| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 8,272 FT | $5.6 | $46k |
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 6 more items below.
| Item | Quantity | R1M P Dory CO | R2Complete General Construction Company | R3Asplundh Construction LLC | R4U S Utility Contractor Company | R5Miller Cable Company | % of bid |
|---|---|---|---|---|---|---|---|
| 625E24320 1-1/2" DUCT CABLE WITH THREE NO. 4 AWG 2400 VOLT C | 8,272 FT | $5.60 | $7.00 | $8.40 | $8.61 | $6.75 | 17% |
| 625E29002 TRENCH, 24" DEEP | 8,067 FT | $5.60 | $3.10 | $7.20 | $7.85 | $14.00 | 17% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 28 EACH | $915 | $1,000 | $1,200 | $1,124 | $1,900 | 10% |
| 625E10490 |
| Item | Quantity | R1M P Dory CO | R2Complete General Construction Company | R3Asplundh Construction LLC | R4U S Utility Contractor Company | R5Miller Cable Company |
|---|---|---|---|---|---|---|
| 625E31510 PULL BOX REMOVED | 2 EACH | $340 | $200 | $225 | $223 | $200 |
| 625E36000 PLASTIC CAUTION TAPE | 8,067 FT | $0.10 | $0.60 | $0.20 | $0.24 | $0.40 |
| 625E75510 POWER SERVICE REMOVED | 1 EACH | $1,000 | $750 | $690 | $939 | $800 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 20 HOUR |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 14 EACH |
| $1,780 |
| $1,800 |
| $1,650 |
| $1,701 |
| $2,600 |
| 9% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B35 | 14 EACH | $1,740 | $1,750 | $1,625 | $1,678 | $2,500 | 9% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 28 EACH | $480 | $450 | $465 | $591 | $500 | 5% |
| 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN | 11 EACH | $1,180 | $1,000 | $800 | $998 | $1,150 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $10,000 | $10,300 | $10,000 | 4% |
| 625E75521 LUMINAIRE SUPPORT REMOVED, AS PER PLAN | 27 EACH | $350 | $160 | $395 | $309 | $350 | 4% |
| 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED | 25 EACH | $350 | $350 | $400 | $470 | $350 | 3% |
| 625E23200 NO. 4 AWG 2400 VOLT DISTRIBUTION CABLE | 3,240 FT | $2.20 | $2.00 | $2.30 | $3.22 | $3.25 | 3% |
| 625E34001 POWER SERVICE, AS PER PLAN | 1 EACH | $6,400 | $6,400 | $4,800 | $4,958 | $8,100 | 2% |
| 625E23410 NO. 12 AWG POLE AND BRACKET CABLE | 4,494 FT | $1.20 | $1.10 | $1.00 | $1.51 | $1.80 | 2% |
| 625E00450 CONNECTION, FUSED PULL APART | 56 EACH | $90.00 | $100 | $80.00 | $89.45 | $95.00 | 2% |
| 625E32000 GROUND ROD | 28 EACH | $180 | $200 | $165 | $155 | $265 | 2% |
| 625E25903 CONDUIT, JACKED OR DRILLED, 725.04, AS PER PLAN, 3 | 89 FT | $50.00 | $40.00 | $50.00 | $37.22 | $40.00 | 2% |
| 625E30700 PULL BOX, 725.08, 18" | 4 EACH | $930 | $825 | $640 | $728 | $950 | 1% |
| 625E75551 DISTRIBUTION CABLE REMOVED, AS PER PLAN | 8,067 FT | $0.40 | $1.50 | $1.00 | $1.24 | $0.20 | 1% |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 34 EACH | $90.00 | $120 | $85.00 | $92.90 | $95.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,600 | $2,000 | $980 | $5,348 | $1,887 | 1% |
| $50.00 |
| $70.00 |
| $70.00 |
| $63.25 |
| $80.00 |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $500 | $3,000 | $8,500 | $21,430 | $2,600 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $500 | $1,500 | $2,500 | $4,900 | $1,600 |
| 17% |
| 625E29002 TRENCH, 24" DEEP | 8,067 FT | $5.6 | $45k | 17% |
| 625E14100 LIGHT POLE FOUNDATION, 24" X 8' DEEP | 28 EACH | $915 | $26k | 9% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT15B35 | 14 EACH | $1,780 | $25k | 9% |
| 625E10490 LIGHT POLE, CONVENTIONAL, AT12B35 | 14 EACH | $1,740 | $24k | 9% |
| 625E26253 LUMINAIRE, CONVENTIONAL, SOLID STATE (LED), AS PER | 28 EACH | $480 | $13k | 5% |
| 625E31507 PULL BOX REMOVED AND REPLACED, AS PER PLAN | 11 EACH | $1,180 | $13k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 625E75521 LUMINAIRE SUPPORT REMOVED, AS PER PLAN | 27 EACH | $350 | $9k | 3% |
| 625E75522 LUMINAIRE SUPPORT FOUNDATION REMOVED | 25 EACH | $350 | $9k | 3% |