GRE-Central State FY18
GRE County · est $0.9M
Bid dateThursday, March 22—
GRE County · est $0.9M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 7.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 36 more items below.
| Item | Quantity | R1Barrett Paving Materials INC | R2Belgray, INC | R3A & B Asphalt Corporation | R4Sunesis Construction CO | % of bid |
|---|---|---|---|---|---|---|
| 253E02000 PAVEMENT REPAIR | 520 CY | $195 | $215 | $206 | $34.25 | 14% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,487 CY | $46.00 | $45.00 | $53.26 | $64.00 | 9% |
| 823E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | 453 CY | $139 | $145 | $136 | $136 | 9% |
| 823E20000 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (529 CY | $118 | $124 | $132 | $119 | 8% |
| Item | Quantity | R1Barrett Paving Materials INC | R2Belgray, INC | R3A & B Asphalt Corporation | R4Sunesis Construction CO |
|---|---|---|---|---|---|
| 202E23010 PAVEMENT REMOVED, ASPHALT | 64 SY | $9.00 | $15.00 | $46.07 | $24.00 |
| 202E30000 WALK REMOVED | 2,556 SF | $2.60 | $1.30 | $3.95 | $3.00 |
| 202E32000 CURB REMOVED | 19 FT | $28.00 | $22.00 | $10.00 | $9.00 |
| 202E58100 CATCH BASIN REMOVED | 15 EACH | $465 | $550 | $694 | $770 |
| 203E20000 EMBANKMENT | 195 CY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 522 CY | $118 | $131 | $137 | $115 | 8% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 14 EACH | $4,200 | $4,000 | $4,980 | $4,170 | 8% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,193 FT | $19.50 | $25.00 | $18.25 | $18.00 | 6% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,487 CY | $23.50 | $23.00 | $19.38 | $45.00 | 5% |
| 304E20000 AGGREGATE BASE | 652 CY | $50.00 | $50.00 | $56.46 | $64.50 | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $31,000 | $23,000 | $26,473 | $35,000 | 4% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (3.25") | 7,858 SY | $3.15 | $3.15 | $2.50 | $3.60 | 3% |
| 605E14000 6" BASE PIPE UNDERDRAINS | 1,965 FT | $12.00 | $10.00 | $23.06 | $8.50 | 3% |
| 630E97700 SIGNING, MISC.:SOLAR POWERED RECTANGULAR RAPID FLA | 4 EACH | $5,700 | $5,700 | $7,225 | $7,225 | 3% |
| 203E10000 EXCAVATION | 1,475 CY | $15.00 | $27.00 | $21.87 | $52.50 | 3% |
| 609E12001 COMBINATION CURB AND GUTTER, TYPE 2, AS PER PLAN | 680 FT | $28.75 | $36.00 | $28.50 | $27.00 | 3% |
| 832E30000 EROSION CONTROL | 18,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $15,000 | $13,000 | $3,500 | $8,600 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $14,000 | $20,000 | $9,208 | $80,500 | 2% |
| 202E32500 CURB AND GUTTER REMOVED | 2,873 FT | $4.15 | $7.50 | $10.00 | $12.00 | 2% |
| 608E10001 4" CONCRETE WALK, AS PER PLAN | 1,740 SF | $6.75 | $6.50 | $6.75 | $7.05 | 2% |
| $29.00 |
| $30.00 |
| $50.00 |
| $14.50 |
| 204E10000 SUBGRADE COMPACTION | 3,842 SY | $1.65 | $2.00 | $2.25 | $3.25 |
| 204E45000 PROOF ROLLING | 2 HOUR | $200 | $160 | $125 | $224 |
| 204E50000 GEOTEXTILE FABRIC | 4,465 SY | $1.10 | $1.00 | $5.15 | $1.20 |
| 608E98200 WALKWAY, MISC.: CURB RAMP | 13 EACH | $900 | $1,400 | $800 | $1,245 |
