M |
| Rank 3of 3 | CHP-US 36-14.04Pavement | CHP | Apr 2023 | $630k | $550k |
| Wonof 2 | WAR-SR 123-30.65Pavement | WAR | Mar 2023 | $490k | $490k |
| Wonof 2 | PRE-SR 503/Var-05.58/VarPavement | PRE | Mar 2023 | $4.25M | $4.25M |
| Wonof 1 | SHE-SR 29-18.19Pavement | SHE | Mar 2023 | $1.30M | $1.30M |
| Wonof 2 | LOG-SR 235/SR 706-00.00/00.00Pavement | LOG | Mar 2023 | $2.45M | $2.45M |
| Rank 2of 2 | MOT-IR 75-14.74Pavement | MOT | Feb 2023 | $53.6M | $51.7M |
| Rank 3of 4 | WAR-SR 123-28.55Signals | WAR | Feb 2023 | $1.92M | $1.81M |
| Rank 2of 2 | SHE-SR 65/SR 219-05.47/00.75Pavement | SHE | Feb 2023 | $1.59M | $1.39M |
| Wonof 2 | MOT-SR 741-03.16Pavement | MOT | Jan 2023 | $535k | $535k |
| Rank 4of 4 | CLE-SR 32-01.40Pavement | CLE | Dec 2022 | $5.76M | $4.38M |
| Rank 3of 5 | CLE-CR 171 (Old SR74)Pavement | CLE | Dec 2022 | $6.16M | $5.73M |
| Rank 3of 6 | CLI-SR 73-02.66Signals | CLI | Dec 2022 | $3.24M | $2.85M |
| Rank 2of 2 | BUT-SR 126-07.66Pavement | BUT | Nov 2022 | $2.75M | $2.49M |
| Wonof 2 | PRE-US 35/SR 122-13.12/-0.00Pavement | PRE | Nov 2022 | $11.8M | $11.8M |
| Wonof 2 | HAM-IR 75-16.42Pavement | HAM | Nov 2022 | $4.62M | $4.62M |
| Rank 2of 2 | HAM-IR 74/IR 275-03.54/03.97Pavement | HAM | Sep 2022 | $8.85M | $8.00M |
| Rank 2of 2 | HAM-SR 264-01.08Pavement | HAM | Sep 2022 | $4.60M | $3.62M |
| Wonof 5 | PRE-US 127-04.50Signals | PRE | Sep 2022 | $1.49M | $1.49M |
| Rank 2of 2 | CLI-SR 350-04.20Pavement | CLI | Sep 2022 | $994k | $836k |
| Wonof 2 | CLE-SR 743/SR 749-00.00/00.00Pavement | CLE | Aug 2022 | $3.39M | $3.39M |
| Rank 2of 2 | CHP-US 68-05.36Pavement | CHP | Jul 2022 | $1.03M | $926k |
| Rank 3of 5 | HAM-SR 32-06.82Signals | HAM | Jul 2022 | $4.93M | $4.57M |
| Rank 2of 3 | CLE-East Fork WLF ResurfacingPavement | CLE | Jul 2022 | $357k | $317k |
| Rank 2of 2 | CLE-SR 125-15.11Pavement | CLE | Jul 2022 | $1.14M | $1.11M |
| Rank 2of 2 | MOT-SR 202-04.37Pavement | MOT | Jul 2022 | $960k | $748k |
| Wonof 2 | MOT-IR 75-06.86Pavement | MOT | Jul 2022 | $51.4M | $51.4M |
| Rank 2of 2 | MIA-US 36-11.52Pavement | MIA | Jul 2022 | $1.34M | $1.31M |
| Rank 2of 2 | CLE-SR 132-10.80Pavement | CLE | Jul 2022 | $2.19M | $2.00M |
| Wonof 2 | MIA-IR 75-15.02Pavement | MIA | Jun 2022 | $4.59M | $4.59M |
| Wonof 2 | HAM-SR 128-05.70Pavement | HAM | Jun 2022 | $477k | $477k |
| Wonof 2 | HAM-IR 74-11.20Pavement | HAM | Jun 2022 | $1.10M | $1.10M |
| Rank 3of 4 | MOT-W Springfield St ReconPavement | MOT | Jun 2022 | $4.41M | $4.08M |
| Rank 2of 2 | CLE-US 50/SR 131-02.21/08.51Pavement | CLE | May 2022 | $2.11M | $1.56M |
| Wonof 2 | CLA-SR 41-27.57Pavement | CLA | May 2022 | $475k | $475k |
| Rank 2of 2 | WAR-SR 48/SR 122-00.30/05.15Pavement | WAR | May 2022 | $3.94M | $3.04M |
