Ohio DOT · bid history
| Result | Project | County | Let | Their bid | Winning bid |
|---|---|---|---|---|---|
| Rank 5of 6 | ROS-SR 180-02.11Drainage | ROS | Apr 2026 | $1.40M | $1.19M |
| Wonof 6 | VIN-Tar Hollow CulvertDrainage | VIN | Apr 2026 | $400k | $400k |
| Rank 3of 3 | SCI-Shawnee SF BridgesBridge | SCI | Apr 2026 | $297k | $267k |
| Rank 7of 7 | SCI-SR 125-06.26Bridge | SCI | Mar 2026 | $2.22M | $1.97M |
| Wonof 8 | JAC-SR 788-00.87Bridge | JAC | Feb 2026 | $985k | $985k |
| Rank 3of 3 | MEG-SR 124-09.20Pavement | MEG | Feb 2026 | $699k | $575k |
| Rank 5of 6 | ATH-SR 56-00.90Pavement | ATH | Jan 2026 | $1.86M | $1.73M |
| Wonof 4 | HIG-SR 73-21.04Bridge | HIG | Jan 2026 | $2.24M | $2.24M |
| Wonof 7 | ATH-SR 13-13.71Earthwork | ATH | Jan 2026 | $886k | $886k |
| Wonof 5 | JAC-SR 327/SR 32-13.58/17.51Drainage | JAC | Jan 2026 | $536k | $536k |
| Rank 2of 4 | LAW-SR 243-04.38Drainage | LAW | Dec 2025 | $328k | $290k |
| Rank 6of 7 | ROS-CR 550-17.12 (Safety)Signals | ROS | Dec 2025 | $600k | $497k |
| Rank 5of 5 | HOC-SR 664-12.74Signals | HOC | Dec 2025 | $2.78M | $2.05M |
| Wonof 7 | JAC-SR 139-06.82Drainage | JAC | Nov 2025 | $369k | $369k |
| Rank 7of 7 | ROS-SR 138-17.28Bridge | ROS | Nov 2025 | $3.31M | $2.46M |
| Wonof 8 | HIG-SR 73-00.26Bridge | HIG | Nov 2025 | $1.74M | $1.74M |
| Rank 3of 8 | ROS-SR 772-07.64Bridge | ROS | Aug 2025 | $1.69M | $1.65M |
| Rank 5of 5 | JAC-SR 279-02.59Drainage | JAC | Jun 2025 | $329k | $269k |
| Rank 2of 5 | ATH-Madison St BridgeBridge | ATH | May 2025 | $1.90M | $1.87M |
| Rank 2of 4 | LAW-SR 141-05.70Drainage | LAW | Apr 2025 | $1.04M | $662k |
| Rank 2of 3 | SCI-US 52-15.06Other | SCI | Apr 2025 | $2.06M | $1.90M |
| Rank 5of 5 | JAC-SR 93-07.35Drainage | JAC | Mar 2025 | $547k | $388k |
| Wonof 6 | PIK-SR 220-05.50SRDrainage | PIK | Feb 2025 | $554k | $554k |
| Rank 2of 6 | VIN-CR 25-00.20Bridge | VIN | Feb 2025 | $726k | $726k |
| Wonof 6 | HOC-SR 56-05.69/HOC-SR 180-02.33Bridge | HOC | Feb 2025 | $1.69M | $1.69M |
| Rank 3of 7 | VIN-SR 328-08.97Earthwork | VIN | Jan 2025 | $189k | $156k |
| Rank 4of 4 | GAL-SR 218/VAR-14.77/VARDrainage | GAL | Jan 2025 | $1.38M | $998k |
| Rank 2of 6 | MEG-US 33-(07.61)(07.87)Earthwork | MEG | Jan 2025 | $832k | $699k |
| Rank 5of 5 | FAI-US 33-12.53Signals | FAI | Nov 2024 | $1.02M | $756k |
| Wonof 5 | MEG-SR 7-05.28Signals | MEG | Oct 2024 | $288k | $288k |
