Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
5.0%DBE GoalDBE = Disadvantaged Business Enterprise. Federal-USDOT program targeting at least this much of the contract's value with certified small businesses majority-owned by socially / economically disadvantaged individuals (49 CFR Part 26).
Project scope
Bid form · ODOT
Guardrail & Barrier48%
Erosion & Landscaping14%
Earthwork7%
Aggregate & Base7%
Mobilization & General7%
Maintaining Traffic7%
Per-bidder unit pricing
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 9 more items below.
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$1.40
$1.50
2%
202E38001GUARDRAIL REMOVED, AS PER PLAN
27,275 FT
$1.80
$2.50
2%
606E26550ANCHOR ASSEMBLY, MGS TYPE T
65 EACH
$675
$750
2%
203E20001EMBANKMENT, AS PER PLAN
770 CY
$44.00
$40.00
2%
614E11000MAINTAINING TRAFFIC
1 LS
$29,254
$150,000
1%
623E10001CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P
1 LS
$18,500
$25,000
1%
606E35002MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1
9 EACH
$1,845
$1,900
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$12,500
$20,000
1%
606E15400MGS GUARDRAIL, TYPE 8
525 FT
$23.20
$27.50
1%
606E50000SPECIAL - RESHAPING BERM
75,126 FT
$0.10
$0.50
0%
614E13312BARRIER REFLECTOR, TYPE 2, ONE WAY
966 EACH
$6.00
$7.00
0%
630E85100REMOVAL OF GROUND MOUNTED SIGN AND REERECTION
40 EACH
$125
$100
0%
202E42040ANCHOR ASSEMBLY REMOVED, TYPE T
47 EACH
$80.00
$100
0%
$10.00
670E00500SLOPE EROSION PROTECTION
1,900 SY
$1.95
$4.00
832E30000EROSION CONTROL
1,000 EACH
$1.00
$1.00
Other
10%
Top items by winning bid
Item
Qty
Unit price
Extended
%
606E15050GUARDRAIL, TYPE MGS
38,746 FT
$14.6
$566k
27%
606E15101GUARDRAIL, TYPE MGS WITH LONG POSTS, AS PER PLAN