| Wonof 2 | CHP-SR 55-00.23Pavement | CHP | May 2022 | $2.93M | $2.93M |
| Rank 2of 3 | HAM-US 22/SR 3-09.66 SilvertonSignals | HAM | May 2022 | $2.14M | $1.95M |
| Rank 3of 4 | WAR-Clear Crk Bikepath ConnectorSafety | WAR | Apr 2022 | $3.90M | $3.42M |
| Wonof 3 | GRE-SR 72-14.48Pavement | GRE | Apr 2022 | $2.92M | $2.92M |
| Rank 2of 2 | WAR-SR 63/SR 741-00.85/03.66Pavement | WAR | Mar 2022 | $3.18M | $2.50M |
| Rank 2of 2 | MOT-SR 741-04.60Pavement | MOT | Mar 2022 | $738k | $691k |
| Rank 2of 2 | HAM-US 127-09.11 (PART 1 AND PART 2)Pavement | HAM | Mar 2022 | $3.24M | $2.63M |
| Wonof 4 | BUT-US 27-01.85Signals | BUT | Mar 2022 | $3.89M | $3.89M |
| Rank 2of 2 | GRE-SR 235-09.29Pavement | GRE | Mar 2022 | $1.04M | $949k |
| Rank 2of 2 | CLA-US 40/SR 4-09.88/05.46Pavement | CLA | Feb 2022 | $5.25M | $5.01M |
| Rank 2of 2 | HAM-SR 32/SR 125-01.37/01.53Pavement | HAM | Feb 2022 | $2.25M | $1.62M |
| Wonof 4 | MIA-High Street ImprovementsPavement | MIA | Feb 2022 | $3.60M | $3.60M |
| Rank 2of 2 | CLA-IR 70-06.69Pavement | CLA | Feb 2022 | $4.46M | $2.92M |
| Wonof 2 | HAM-IR 75-00.22Pavement | HAM | Jan 2022 | $8.66M | $8.66M |
| Rank 3of 5 | CLE-SR 28-01.76Pavement | CLE | Jan 2022 | $4.26M | $3.90M |
| Rank 7of 7 | MOT-Brookville SRTS IFS 1Safety | MOT | Jan 2022 | $386k | $296k |
| Wonof 1 | SHE-IR 75-08.67Pavement | SHE | Dec 2021 | $8.30M | $8.30M |
| Rank 3of 3 | CLA-US 40/US 42-00.00/00.00Pavement | CLA | Dec 2021 | $2.56M | $2.29M |
| Rank 5of 6 | CLE-SR 32-03.50 (PART 1, 2, 3)Pavement | CLE | Dec 2021 | $45.6M | $42.5M |
| Rank 2of 2 | BUT-SR 4-12.30Signals | BUT | Dec 2021 | $270k | $208k |
| Rank 2of 2 | CLE-SR 450-00.09Pavement | CLE | Nov 2021 | $1.66M | $1.47M |
| Rank 2of 2 | CLE-SR 125-05.13Pavement | CLE | Oct 2021 | $4.82M | $3.95M |
| Wonof 2 | HAM-/CLE-SR 126-22.28/00.00Pavement | HAM | Sep 2021 | $1.81M | $1.81M |
| Rank 2of 2 | HAM-IR 275-28.69Pavement | HAM | Aug 2021 | $23.4M | $22.3M |
| Wonof 2 | HAM-IR 71-16.66Pavement | HAM | Aug 2021 | $6.32M | $6.32M |
| Wonof 4 | HAM-CR 376-00.96 Paddison SidewlkSafety | HAM | Jul 2021 | $383k | $383k |
| Rank 2of 2 | MOT-/MIA-SR 48-25.18/00.00Pavement | MOT | Jul 2021 | $786k | $607k |
| Wonof 2 | PRE-Hueston Wds SP ResurfacingPavement | PRE | Jul 2021 | $923k | $923k |
| Wonof 2 | MOT-SR 835-01.27/02.79Pavement | MOT | Jul 2021 | $767k | $767k |
| Rank 2of 2 | CLE-US 50-07.80Pavement | CLE | Jun 2021 | $529k | $524k |
| Rank 2of 2 | GRE-SR 444-00.00Pavement | GRE | Jun 2021 | $657k | $504k |
| Rank 2of 2 | MOT-SR 48-01.70Pavement | MOT | Jun 2021 | $1.16M | $1.09M |
| Rank 2of 2 | HAM-SR 264-00.00Pavement | HAM | Jun 2021 | $517k | $465k |
| Wonof 9 | CLE-Bike Trail Culvert FY21Drainage | CLE | May 2021 | $163k | $163k |