| Wonof 9 | ATH-SR 682-06.07 RoundaboutSignals | ATH | Oct 2024 | $4.75M | $4.75M |
| Rank 4of 7 | HIG-US 50/US 62-Hillsboro SafetySafety | HIG | Oct 2024 | $398k | $248k |
| Wonof 9 | ROS-SR 772-08.76Earthwork | ROS | Oct 2024 | $218k | $218k |
| Rank 6of 7 | SCI-SR 335-10.31Bridge | SCI | Aug 2024 | $2.14M | $1.95M |
| Wonof 4 | ROS-SR 138-10.98Drainage | ROS | May 2024 | $386k | $386k |
| Rank 2of 3 | PIK-SR 335-20.78Earthwork | PIK | May 2024 | $708k | $681k |
| Rank 4of 6 | JAC-US 35-15.36 SlideEarthwork | JAC | May 2024 | $350k | $309k |
| Rank 2of 2 | GAL-TR 342-00.04Bridge | GAL | Apr 2024 | $980k | $950k |
| Wonof 4 | MEG-CR 39-02.025Bridge | MEG | Apr 2024 | $544k | $544k |
| Rank 5of 7 | PIK-SR 772-13.53 CulvertDrainage | PIK | Apr 2024 | $432k | $333k |
| Rank 5of 7 | JAC-SR 279-04.06Drainage | JAC | Apr 2024 | $369k | $332k |
| Rank 2of 4 | MEG-CR 82-03.51Bridge | MEG | Apr 2024 | $659k | $560k |
| Rank 6of 6 | ATH-Chauncey BikewayBridge | ATH | Apr 2024 | $4.05M | $3.01M |
| Rank 8of 10 | BRO-SR 32 Rest AreaDrainage | BRO | Mar 2024 | $314k | $239k |
| Rank 3of 5 | VIN-US 50-28.74Drainage | VIN | Mar 2024 | $654k | $520k |
| Rank 8of 9 | HIG-SR 138-24.60Drainage | HIG | Feb 2024 | $331k | $217k |
| Rank 2of 3 | LAW-SR 141-16.94Drainage | LAW | Feb 2024 | $883k | $794k |
| Wonof 5 | BRO-US 68-44.16Bridge | BRO | Jan 2024 | $2.55M | $2.55M |
| Rank 2of 6 | HOC-SR 278-05.47Drainage | HOC | Jan 2024 | $416k | $328k |
| Rank 3of 6 | JAC-SR 139-03.17Drainage | JAC | Jan 2024 | $401k | $345k |
| Rank 3of 7 | VIN-SR 328-06.42Drainage | VIN | Jan 2024 | $245k | $217k |
| Rank 5of 7 | ROS-US 23-06.63 (Trego Creek Safety)Safety | ROS | Nov 2023 | $1.71M | $1.40M |
| Wonof 5 | LAW-SR 243-10.84Bridge | LAW | Oct 2023 | $1.84M | $1.84M |
| Wonof 4 | PIK-SR 104-06.14Bridge | PIK | Oct 2023 | $3.13M | $3.13M |
| Rank 3of 4 | LAW-US 52-13.59 (Safety)Signals | LAW | Sep 2023 | $524k | $497k |
| Wonof 3 | ROS-Tar Hollow RdDrainage | ROS | Aug 2023 | $155k | $155k |
| Wonof 4 | ADA-SR 247-13.22/21.18 CulvertSafety | ADA | May 2023 | $645k | $645k |
| Wonof 2 | VIN-CR 7-03.00Bridge | VIN | May 2023 | $548k | $548k |
| Rank 3of 4 | SCI-Shawnee SFDrainage | SCI | Apr 2023 | $446k | $434k |
| Wonof 3 | HIG-SR 41-08.67Drainage | HIG | Apr 2023 | $895k | $895k |
| Wonof 2 | MEG-TR 109/TR 126-00.58/00.58Bridge | MEG | Apr 2023 | $768k | $768k |
| Wonof 2 | MEG-TR 231-00.93Bridge | MEG | Apr 2023 | $463k | $463k |
