SAN-SR 53-06.02 sgnl Sfty
SAN County · est $0.2M
Bid dateThursday, February 15—
SAN County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
Bid form · ODOT
| Item | Qty | Unit price | Extended |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 18 more items below.
| Item | Quantity | R1Miller Cable Company | R2U S Utility Contractor Company | R3Complete General Construction Company | R4J Ranck Electric INC | % of bid |
|---|---|---|---|---|---|---|
| 632E81090 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 4 EACH | $8,450 | $11,053 | $10,000 | $13,000 | 21% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $7,400 | $7,465 | $6,500 | $7,500 | 19% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $4,400 | $2,838 | $6,600 | $5,450 | 11% |
| 809E69100 STOP-BAR RADAR DETECTION | 2 EACH | $7,000 | $6,315 | $6,200 |
| Item | Quantity | R1Miller Cable Company | R2U S Utility Contractor Company | R3Complete General Construction Company | R4J Ranck Electric INC |
|---|---|---|---|---|---|
| 625E00450 CONNECTION, FUSED PULL APART | 4 EACH | $115 | $89.25 | $90.00 | $100 |
| 625E23400 NO. 10 AWG POLE AND BRACKET CABLE | 320 FT | $1.00 | $1.58 | $1.25 | $1.15 |
| 625E26251 LUMINAIRE, CONVENTIONAL, AS PER PLAN, AS PER PLAN | 4 EACH | $240 | $364 | $450 | $485 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 15 FT | $10.00 | $50.95 | $30.00 | $8.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $7,000 |
| 9% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 291 FT | $47.00 | $32.59 | $40.00 | $45.00 | 9% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $7,500 | $8,766 | $9,000 | $9,300 | 5% |
| 633E74000 UNINTERRUPTIBLE POWER SUPPLY (UPS) | 1 EACH | $5,000 | $5,039 | $5,000 | $5,000 | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $800 | $826 | $760 | $875 | 3% |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $900 | $855 | $700 | $2,725 | 3% |
| 625E18510 BRACKET ARM, 30' | 4 EACH | $1,000 | $1,265 | $1,500 | $1,368 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $2,940 | $4,000 | $10,000 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $3,700 | $4,783 | $1,200 | $1,300 | 2% |
| 633E67100 CABINET FOUNDATION | 1 EACH | $2,750 | $1,579 | $2,500 | $1,500 | 2% |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,080 FT | $2.50 | $2.39 | $2.50 | $2.20 | 2% |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 714 FT | $3.50 | $2.48 | $2.75 | $2.35 | 2% |
| 632E05111 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 2 EACH | $1,100 | $1,258 | $1,500 | $1,285 | 1% |
| 625E25500 CONDUIT, 3", 725.04 | 140 FT | $15.00 | $16.40 | $22.00 | $33.00 | 1% |
| 625E30710 PULL BOX, 725.08, 32" | 1 EACH | $2,000 | $1,534 | $1,700 | $2,980 | 1% |
| 633E68511 COMMUNICATIONS, AS PER PLAN | 1 EACH | $1,500 | $2,164 | $3,500 | $1,900 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,364 | $2,650 | $1,000 | $1,800 | 1% |
| 6.2 SF |
| $30.00 |
| $49.80 |
| $36.50 |
| $32.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 2 EACH | $10.00 | $98.00 | $100 | $50.00 |
| 611E00400 4" CONDUIT, TYPE E | 40 FT | $2.00 | $9.74 | $12.00 | $12.50 |
| 625E29000 TRENCH | 125 FT | $5.00 | $6.46 | $8.00 | $4.00 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $75.00 | $98.00 | $400 | $850 |
| 625E32000 GROUND ROD | 4 EACH | $200 | $174 | $225 | $225 |
| 625E36000 PLASTIC CAUTION TAPE | 125 FT | $0.20 | $0.55 | $0.50 | $0.50 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 16 EACH | $25.00 | $32.85 | $30.00 | $150 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 53 FT | $3.00 | $3.00 | $3.00 | $5.80 |
| 632E69800 SERVICE CABLE, 3 CONDUCTOR, NO. 6 AWG | 50 FT | $5.00 | $3.50 | $3.00 | $6.00 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,300 | $4,558 | $3,000 | $1,880 |
| 632E90100 REMOVAL OF TRAFFIC SIGNAL INSTALLATION | 1 EACH | $1,200 | $2,940 | $3,000 | $3,700 |
| 633E67200 CONTROLLER WORK PAD | 1 EACH | $750 | $242 | $1,200 | $2,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $200 | $2,500 | $1,000 | $2,000 |
| % |
|---|
| 632E81090 COMBINATION SIGNAL SUPPORT, TYPE TC-81.21, DESIGN | 4 EACH | $8,450 | $34k | 20% |
| 809E69000 ADVANCE RADAR DETECTION | 4 EACH | $7,400 | $30k | 18% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $4,400 | $18k | 11% |
| 809E69100 STOP-BAR RADAR DETECTION | 2 EACH | $7,000 | $14k | 8% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 291 FT | $47 | $14k | 8% |
| 633E65511 CABINET, TYPE TS-2, AS PER PLAN | 1 EACH | $7,500 | $8k | 4% |
| 633E74000 UNINTERRUPTIBLE POWER SUPPLY (UPS) | 1 EACH | $5,000 | $5k | 3% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 6 EACH | $800 | $5k | 3% |
| 625E30706 PULL BOX, 725.08, 24" | 5 EACH | $900 | $5k | 3% |
| 625E18510 BRACKET ARM, 30' | 4 EACH | $1,000 | $4k | 2% |