ADA-SR 348-01.52
ADA County · est $0.4M
Bid dateThursday, May 17—
ADA County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 8%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 33 more items below.
| Item | Quantity | R1Coopers Excavating LLC | R2Shelly & Sands INC | R3Allard Excavation LLC | R4Native Construction LLC | R5Sunesis Construction CO | R6Axis Civil Construction LLC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 611E96200 12' X 10' CONDUIT, TYPE A, 706.05 | 84 FT | $1,377 | $1,310 | $1,700 | $1,135 | $1,649 | $1,675 | 33% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $40,000 | $2,500 | $7,000 | $4,550 | $2,999 | $5,000 | 11% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 97 CY | $350 | $450 | $284 | $500 |
| Item | Quantity | R1Coopers Excavating LLC | R2Shelly & Sands INC | R3Allard Excavation LLC | R4Native Construction LLC | R5Sunesis Construction CO | R6Axis Civil Construction LLC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $1,000 | $12,500 | $3,100 | $4,000 | $2,950 | $9,500 |
| 202E23000 PAVEMENT REMOVED | 245 SY | $8.25 | $6.00 | $8.19 | $18.00 | $11.50 | $10.00 |
| 202E35200 PIPE REMOVED, OVER 24" | 45 FT | $30.00 | $46.00 | $4.83 | $24.00 | $11.89 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $281 |
| $450 |
| 10% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 35 CY | $940 | $750 | $510 | $560 | $552 | $900 | 9% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $20,000 | $20,000 | $7,000 | $9,000 | $35,502 | $25,000 | 6% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $10,000 | $50,000 | $30,849 | $26,815 | $20,000 | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 10,859 LB | $1.35 | $0.65 | $1.00 | $1.17 | $1.50 | $2.00 | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $4,500 | $4,000 | $5,500 | $2,750 | $4,500 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 31 CY | $300 | $255 | $255 | $255 | $295 | $350 | 3% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 108 CY | $85.00 | $125 | $52.00 | $110 | $75.19 | $90.00 | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 50 CY | $175 | $300 | $300 | $300 | $259 | $130 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 28 CY | $275 | $235 | $235 | $235 | $255 | $300 | 2% |
| 611E16200 36" CONDUIT, TYPE A | 50 FT | $115 | $150 | $102 | $85.00 | $147 | $220 | 2% |
| 512E33000 TYPE 2 WATERPROOFING | 379 SY | $15.00 | $23.50 | $23.50 | $18.00 | $12.69 | $16.00 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $5,000 | $8,500 | $6,200 | $9,169 | $5,097 | $7,500 | 1% |
| 253E01000 PAVEMENT REPAIR | 75 SY | $50.00 | $160 | $160 | $160 | $116 | $50.00 | 1% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 49 CY | $75.00 | $140 | $53.00 | $90.00 | $72.16 | $120 | 1% |
| 202E11000 STRUCTURE REMOVED | 1 LS | $3,670 | $7,500 | $2,450 | $16,000 | $1,816 | $20,000 | 1% |
| 642E00290 CENTER LINE | 3 MILE | $1,200 | $1,320 | $1,200 | $1,010 | $1,320 | $1,200 | 1% |
| 304E20000 AGGREGATE BASE | 44 CY | $75.00 | $87.00 | $64.00 | $105 | $79.07 | $100 | 1% |
| $50.00 |
| 203E10000 EXCAVATION | 95 CY | $10.50 | $25.00 | $15.75 | $36.00 | $26.23 | $23.00 |
| 203E20000 EMBANKMENT | 303 CY | $7.39 | $14.00 | $7.80 | $38.00 | $18.46 | $23.00 |
