MED County · est $0.3M
Bid dateThursday, May 3—
MED County · est $0.3M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 8 more items below.
| Item | Quantity | R1Lockhart Concrete CO | R2Shelly & Sands INC | R3Suburban Maintenance & Construction | R4INC Brayman Construction Corporation | % of bid |
|---|---|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 516.5 FT | $135 | $111 | $111 | $220 | 21% |
| 507E00400 STEEL PILES, MISC.:W27x129 STEEL BEAM, FURNISHED | 796.5 FT | $67.00 | $77.00 | $75.00 | $90.00 | 16% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 36" DIAMETER, UNR | 405 FT | $99.00 | $111 | $111 | $160 | 12% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 294 FT | $135 | $130 |
| Item | Quantity | R1Lockhart Concrete CO | R2Shelly & Sands INC | R3Suburban Maintenance & Construction | R4INC Brayman Construction Corporation |
|---|---|---|---|---|---|
| 659E10000 SEEDING AND MULCHING | 112 SY | $1.00 | $18.90 | $18.90 | $22.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 6 SY | $1.00 | $0.40 | $0.40 | $1.00 |
| 659E15000 INTER-SEEDING | 6 SY | $1.00 | $0.10 | $0.10 | $1.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.02 TON | $600 | $1,350 | $1,350 | $1,585 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $350 |
| $250 |
| 12% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 309.4 CY | $100 | $120 | $130 | $140 | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $65,700 | $50,000 | $36,500 | 8% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $10,000 | $50,000 | $20,000 | 6% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $7,500 | $5,000 | $20,500 | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $2,600 | $10,000 | $4,700 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $7,500 | $17,000 | $10,000 | 2% |
| 203E10000 EXCAVATION | 450 CY | $15.00 | $30.00 | $45.00 | $80.00 | 2% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 606E16500 GUARDRAIL REBUILT, TYPE 5 | 162.5 FT | $20.00 | $17.40 | $17.50 | $20.00 | 1% |
| 203E07502 SPECIAL - INCLINOMETER | 1 EACH | $1,000 | $1,350 | $3,500 | $2,000 | 0% |
| 202E38200 GUARDRAIL REMOVED FOR REUSE | 162.5 FT | $6.00 | $1.80 | $3.00 | $2.00 | 0% |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $400 | $3,150 | $1,800 | $3,000 | 0% |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $250 | $75.00 | $900 | $150 | 0% |
| 659E00300 TOPSOIL | 12 CY | $40.00 | $50.00 | $45.00 | $240 | 0% |
| 617E10100 COMPACTED AGGREGATE | 8.7 CY | $50.00 | $100 | $350 | $330 | 0% |
| 203E20000 EMBANKMENT | 25 CY | $15.00 | $30.00 | $30.00 | $140 | 0% |
| 659E31000 LIME |
| 0.02 ACRE |
| $400 |
| $100 |
| $100 |
| $118 |
| 659E35000 WATER | 0.62 MGAL | $50.00 | $1.00 | $10.00 | $12.00 |
| 605E98000 UNDERDRAINS, MISC.:EXTENSION | 10 FT | $20.00 | $45.00 | $20.00 | $350 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, 1WAY | 4 EACH | $12.00 | $7.50 | $8.00 | $9.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 516.5 FT | $135 | $70k | 21% |
| 507E00400 STEEL PILES, MISC.:W27x129 STEEL BEAM, FURNISHED | 796.5 FT | $67 | $53k | 16% |
| 524E95000 DRILLED SHAFTS, MISC.:PLUG PILE, 36" DIAMETER, UNR | 405 FT | $99 | $40k | 12% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 294 FT | $135 | $40k | 12% |
| 601E32000 ROCK CHANNEL PROTECTION, TYPE A WITH FILTER | 309.4 CY | $100 | $31k | 10% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,000 | $25k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 6% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $10k | 3% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $9,000 | $9k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $7k | 2% |