| Rank 2of 4 | BUT-SR 73-18.08Maintenance | BUT | May 2021 | $290k | $273k |
| Wonof 2 | AUG-/SHE-SR 119/SR 274-05.78/00.00/06.21Pavement | AUG | May 2021 | $1.34M | $1.34M |
| Rank 2of 2 | CLE-SR 756-00.00Pavement | CLE | May 2021 | $7.09M | $6.53M |
| Rank 2of 3 | HAM-IR 275-28.29 (PART 1 AND PART 2)Pavement | HAM | May 2021 | $9.14M | $8.99M |
| Rank 2of 3 | MOT-Mad River Rec Trail ResurfacPavement | MOT | May 2021 | $553k | $541k |
| Rank 2of 2 | MIA-N Hyatt St Repaving ProjectPavement | MIA | May 2021 | $462k | $399k |
| Rank 2of 6 | MIA-CR 25A-03.54Pavement | MIA | Apr 2021 | $1.37M | $1.36M |
| Rank 2of 4 | CLI-US 22-11.75 - Pt. 1 (PART 1 AND PART 2)Pavement | CLI | Apr 2021 | $9.86M | $9.32M |
| Wonof 2 | CLE-SR 32-08.95Signals | CLE | Apr 2021 | $4.87M | $4.87M |
| Rank 3of 4 | HAM-Deer Park Bike/Ped ConnectorSafety | HAM | Apr 2021 | $999k | $866k |
| Rank 2of 2 | WAR-CR 19-02.67 S. Dixie HwyPavement | WAR | Apr 2021 | $1.17M | $1.04M |
| Rank 3of 7 | BUT-SR 4-13.90Signals | BUT | Apr 2021 | $762k | $648k |
| Rank 5of 7 | BUT-SR 4-10.83Signals | BUT | Mar 2021 | $2.13M | $1.75M |
| Wonof 2 | BUT-SR 129-00.00Pavement | BUT | Mar 2021 | $2.14M | $2.14M |
| Wonof 2 | BUT-SR 73-22.55Pavement | BUT | Mar 2021 | $2.54M | $2.54M |
| Wonof 2 | MOT-SR 49-06.40Pavement | MOT | Mar 2021 | $1.38M | $1.38M |
| Rank 2of 3 | CHP-US 36/SR 29-15.05/21.07Pavement | CHP | Feb 2021 | $579k | $563k |
| Rank 5of 5 | MOT-Carriage Hill Metro ParkPavement | MOT | Feb 2021 | $107k | $87k |
| Rank 3of 3 | CHP-SR 29/SR 296-10.08/00.00Pavement | CHP | Feb 2021 | $3.54M | $3.22M |
| Rank 2of 2 | HAM-IR 275-21.65Pavement | HAM | Feb 2021 | $3.44M | $3.00M |
| Wonof 2 | MOT-IR 70-06.71Pavement | MOT | Feb 2021 | $3.65M | $3.65M |
| Rank 2of 2 | MIA-US 36/SR 41-04.61/12.90Pavement | MIA | Feb 2021 | $2.60M | $2.58M |
| Rank 2of 2 | SHE-SR 47-20.95Pavement | SHE | Feb 2021 | $1.30M | $1.29M |
| Wonof 2 | MOT-IR 675-04.11Pavement | MOT | Feb 2021 | $4.33M | $4.33M |
| Rank 2of 7 | HAM-Winton Woods ParkPavement | HAM | Jan 2021 | $409k | $399k |
| Rank 2of 6 | WAR-US 22-07.12Pavement | WAR | Jan 2021 | $1.27M | $1.25M |
| Wonof 3 | CLA-SR 72-11.86Pavement | CLA | Jan 2021 | $898k | $898k |
| Wonof 3 | CLA-SR 41/SR 235-31.26/06.16Pavement | CLA | Jan 2021 | $976k | $976k |
| Rank 2of 6 | CLE-IR 275-07.71Earthwork | CLE | Jan 2021 | $1.13M | $839k |
| Rank 6of 7 | PRE-SR 177 -00.70Signals | PRE | Jan 2021 | $688k | $599k |
| Rank 3of 5 | MOT-E Springfield St ImprovementPavement | MOT | Dec 2020 | $3.91M | $3.66M |
| Rank 3of 7 | BUT-SR 122-10.33Pavement | BUT | Dec 2020 | $929k | $876k |
| Rank 6of 9 | HAM-IR 275-04.06Earthwork | HAM | Dec 2020 | $755k | $662k |
