MAH-Sheridan Rd (Poland)
MAH County · est $0.3M
Bid dateThursday, April 23—
Awarded toECLIPSE CO LLC$349,999.98
MAH County · est $0.3M
Bid form · ODOT
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,258 | $45k | 13% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 128 CY | $353 | $45k | 13% |
| 304E20000 AGGREGATE BASE | 295 CY | $107.25 | $32k | 9% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $95,643.42 2 $45,600.00 3 $97,804.00 4 $71,400.00 | 1 LS | $29,020 | $29k | 8% |
| 203E10000 EXCAVATION | 799 CY | $31.5 | $25k | 7% |
| 659E00300 TOPSOIL | 361 CY | $58.5 | $21k | 6% |
| 611E04600 12" CONDUIT, TYPE C | 203 FT | $84 | $17k | 5% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $56,857.75 2 $74,844.30 3 $69,733.50 4 $99,916.35 | 13,000 EACH | $1 | $13k | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 864 SF | $11.75 | $10k | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,650 | $10k | 3% |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 31 more items below.
| Item | Quantity | R1Eclipse CO LLC | R2Geauga Highway CO | R3Shelly & Sands INC | R4Parella-pannunzio INC | % of bid |
|---|---|---|---|---|---|---|
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $45,258 | $20,000 | $27,855 | $6,500 | 15% |
| 441E70000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (449), PG | 128 CY | $353 | $370 | $321 | $426 | 15% |
| 304E20000 AGGREGATE BASE | 295 CY | $107 | $150 | $98.00 | $160 | 10% |
| 624E10000 MOBILIZATION Section 7 - INCIDENTALS - Totals Awd $95,643.42 2 $45,600.00 3 $97,804.00 4 $71,400.00 | 1 LS | $29,020 | $12,000 | $22,000 | $24,500 | 9% |
| 203E10000 EXCAVATION | 799 CY | $31.50 | $45.00 | $43.00 | $90.00 | 8% |
| 659E00300 TOPSOIL | 361 CY | $58.50 | $85.00 | $82.00 | $120 | 7% |
| 611E04600 12" CONDUIT, TYPE C | 203 FT | $84.00 | $85.00 | $112 | $110 | 5% |
| 832E30000 EROSION CONTROL Section 2 - EROSION CONTROL - Totals Awd $56,857.75 2 $74,844.30 3 $69,733.50 4 $99,916.35 | 13,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 608E52001 CURB RAMP, AS PER PLAN | 864 SF | $11.75 | $32.00 | $38.00 | $34.00 | 3% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,650 | $500 | $4,000 | $1,500 | 3% |
| 659E10000 SEEDING AND MULCHING | 3,247 SY | $2.50 | $4.90 | $2.50 | $3.75 | 3% |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $3,901 | $4,600 | $3,000 | $2,900 | 3% |
| 643E00630 CROSSWALK LINE, 24" Section 5 - TRAFFIC CONTROL - Totals Awd $10,254.88 2 $4,877.00 3 $8,729.50 4 $6,920.50 | 176 FT | $43.75 | $12.00 | $40.00 | $28.00 | 2% |
| 452E10050 6" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC MS Section 4 - PAVEMENT - Totals Awd $83,920.00 2 $104,850.00 3 $78,088.60 4 $109,804.80 | 71 SY | $95.75 | $180 | $110 | $110 | 2% |
| 832E15010 STORM WATER POLLUTION PREVENTION INSPECTION SOFTWA | 1 LS | $6,516 | $3,000 | $6,670 | $14,500 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,419 | $6,600 | $18,874 | $18,950 | 2% |
| 204E10000 SUBGRADE COMPACTION | 1,836 SY | $3.00 | $2.25 | $5.00 | $3.00 | 2% |
| 611E04900 12" CONDUIT, TYPE D | 54 FT | $95.75 | $90.00 | $100 | $165 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,046 | $4,000 | $5,075 | $12,450 | 2% |