| 690E98000 SPECIAL - UTILITY VALVES ADJUSTED TO GRADE | 4 EACH | $280 | $100 | $955 | $747 |
| 690E98400 SPECIAL - PRIVATE UTILITY LOCATOR | 1 LS | $4,000 | $4,000 | $10,000 | $4,140 |
| 659E00300 TOPSOIL | 50 CY | $60.00 | $55.00 | $119 | $60.00 |
| 659E10000 SEEDING AND MULCHING | 1,000 SY | $2.25 | $5.00 | $2.50 | $6.35 |
| 659E20000 COMMERCIAL FERTILIZER | 0.14 TON | $600 | $550 | $1,250 | $600 |
| 659E35000 WATER | 6 MGAL | $10.00 | $80.00 | $10.00 | $10.00 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 600 FT | $7.00 | $13.00 | $6.00 | $13.70 |
| 605E13300 6" UNCLASSIFIED PIPE UNDERDRAINS | 317 FT | $11.50 | $10.00 | $22.49 | $12.75 |
| 611E04400 12" CONDUIT, TYPE B | 50 FT | $79.00 | $65.00 | $92.07 | $250 |
| 611E98371 CATCH BASIN, NO. 6, AS PER PLAN | 1 EACH | $3,200 | $2,400 | $5,203 | $2,000 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 5 EACH | $520 | $500 | $606 | $464 |
| 407E20000 NON-TRACKING TACK COAT | 1,522 GAL | $2.50 | $2.50 | $3.80 | $2.50 |
| 441E91000 ASPHALT CONCRETE, MISC.: SPEED BUMP | 12 SY | $240 | $290 | $748 | $289 |
| 690E98400 SPECIAL - CONSULTANT FOR CONCRETE QUALITY CONTROL | 1 LS | $8,000 | $5,200 | $3,485 | $5,000 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 65 FT | $10.00 | $10.00 | $15.50 | $15.50 |
| 630E80100 SIGN, FLAT SHEET | 41 SF | $18.00 | $18.00 | $26.25 | $26.25 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 9 EACH | $15.00 | $15.00 | $110 | $110 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 5 EACH | $20.00 | $20.00 | $110 | $110 |
| 642E00790 CURB MARKING, YELLOW FACE | 4,153 FT | $1.65 | $1.08 | $1.65 | $1.10 |
| 642E30000 REMOVAL OF PAVEMENT MARKING | 200 FT | $5.95 | $8.75 | $5.98 | $8.50 |
| 644E00100 EDGE LINE, 4" | 0.01 MILE | $27,830 | $3,850 | $27,830 | $3,850 |
| 644E00600 CROSSWALK LINE | 263 FT | $7.55 | $4.35 | $7.55 | $4.35 |
| 644E20800 YIELD LINE | 46 FT | $9.90 | $44.00 | $9.90 | $44.00 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 50 CY | $53.00 | $50.00 | $118 | $101 |
| 614E12420 DETOUR SIGNING | 1 LS | $5,000 | $10,000 | $6,615 | $3,500 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,500 | $8,109 | $2,424 | $6,250 |
| 623E10001 CONSTRUCTION LAYOUT STAKES AND SURVEYING, AS PER P | 1 LS | $10,000 | $7,500 | $12,000 | $20,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 253E02000 PAVEMENT REPAIR | 520 CY | $195 | $101k | 12% |
| 204E30020 GRANULAR MATERIAL, TYPE C | 1,487 CY | $46 | $68k | 8% |
| 823E10000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | 453 CY | $139 | $63k | 7% |
| 823E20000 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (529 CY | $118 | $62k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 522 CY | $118 | $62k | 7% |
| 611E98181 CATCH BASIN, NO. 3A, AS PER PLAN | 14 EACH | $4,200 | $59k | 7% |
| 609E12000 COMBINATION CURB AND GUTTER, TYPE 2 | 2,193 FT | $19.5 | $43k | 5% |
| 204E13000 EXCAVATION OF SUBGRADE | 1,487 CY | $23.5 | $35k | 4% |
| 304E20000 AGGREGATE BASE | 652 CY | $50 | $33k | 4% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $31,000 | $31k | 4% |