| Rank 3of 4 | ROS-Tar Hollow ODNR FY23Drainage | ROS | Apr 2023 | $370k | $227k |
| Rank 2of 2 | GAL-US 35-15.96Pavement | GAL | Apr 2023 | $390k | $315k |
| Rank 2of 4 | ADA-SR 770-03.41Bridge | ADA | Apr 2023 | $1.46M | $1.37M |
| Wonof 7 | HIG-SR 753-12.00Drainage | HIG | Mar 2023 | $475k | $475k |
| Rank 2of 7 | HIG-SR 134-07.82Drainage | HIG | Mar 2023 | $544k | $497k |
| Rank 7of 10 | HOC-SR 664-16.51Drainage | HOC | Mar 2023 | $558k | $449k |
| Rank 2of 4 | HIG-SR 73/CR 7-00.50/12.11 (PART 1 AND PART 2)Other | HIG | Feb 2023 | $1.37M | $1.34M |
| Rank 3of 4 | MEG-CR 27-03.969Bridge | MEG | Feb 2023 | $476k | $439k |
| Rank 3of 7 | ROS-SR 327-02.47Drainage | ROS | Feb 2023 | $1.04M | $934k |
| Wonof 7 | JAC-SR 327-03.82Bridge | JAC | Feb 2023 | $591k | $591k |
| Rank 6of 9 | HIG-SR 73-17.61 & 17.66 CulvertDrainage | HIG | Jan 2023 | $336k | $264k |
| Wonof 5 | HIG-SR 72-05.79Bridge | HIG | Jan 2023 | $1.13M | $1.13M |
| Rank 3of 8 | JAC-SR 139-10.44Drainage | JAC | Jan 2023 | $623k | $584k |
| Rank 6of 7 | SCI-SR 125-02.90Drainage | SCI | Dec 2022 | $1.12M | $855k |
| Rank 2of 9 | HIG-TR 239-00.88Bridge | HIG | Nov 2022 | $739k | $735k |
| Rank 3of 8 | VIN-SR 93-12.16Drainage | VIN | Nov 2022 | $1.01M | $905k |
| Wonof 6 | ROS-SR 138-10.38Bridge | ROS | Oct 2022 | $1.62M | $1.62M |
| Rank 3of 7 | VIN-SR 160-16.05Drainage | VIN | Oct 2022 | $753k | $621k |
| Rank 4of 10 | HIG-SR 72-02.26Drainage | HIG | Sep 2022 | $460k | $439k |
| Wonof 8 | HOC-SR 180-05.36Drainage | HOC | Sep 2022 | $799k | $799k |
| Rank 4of 9 | ROS-SR 772-10.60Earthwork | ROS | Jun 2022 | $769k | $662k |
| Rank 3of 4 | MEG-SR 143-09.20Earthwork | MEG | May 2022 | $951k | $880k |
| Rank 4of 5 | GAL-SR 554-10.17/12.63Drainage | GAL | May 2022 | $718k | $658k |
| Rank 2of 5 | BRO-US 62-10.75Earthwork | BRO | May 2022 | $538k | $527k |
| Wonof 6 | ROS-Scioto Trail SFDrainage | ROS | May 2022 | $665k | $665k |
| Rank 2of 4 | SCI-SR 335-09.38 Slide RepairEarthwork | SCI | May 2022 | $287k | $249k |
| Rank 2of 5 | BRO-US 52-03.63 Geotech/LandslideEarthwork | BRO | May 2022 | $180k | $170k |
| Rank 3of 6 | ADA-SR 125-01.34 Slide RepairSafety | ADA | May 2022 | $299k | $279k |
| Rank 2of 10 | MEG-SR 681-04.78Earthwork | MEG | May 2022 | $614k | $595k |
| Rank 4of 4 | GAL-SR 7-29.99Earthwork | GAL | Apr 2022 | $814k | $644k |
| Rank 5of 7 | ATH-SR 329-05.26Earthwork | ATH | Apr 2022 | $2.70M | $1.90M |
| Rank 4of 4 | JAC-SR 327-12.95 CulvertDrainage | JAC | Apr 2022 | $289k | $262k |
| Rank 2of 2 | PIK-SR 104-00.71 CulvertDrainage | PIK | Mar 2022 | $350k | $334k |
| Rank 3of 3 | BRO-US 52-15.71 CulvertDrainage | BRO | Mar 2022 | $279k | $192k |
| Wonof 4 | BRO-SR 763-01.51Drainage | BRO | Mar 2022 | $985k | $985k |
| Rank 2of 5 | MEG-SR 684-00.19Drainage | MEG | Mar 2022 | $368k | $299k |
| Rank 2of 3 | ROS-SR 207-09.32 CulvertDrainage | ROS | Feb 2022 | $309k | $277k |
| Wonof 5 | SCI-SR 239-00.95Bridge | SCI | Feb 2022 | $1.43M | $1.43M |
| Rank 3of 7 | ADA-SR 770-10.25Bridge | ADA | Jan 2022 | $607k | $575k |
| Rank 2of 3 | ROS-SR 772-10.30 OH18-01Earthwork | ROS | Jan 2022 | $1.43M | $1.12M |
| Rank 5of 5 | LAW-SR 7-00.58 Slide RepairEarthwork | LAW | Jan 2022 | $1.17M | $990k |
| Rank 3of 3 | JAC-US 35-(01.79-02.75) Rest StopPavement | JAC | Jan 2022 | $2.99M | $2.57M |
| Rank 4of 10 | ROS-SR 41-05.50 GeotechEarthwork | ROS | Jan 2022 | $492k | $435k |
| Wonof 6 | MEG-CR 163-00.47Bridge | MEG | Jan 2022 | $412k | $412k |
| Rank 4of 5 | LAW-US 52/Solida Rd RoundaboutSignals | LAW | Oct 2021 | $357k | $306k |
| Rank 2of 10 | GAL-SR 218-10.26Earthwork | GAL | Oct 2021 | $580k | $580k |
| Wonof 7 | PIK-SR 220-03.29Bridge | PIK | Sep 2021 | $1.52M | $1.52M |
| Wonof 8 | MEG-SR 143-11.57Earthwork | MEG | Sep 2021 | $203k | $203k |
| Rank 6of 7 | MEG-SR 681-04.95/05.51Earthwork | MEG | Sep 2021 | $2.21M | $1.89M |
| Rank 4of 6 | HOC-Tar Hollow State ParkEarthwork | HOC | Sep 2021 | $319k | $279k |
| Rank 2of 7 | SCI-SR 104-08.15 LandslideDrainage | SCI | Aug 2021 | $853k | $723k |
| Rank 2of 3 | JAC-CR 501-00.73 Bridge ReplaceBridge | JAC | Aug 2021 | $1.31M | $1.25M |
| Rank 6of 8 | ATH-US 33-18.48Earthwork | ATH | Aug 2021 | $2.97M | $2.25M |
| Rank 7of 8 | WAS-SR 550-03.31Earthwork | WAS | Jul 2021 | $396k | $320k |
| Wonof 9 | ATH-Embrey StreetBridge | ATH | Jul 2021 | $472k | $472k |
| Rank 2of 3 | ATH-US 33-10.80Signals | ATH | Jul 2021 | $220k | $207k |
| Rank 7of 10 | WAS-SR 550-09.21Earthwork | WAS | Jul 2021 | $184k | $139k |
| Rank 3of 8 | FAY-SR 41-00.47/02.32Drainage | FAY | May 2021 | $732k | $648k |
| Rank 5of 8 | SCI-SR 348-06.55Bridge | SCI | May 2021 | $556k | $434k |
| Rank 2of 6 | SCI-SR 139-11.38Bridge | SCI | Apr 2021 | $2.07M | $2.04M |
| Wonof 5 | LAW-SR 243-12.76Bridge | LAW | Mar 2021 | $1.27M | $1.27M |
| Rank 4of 7 | GAL-US 35-13.07Earthwork | GAL | Mar 2021 | $469k | $408k |
| Wonof 7 | LAW-SR 775-(15.45)(15.70)Bridge | LAW | Mar 2021 | $1.61M | $1.61M |
| Rank 7of 9 | BRO-SR 505-05.97Drainage | BRO | Feb 2021 | $585k | $444k |
| Wonof 3 | MEG-SR 143-04.96Bridge | MEG | Feb 2021 | $1.15M | $1.15M |
| Rank 4of 7 | ATH-SR 13-06.87Bridge | ATH | Feb 2021 | $916k | $815k |
| Rank 6of 7 | BRO-SR 774-10.47Bridge | BRO | Feb 2021 | $1.09M | $855k |
| Rank 4of 4 | GAL-SR 7-05.22Pavement | GAL | Jan 2021 | $9.60M | $8.18M |
| Rank 2of 9 | SCI-SR 348-09.42Drainage | SCI | Jan 2021 | $484k | $456k |
| Wonof 7 | MEG-CR 1-09.04Bridge | MEG | Jan 2021 | $302k | $302k |
| Rank 4of 8 | ROS-Tar Hollow Slips ODNR FY21Earthwork | ROS | Jan 2021 | $263k | $233k |
| Rank 2of 8 | HIG-SR 41-00.38Bridge | HIG | Jan 2021 | $940k | $924k |
| Rank 4of 10 | PIK-SR 772-13.77 Slide RepairEarthwork | PIK | Jan 2021 | $1.17M | $1.04M |
| Rank 2of 9 | ATH-Woodlane DriveBridge | ATH | Jan 2021 | $572k | $556k |
| Rank 4of 6 | BRO-SR 41-03.34 SafetySafety | BRO | Dec 2020 | $260k | $224k |
| Rank 6of 7 | WAS-SR 555-19.29Bridge | WAS | Dec 2020 | $1.26M | $1.03M |
| Rank 4of 4 | GAL-SR 141-12.46Bridge | GAL | Dec 2020 | $865k | $777k |
| Rank 2of 10 | ROS-SF5-00.00 ODNRDrainage | ROS | Dec 2020 | $140k | $133k |
| Rank 5of 7 | BRO-US 52-15.20 OH18-01Drainage | BRO | Dec 2020 | $378k | $275k |
| Rank 8of 10 | HOC-SR 56-17.47Drainage | HOC | Nov 2020 | $309k | $246k |
| Rank 4of 10 | HIG-SR 28-09.25Drainage | HIG | Nov 2020 | $490k | $473k |
| Rank 3of 6 | SCI-US 23-05.49 SafetySafety | SCI | Nov 2020 | $607k | $516k |
| Rank 8of 10 | ADA-SR 32-23.22Safety | ADA | Nov 2020 | $794k | $579k |
| Wonof 8 | SCI-US 52-02.44 & 10.15Drainage | SCI | Oct 2020 | $857k | $857k |
| Rank 3of 9 | BRO-SR 41-04.18Earthwork | BRO | Sep 2020 | $360k | $317k |
| Rank 4of 5 | GAL-SR 588-11.00Earthwork | GAL | Sep 2020 | $376k | $326k |
| Rank 2of 10 | LAW-CR 169-00.41Drainage | LAW | Aug 2020 | $319k | $308k |
| Rank 4of 8 | GAL-SR 141-04.52Drainage | GAL | Aug 2020 | $749k | $662k |
| Rank 3of 8 | VIN-SR 93-06.67Earthwork | VIN | Jul 2020 | $333k | $254k |
| Rank 3of 4 | WAS-SR 339-07.51Pavement | WAS | Jul 2020 | $828k | $694k |
| Wonof 5 | SCI-SR 139-15.00Drainage | SCI | Jun 2020 | $705k | $705k |
| Rank 3of 5 | MEG-US 33-08.66 RBridge | MEG | Jun 2020 | $134k | $85k |
| Rank 2of 4 | BRO-CR 42A-00.28Bridge | BRO | Jun 2020 | $903k | $889k |
| Wonof 6 | VIN-SR 124-05.09Drainage | VIN | May 2020 | $298k | $298k |
| Rank 5of 6 | BRO-US 52-16.46 OH19-01Earthwork | BRO | May 2020 | $1.09M | $908k |
| Rank 2of 8 | BRO-SR 763-00.62 CulvertDrainage | BRO | May 2020 | $624k | $600k |
| Rank 5of 6 | PIK-SR 32-12.54 LandslideEarthwork | PIK | May 2020 | $454k | $301k |
| Rank 4of 4 | LAW-SR 141-12.98Bridge | LAW | Apr 2020 | $1.62M | $1.54M |
| Rank 2of 7 | GAL-SR 141-08.85Earthwork | GAL | Apr 2020 | $330k | $310k |
| Rank 3of 4 | MEG-SR 124-22.04Earthwork | MEG | Mar 2020 | $469k | $418k |
| Rank 2of 5 | SCI-SR 140-02.16 SafetySafety | SCI | Mar 2020 | $190k | $101k |
| Rank 2of 8 | ROS-US 23-02.50 OH17-01Earthwork | ROS | Mar 2020 | $704k | $676k |
| Rank 2of 5 | SCI-SR 335-08.63Bridge | SCI | Feb 2020 | $1.15M | $1.14M |
| Wonof 4 | SCI-SR 73-11.81Bridge | SCI | Feb 2020 | $2.42M | $2.42M |
| Rank 2of 8 | GAL-US 35 14.800Earthwork | GAL | Feb 2020 | $494k | $469k |
| Rank 2of 3 | JAC-CR 29-08.73Bridge | JAC | Feb 2020 | $983k | $963k |
| Rank 6of 6 | ROS-SR 159-05.06Signals | ROS | Dec 2018 | $1.38M | $1.20M |
| Rank 5of 5 | GAL-SR 775-03.35Bridge | GAL | Nov 2018 | $2.26M | $1.87M |
| Rank 4of 10 | ROS-US 23-16.12Other | ROS | Nov 2018 | $292k | $263k |
| Rank 2of 5 | WAS-US 50-05.50Earthwork | WAS | Nov 2018 | $413k | $321k |
| Rank 5of 9 | HIG-US 50-21.45 Brdg ReplaceBridge | HIG | Nov 2018 | $1.09M | $989k |
| Wonof 5 | ADA-SR 247-07.76 SlideSafety | ADA | Oct 2018 | $393k | $393k |
| Rank 2of 9 | BRO-CR 13-03.30Bridge | BRO | Oct 2018 | $1.93M | $1.83M |
| Rank 3of 5 | ATH-SR 13-00.60Earthwork | ATH | Sep 2018 | $354k | $330k |
| Rank 5of 6 | VIN-US 50-22.78Bridge | VIN | Aug 2018 | $1.16M | $1.03M |
| Rank 4of 4 | ATH-SR 550-14.95Earthwork | ATH | Aug 2018 | $1.29M | $1.09M |
| Rank 3of 7 | JAC-US 35-24.98Earthwork | JAC | Jul 2018 | $1.46M | $1.40M |
| Rank 2of 3 | ATH-SR 144-04.92Earthwork | ATH | Jul 2018 | $492k | $478k |
| Rank 2of 4 | GAL-SR 160-11.55Earthwork | GAL | Jun 2018 | $538k | $516k |
| Rank 4of 4 | SCI-SR 772-01.86Earthwork | SCI | May 2018 | $478k | $380k |
| Rank 9of 10 | JAC-SR 279-09.94Drainage | JAC | Apr 2018 | $240k | $159k |
| Rank 8of 9 | HIG-SR 73-06.57 Brdg ReplaceBridge | HIG | Jan 2018 | $1.25M | $1.02M |
Source: public.bid_results, ODOT bid tabs. Bidder strings are normalized to upper-case but not yet entity-resolved, so related firms (e.g. "Shelly Company" vs "Shelly & Sands") are shown separately.