| 611E04900 12" CONDUIT, TYPE D, 706.02 | 36 FT | $127 | $96.00 | $200 | $220 | 1% |
| Item | Quantity | R1Eclipse CO LLC | R2Geauga Highway CO | R3Shelly & Sands INC | R4Parella-pannunzio INC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $10,000 | $15,000 | $12,000 |
| 202E23000 PAVEMENT REMOVED | 139 SY | $30.00 | $25.00 | $25.00 | $25.00 |
| 202E30000 WALK REMOVED | 106 SF | $17.00 | $3.75 | $5.00 | $7.00 |
| 202E98100 REMOVAL MISC.:BOLLARD | 9 EACH | $60.00 | $250 | $105 | $50.00 |
| 202E98100 REMOVAL MISC.:INSPECTION WELL | 1 EACH | $210 | $1,100 | $650 | $100 |
| 202E98200 REMOVAL MISC.:CONDUIT | 10 FT | $30.00 | $12.50 | $50.00 | $40.00 |
| 203E20000 EMBANKMENT | 57 CY | $16.25 | $25.00 | $201 | $150 |
| 203E20001 EMBANKMENT, AS PER PLAN | 50 CY | $22.00 | $45.00 | $20.00 | $75.00 |
| 204E13000 EXCAVATION OF SUBGRADE | 25 CY | $29.00 | $75.00 | $25.00 | $30.00 |
| 204E30010 GRANULAR MATERIAL, TYPE B | 25 CY | $88.25 | $100 | $91.00 | $110 |
| 204E45001 PROOF ROLLING, AS PER PLAN | 2 HOUR | $278 | $150 | $370 | $125 |
| 204E50000 GEOTEXTILE FABRIC | 73 SY | $9.25 | $6.00 | $3.00 | $18.00 |
| 608E10000 4" CONCRETE WALK | 215 SF | $11.50 | $15.50 | $14.00 | $19.00 |
| 690E91000 SPECIAL - AS-BUILT CONSTRUCTION PLANS | 1 LS | $2,404 | $6,500 | $5,000 | $5,000 |
| 690E98400 SPECIAL - SURVEY CONTROL VERIFICATION Section 1 - ROADWAY - Totals Awd $62,455.25 2 $107,202.00 3 $126,795.00 4 $157,160.00 | 1 LS | $1,540 | $3,500 | $5,000 | $6,750 |
| 659E20000 COMMERCIAL FERTILIZER | 0.5 TON | $1,033 | $12.00 | $1,010 | $975 |
| 659E35000 WATER | 20 MGAL | $1.00 | $12.00 | $1.00 | $10.00 |
| 670E00500 SLOPE EROSION PROTECTION | 1,346 SY | $1.75 | $5.50 | $1.50 | $3.10 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $2,860 | $2,600 | $2,800 | $3,500 |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $2,354 | $2,000 | $7,000 | $8,560 |
| 602E20000 CONCRETE MASONRY | 0.42 CY | $5,109 | $2,600 | $5,000 | $4,200 |
| 611E97400 CONDUIT, MISC.:TYPE B FOR DRAINAGE DISCHARGE CONTI | 5 FT | $65.00 | $200 | $98.00 | $100 |
| 611E97400 CONDUIT, MISC.:TYPE C FOR DRAINAGE DISCHARGE CONTI | 5 FT | $65.00 | $200 | $98.00 | $100 |
| 611E97400 CONDUIT, MISC.:TYPE E FOR DRAINAGE DISCHARGE CONTI | 5 FT | $65.00 | $200 | $98.00 | $100 |
| 611E97400 CONDUIT, MISC.:TYPE F FOR DRAINAGE DISCHARGE CONTI | 5 FT | $65.00 | $255 | $98.00 | $100 |
| 611E99720 INSPECTION WELL Section 3 - DRAINAGE - Totals Awd $40,619.93 2 $43,138.00 3 $46,646.00 4 $50,624.00 | 1 EACH | $2,570 | $3,000 | $1,250 | $1,900 |
| 407E20000 NON-TRACKING TACK COAT | 92 GAL | $3.25 | $5.00 | $3.05 | $2.90 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 44 FT | $47.50 | $35.00 | $23.00 | $20.00 |
| 630E80100 SIGN, FLAT SHEET | 1.5 SF | $49.25 | $150 | $65.00 | $75.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $97.75 | $250 | $145 | $250 |
| 616E10000 WATER Section 6 - MAINTENANCE OF TRAFFIC - Totals Awd $248.75 2 $50.00 3 $1,500.00 4 $500.00 | 5 MGAL | $49.75 | $10.00 | $300 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →