BEL-SR 9-11.79
BEL County · est $0.2M
Bid dateThursday, April 5—
BEL County · est $0.2M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 39 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3Tucson INC | R4Ohio-west Virginia Excavating CO | R5Dennison Bridge INC | % of bid |
|---|---|---|---|---|---|---|---|
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 230 FT | $100 | $100 | $110 | $95.00 | $82.00 | 11% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 315.5 FT | $67.00 | $85.00 | $94.00 | $40.00 | $71.00 | 10% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 690 FT | $27.50 | $27.00 | $35.00 | $32.00 | $32.00 | 9% |
| 511E81300 CONCRETE, MISC.: 8"x24"45" PRECAST CONCRETE LAGGIN |
| Item | Quantity | R1Shelly & Sands INC | R2Alan Stone CO INC | R3Tucson INC | R4Ohio-west Virginia Excavating CO | R5Dennison Bridge INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,000 | $2,500 | $2,600 | $4,000 | $100 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 172 SY | $15.00 | $14.00 | $14.00 | $25.00 | $28.00 |
| 202E38000 GUARDRAIL REMOVED | 215 FT | $1.80 | $4.00 | $3.50 | $3.00 | $5.00 |
| 202E75000 FENCE REMOVED | 290 FT | $3.50 | $3.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 68 EACH |
| $250 |
| $165 |
| $145 |
| $208 |
| $205 |
| 8% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 181 SY | $87.00 | $100 | $69.00 | $115 | $135 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,701 | $19,000 | $5,700 | $30,000 | $22,000 | 6% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 144 CY | $80.00 | $29.00 | $22.00 | $85.00 | $75.00 | 6% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $5,000 | $4,000 | $12,600 | $645 | $2,500 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $21,000 | $14,300 | $7,700 | $15,000 | 5% |
| 622E41000 PORTABLE BARRIER, 32" | 360 FT | $25.00 | $26.00 | $33.00 | $22.00 | $19.00 | 4% |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $2,800 | $1,200 | $700 | $500 | $500 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 25 CY | $321 | $337 | $302 | $400 | $450 | 4% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 212.5 FT | $35.20 | $37.00 | $37.00 | $36.00 | $42.00 | 4% |
| 646E10010 EDGE LINE, 6" | 0.14 MILE | $38,300 | $45,000 | $44,045 | $80,000 | $50,000 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,250 | $4,500 | $8,600 | $2,000 | $2,500 | 3% |
| 202E98000 REMOVAL MISC.: PILING REMOVED | 1 LS | $4,500 | $5,500 | $3,500 | $5,000 | $10,000 | 2% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 14 CY | $315 | $417 | $410 | $360 | $500 | 2% |
| 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), 24" | 2 EACH | $2,185 | $2,000 | $2,250 | $3,500 | $3,000 | 2% |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $70.00 | $75.00 | $88.00 | $120 | $75.00 | 2% |
| 304E20000 AGGREGATE BASE | 43 CY | $85.00 | $107 | $79.00 | $115 | $115 | 2% |
| $2.50 |
| $7.00 |
| $5.00 |
| 203E10000 EXCAVATION | 35 CY | $20.00 | $24.00 | $19.00 | $47.00 | $25.00 |
| 203E20000 EMBANKMENT | 50 CY | $12.00 | $12.00 | $35.00 | $34.00 | $18.00 |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 15 CY | $85.00 | $120 | $54.00 | $182 | $115 |
| 204E10000 SUBGRADE COMPACTION | 197 SY | $3.00 | $2.50 | $2.00 | $7.00 | $5.00 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $825 | $866 | $950 | $1,065 | $900 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $100 | $120 | $195 | $50.00 |
| 659E00300 TOPSOIL | 88 CY | $15.00 | $62.00 | $42.00 | $65.00 | $35.00 |
| 659E10000 SEEDING AND MULCHING | 790 SY | $3.44 | $1.50 | $2.50 | $5.00 | $4.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 40 SY | $1.00 | $9.00 | $1.50 | $3.00 | $4.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $625 | $2,772 | $800 | $950 | $1,000 |
| 659E31000 LIME | 0.16 ACRE | $100 | $735 | $175 | $1,900 | $100 |
| 659E35000 WATER | 5 MGAL | $1.00 | $43.00 | $1.00 | $6.00 | $5.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99711 PRECAST REINFORCED CONCRETE OUTLET, AS PER PLAN | 1 EACH | $719 | $315 | $380 | $230 | $300 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 170 FT | $2.50 | $8.00 | $5.50 | $7.00 | $6.00 |
| 407E10000 TACK COAT | 9 GAL | $2.00 | $2.00 | $3.00 | $2.00 | $25.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 24 GAL | $25.50 | $27.00 | $118 | $30.00 | $35.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 7 CY | $489 | $514 | $464 | $600 | $650 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (8 CY | $422 | $443 | $418 | $540 | $550 |
| 621E00100 RPM | 5 EACH | $125 | $583 | $1,050 | $1,000 | $1,100 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $15.00 | $12.00 | $43.00 | $45.00 | $5.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $5.50 | $6.00 | $6.50 | $15.00 | $12.00 |
| 646E10200 CENTER LINE | 0.03 MILE | $38,300 | $47,000 | $44,045 | $80,000 | $50,000 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BIDIRECTIONAL | 8 EACH | $12.00 | $8.50 | $46.00 | $50.00 | $45.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 8 EACH | $15.00 | $14.00 | $46.00 | $50.00 | $45.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.2 MILE | $11,500 | $10,500 | $13,225 | $14,900 | $13,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.18 MILE | $10,600 | $7,000 | $12,190 | $12,000 | $11,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 20 FT | $10.80 | $6.00 | $12.40 | $14.00 | $25.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $2,500 | $3,500 | $710 | $3,000 | $10,000 |
| 616E10000 WATER | 10 MGAL | $25.00 | $21.00 | $1.00 | $5.00 | $5.00 |
| 511E71100 CONCRETE, MISC.: CAST-IN-PLACE CONCRETE LAGGING | 1 CY | $450 | $525 | $640 | $3,200 | $2,000 |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 15 CY | $150 | $409 | $200 | $200 | $130 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 91 FT | $6.00 | $13.00 | $11.00 | $5.00 | $5.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 5 FT | $55.00 | $61.00 | $20.00 | $30.00 | $20.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,360 | $1,701 | $4,000 | $5,500 | $3,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 230 FT | $100 | $23k | 9% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 315.5 FT | $67 | $21k | 9% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 690 FT | $27.5 | $19k | 8% |
| 511E81300 CONCRETE, MISC.: 8"x24"45" PRECAST CONCRETE LAGGIN | 68 EACH | $250 | $17k | 7% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 181 SY | $87 | $16k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $11,701 | $12k | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 144 CY | $80 | $12k | 5% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $5,000 | $10k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 360 FT | $25 | $9k | 4% |