| Wonof 2 | MOT-BH FY20 (B) (PART 1, PART 2)Pavement | MOT | Dec 2020 | $4.82M | $4.82M |
| Wonof 2 | MIA-IR 75-10.84Pavement | MIA | Dec 2020 | $1.48M | $1.48M |
| Rank 2of 2 | HAM-US 22-10.21Pavement | HAM | Dec 2020 | $1.83M | $1.82M |
| Wonof 2 | MOT-SR 48-06.95Pavement | MOT | Nov 2020 | $1.21M | $1.21M |
| Rank 2of 2 | BUT-IR 75-00.00Pavement | BUT | Nov 2020 | $8.28M | $8.04M |
| Wonof 1 | PRE-SR 732-09.46Pavement | PRE | Nov 2020 | $1.13M | $1.13M |
| Rank 2of 5 | BUT-US 127-16.56Signals | BUT | Nov 2020 | $2.79M | $2.70M |
| Wonof 2 | PRE-US 127-14.69Pavement | PRE | Oct 2020 | $2.36M | $2.36M |
| Rank 2of 2 | MOT-SR 725-18.18Pavement | MOT | Oct 2020 | $301k | $293k |
| Rank 2of 2 | CLE-SR 131-11.98Pavement | CLE | Oct 2020 | $558k | $517k |
| Rank 2of 2 | CLE-IR 275-00.00Pavement | CLE | Oct 2020 | $9.58M | $9.55M |
| Rank 5of 6 | MIA-SR 571-15.03Maintenance | MIA | Oct 2020 | $1.68M | $1.29M |
| Wonof 6 | HAM-Dana Ave Storm PipeDrainage | HAM | Aug 2020 | $170k | $170k |
| Rank 3of 5 | HAM-IR 75-03.28Earthwork | HAM | Jul 2020 | $326k | $307k |
| Wonof 2 | MOT-SR 201-08.18Pavement | MOT | Jul 2020 | $422k | $422k |
| Wonof 3 | PRE-US 127/SR 726- 20.00/00.00Pavement | PRE | Jun 2020 | $389k | $389k |
| Rank 2of 3 | CHP-/CLA-SR 54/SR 41-01.70/00.00Pavement | CHP | Jun 2020 | $1.23M | $1.14M |
| Rank 2of 2 | AUG-US 33/SR 65-16.47/07.32Pavement | AUG | Jun 2020 | $2.60M | $2.20M |
| Wonof 4 | MOT-/ GRE - US 35 - 18.57 / 0.00Pavement | MOT | Jun 2020 | $13.2M | $13.2M |
| Wonof 8 | BUT-SR 73-13.05Signals | BUT | May 2020 | $2.94M | $2.94M |
| Rank 5of 10 | BUT-/WAR GMR Trail ExtensionSafety | BUT | Apr 2020 | $2.73M | $2.36M |
| Rank 2of 3 | CHP-/LOG-SR 245-VARPavement | CHP | Apr 2020 | $916k | $887k |
| Wonof 2 | BUT-SR 748-00.00Pavement | BUT | Apr 2020 | $1.32M | $1.32M |
| Rank 3of 9 | CLI-/WAR-SR 350-08.97/01.56Drainage | CLI | Mar 2020 | $287k | $276k |
| Rank 4of 4 | CLE-WAR Culverts FY20 (A) (PART 1 AND PART 2)Drainage | CLE | Mar 2020 | $1.87M | $1.64M |
| Wonof 2 | WAR-/CLI-SR 73-20.05/00.00Pavement | WAR | Mar 2020 | $3.61M | $3.61M |
| Wonof 2 | MIA-US 36-08.25Pavement | MIA | Feb 2020 | $279k | $279k |
| Rank 2of 2 | CLE-US 50-00.00Pavement | CLE | Feb 2020 | $830k | $805k |
| Rank 2of 2 | WAR-SR 741-13.82Pavement | WAR | Feb 2020 | $971k | $958k |
| Wonof 8 | GRE-SR 444-04.60Pavement | GRE | Feb 2020 | $1.46M | $1.46M |
| Rank 2of 2 | SHE-SR 119-09.35Pavement | SHE | Feb 2020 | $1.14M | $1.01M |
| Wonof 2 | SHE-/AUG-IR 75/US 33 VARPavement | SHE | Feb 2020 | $5.30M | $5.30M |
| Wonof 2 | MOT-IR 70-06.71Pavement | MOT | Dec 2018 | $472k | $472k |
| Wonof 2 | GRE-PPS FY 2019Pavement | GRE | Dec 2018 | $308k | $308k |