| 204E10000 SUBGRADE COMPACTION | 405 SY | $2.00 | $6.00 | $3.00 | $9.71 | $2.02 | $2.00 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 46 SY | $35.75 | $75.00 | $55.99 | $112 | $87.36 | $75.00 |
| 616E10000 WATER | 1 MGAL | $1.00 | $15.00 | $1.00 | $1.00 | $65.40 | $1.00 |
| 659E10000 SEEDING AND MULCHING | 790 SY | $3.45 | $3.10 | $5.75 | $3.80 | $5.78 | $2.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 40 SY | $3.00 | $0.70 | $0.05 | $0.75 | $1.00 | $3.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $625 | $650 | $450 | $570 | $750 | $625 |
| 659E31000 LIME | 0.16 ACRE | $80.00 | $157 | $150 | $100 | $200 | $80.00 |
| 659E35000 WATER | 4.3 MGAL | $1.00 | $1.00 | $10.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 2 CY | $1,500 | $1,500 | $1,151 | $300 | $951 | $1,850 |
| 605E31100 AGGREGATE DRAINS | 56 FT | $15.00 | $25.00 | $14.50 | $22.00 | $8.37 | $12.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 44 FT | $10.00 | $8.50 | $8.70 | $14.00 | $10.23 | $3.00 |
| 407E10000 TACK COAT | 52 GAL | $4.00 | $2.00 | $2.00 | $2.00 | $8.00 | $3.00 |
| 411E10000 STABILIZED CRUSHED AGGREGATE | 41 CY | $65.25 | $95.00 | $53.00 | $108 | $68.87 | $110 |
| 621E00100 RPM | 5 EACH | $416 | $301 | $1,150 | $416 | $301 | $675 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $5.00 | $40.00 | $10.50 | $20.00 | $0.01 | $30.00 |
| 642E00094 EDGE LINE, 6" | 0.08 MILE | $12,525 | $10,065 | $12,525 | $14,650 | $10,065 | $12,525 |
| 642E00290 CENTER LINE | 0.04 MILE | $24,650 | $20,130 | $24,650 | $15,315 | $20,130 | $24,650 |
| 407E10000 TACK COAT | 50 GAL | $4.00 | $2.00 | $2.00 | $2.00 | $8.00 | $5.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 8 HOUR | $25.00 | $68.00 | $75.00 | $85.00 | $65.00 | $70.00 |
| 617E10100 COMPACTED AGGREGATE | 25 CY | $45.00 | $100 | $46.00 | $30.00 | $93.34 | $60.00 |
| 617E25000 WATER | 2 MGAL | $1.00 | $35.00 | $1.00 | $1.00 | $32.70 | $1.00 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $250 | $1,500 | $1,600 | $3,000 | $1,015 | $500 |
| 503E11100 COFFERDAMS AND EXCAVATION BRACING | 1 LS | $500 | $7,500 | $5,600 | $15,000 | $13,609 | $15,000 |
| 511E46610 CLASS QC1 CONCRETE, HEADWALL | 1 CY | $3,000 | $1,300 | $5,500 | $800 | $9,706 | $2,200 |
| 512E10100 SEALING OF CONCRETE SURFACES (EPOXY-URETHANE) | 97 SY | $25.50 | $25.00 | $25.00 | $22.00 | $31.16 | $20.00 |
| 516E13600 1" PREFORMED EXPANSION JOINT FILLER | 50 SF | $2.00 | $3.00 | $1.83 | $14.00 | $2.69 | $4.00 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $500 | $5,000 | $1,200 | $2,000 | $1,991 | $1,300 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 611E96200 12' X 10' CONDUIT, TYPE A, 706.05 | 84 FT | $1,377 | $116k | 30% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $40,000 | $40k | 10% |
| 511E46510 CLASS QC1 CONCRETE, FOOTING | 97 CY | $350 | $34k | 9% |
| 511E46010 CLASS QC1 CONCRETE, RETAINING/WINGWALL NOT INCLUDI | 35 CY | $940 | $33k | 9% |
| 503E21301 UNCLASSIFIED EXCAVATION, AS PER PLAN | 1 LS | $20,000 | $20k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $15,000 | $15k | 4% |
| 509E10000 EPOXY COATED REINFORCING STEEL | 10,859 LB | $1.35 | $15k | 4% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $10,000 | $10k | 3% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 31 CY | $300 | $9k | 2% |
| 601E32010 ROCK CHANNEL PROTECTION, TYPE A WITH AGGREGATE FIL | 108 CY | $85 | $9k | 2% |