| Rank 2of 2 | BUT-SR 129-15.89Pavement | BUT | Dec 2018 | $6.05M | $5.89M |
| Wonof 2 | MOT-IR 75-16.35Pavement | MOT | Nov 2018 | $1.40M | $1.40M |
| Rank 5of 8 | HAM-IR 71-08.03Maintenance | HAM | Nov 2018 | $516k | $359k |
| Rank 2of 3 | PRE-Hueston Wds SP Resfce FY19Pavement | PRE | Nov 2018 | $900k | $742k |
| Wonof 2 | D08-GPS FY2018Pavement | D08 | Sep 2018 | $6.70M | $6.70M |
| Wonof 2 | WAR-/CLI-IR 71-07.05/00.00Pavement | WAR | Jul 2018 | $16.1M | $16.1M |
| Wonof 1 | SHE-SR 705-04.26Pavement | SHE | Jul 2018 | $1.52M | $1.52M |
| Rank 2of 3 | CHP-SR 29/SR 235-27.15/06.59Pavement | CHP | Jul 2018 | $767k | $731k |
| Wonof 2 | BUT-SR 747-03.11Pavement | BUT | Jun 2018 | $2.55M | $2.55M |
| Wonof 2 | MOT-SR 725- 19.75Pavement | MOT | Jun 2018 | $1.12M | $1.12M |
| Wonof 2 | CLE-SR 32-02.72 (PART 1 AND PART 2)Pavement | CLE | Jun 2018 | $9.49M | $9.49M |
| Rank 2of 2 | CLA-SR 369-00.00Maintenance | CLA | May 2018 | $255k | $232k |
| Rank 5of 6 | MIA-Looney/Garbry RoundaboutSignals | MIA | May 2018 | $1.08M | $979k |
| Wonof 2 | MIA-SR 48/SR 571-02.43/15.41Pavement | MIA | May 2018 | $791k | $791k |
| Rank 2of 2 | HAM-US 127-11.39Pavement | HAM | May 2018 | $3.29M | $3.28M |
| Rank 2of 5 | HAM-SR 4-04.31 City of WyomingPavement | HAM | May 2018 | $7.99M | $7.38M |
| Rank 3of 3 | GRE-Creekside Trail ResurfacingSafety | GRE | May 2018 | $716k | $586k |
| Wonof 3 | CLA-SR 72-06.77Pavement | CLA | Apr 2018 | $713k | $713k |
| Wonof 1 | SHE-SR 48-03.03Pavement | SHE | Apr 2018 | $467k | $467k |
| Rank 3of 3 | HAM-IR 71-08.42Pavement | HAM | Mar 2018 | $40.3M | $36.0M |
| Wonof 4 | GRE-Central State FY18Maintenance | GRE | Mar 2018 | $864k | $864k |
| Wonof 2 | MOT-US 35/US 40-04.05/11.69Pavement | MOT | Mar 2018 | $990k | $990k |
| Rank 4of 6 | HAM-Harrison Ave BikepathSafety | HAM | Feb 2018 | $749k | $646k |
| Wonof 2 | MOT-CS Washington Church RoadPavement | MOT | Feb 2018 | $127k | $127k |
| Rank 3of 3 | CLA-SMOOTH FY2018Pavement | CLA | Feb 2018 | $4.57M | $4.00M |
| Rank 5of 5 | HAM-Winton Woods ResurfacingPavement | HAM | Feb 2018 | $388k | $271k |
| Rank 4of 10 | CLA-SR 41-26.75/26.93/29.18Drainage | CLA | Feb 2018 | $766k | $680k |
| Rank 4of 4 | HAM-SR 126-19.40Pavement | HAM | Feb 2018 | $2.75M | $2.21M |
| Wonof 2 | MOT-IR 75-14.95Pavement | MOT | Feb 2018 | $1.64M | $1.64M |
| Wonof 2 | MOT-IR 75-03.92Pavement | MOT | Jan 2018 | $1.88M | $1.88M |
| Rank 8of 8 | MOT-SR 48-06.12Maintenance | MOT | Jan 2018 | $99k | $56k |
| Rank 2of 2 | MOT-Airport Access RoadPavement | MOT | Jan 2018 | $1.04M | $948k |
| Wonof 3 | BUT-SR 73-14.67Pavement | BUT | Jan 2018 | $259k | $259k |
| Rank 6of 7 | GRE-US 35-06.24Signals | GRE | Jan 2018 | $199k | $130k |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.