GEA-SR-SR 528/SR 608-04.39/00.00 Safety
GEA County · est $0.8M
Bid dateThursday, May 17—
GEA County · est $0.8M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 9%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 107 more items below.
| Item | Quantity | R1Karvo Companies INC | R2Eclipse CO LLC | R3S E T INC | R4Burton Scot Contractors LLC | % of bid |
|---|---|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 713 CY | $133 | $125 | $140 | $172 | 13% |
| 304E20000 AGGREGATE BASE | 1,062 CY | $75.00 | $65.00 | $70.00 | $65.00 | 11% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 416 CY | $173 | $158 | $180 | $210 | 10% |
| 624E10000 MOBILIZATION | 1 LS | $71,100 | $40,000 | $78,000 | $40,000 | 9% |
| Item | Quantity | R1Karvo Companies INC | R2Eclipse CO LLC | R3S E T INC | R4Burton Scot Contractors LLC |
|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $9,500 | $45,827 | $25,500 | $5,500 |
| 202E20010 HEADWALL REMOVED | 2 EACH | $270 | $100 | $200 | $500 |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 73 SY | $11.00 | $16.85 | $14.00 | $45.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 64 FT | $12.00 | $14.95 | $32.00 | $100 |
| 202E38000 GUARDRAIL REMOVED | 619 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 203E10000 EXCAVATION | 2,139 CY | $33.00 | $13.80 | $35.00 | $56.00 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $70,170 | $76,217 | $39,500 | $40,100 | 9% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (219 CY | $177 | $159 | $170 | $240 | 5% |
| 832E30000 EROSION CONTROL | 33,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 4% |
| 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11 | 3 EACH | $8,317 | $8,566 | $7,000 | $8,317 | 3% |
| 809E69100 STOP-BAR RADAR DETECTION | 4 EACH | $6,115 | $6,298 | $7,850 | $6,115 | 3% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 303 FT | $77.70 | $80.05 | $52.00 | $77.70 | 3% |
| 659E00300 TOPSOIL | 691 CY | $32.00 | $32.00 | $40.00 | $32.00 | 3% |
| 832E15002 STORM WATER POLLUTION PREVENTION INSPECTIONS | 1 LS | $20,500 | $14,417 | $25,000 | $6,500 | 3% |
| 614E18600 PORTABLE CHANGEABLE MESSAGE SIGN | 20 SNMT | $950 | $1,442 | $1,000 | $950 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $15,125 | $30,900 | $15,500 | $15,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $15,000 | $39,500 | $10,500 | $12,500 | 2% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 4 EACH | $3,510 | $3,615 | $4,500 | $3,510 | 2% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 263 SY | $53.00 | $120 | $60.00 | $100 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 813 FT | $16.60 | $17.10 | $17.00 | $16.60 | 2% |
| 632E80628 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 14 | 1 EACH | $13,372 | $13,773 | $14,500 | $13,372 | 2% |
| $1.80 |
| $1.00 |
| $2.50 |
| $1.80 |
| 202E53100 MAILBOX REMOVED | 7 EACH | $10.00 | $50.00 | $15.00 | $100 |
| 202E58300 CATCH BASIN OR INLET REMOVED | 1 EACH | $270 | $478 | $600 | $950 |
| 202E75000 FENCE REMOVED | 306 FT | $2.50 | $1.00 | $3.00 | $8.50 |
| 202E98100 REMOVAL MISC.:CONCRETE PAD | 4 EACH | $67.00 | $239 | $180 | $500 |
| 202E98100 REMOVAL MISC.:MULCHED FLOWER BED | 2 EACH | $67.00 | $146 | $250 | $500 |
| 202E98100 REMOVAL MISC.:ORNAMENTAL METAL SIGN | 1 EACH | $115 | $478 | $110 | $350 |
| 202E98100 REMOVAL MISC.:WOOD POST | 2 EACH | $60.00 | $93.40 | $75.00 | $170 |
| 202E98200 REMOVAL MISC.:WOOD RETAINING WALL | 10 FT | $25.00 | $47.85 | $30.00 | $100 |
| 203E20000 EMBANKMENT | 1,057 CY | $7.00 | $10.40 | $15.00 | $17.00 |
| 204E10000 SUBGRADE COMPACTION | 4,557 SY | $1.50 | $1.20 | $2.50 | $3.00 |
| 204E45000 PROOF ROLLING | 3 HOUR | $150 | $223 | $250 | $185 |
| 209E60501 LINEAR GRADING, AS PER PLAN | 0.18 MILE | $18,000 | $9,283 | $42,000 | $17,000 |
| 606E20050 ROUNDED END SECTION | 3 EACH | $65.00 | $66.95 | $68.00 | $65.00 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 1 EACH | $1,770 | $1,823 | $1,850 | $1,770 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,125 | $2,189 | $2,250 | $2,125 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 4 EACH | $795 | $819 | $840 | $795 |
| 607E98000 FENCE, MISC.: TEMPORARY FENCE | 300 FT | $7.95 | $10.20 | $8.00 | $5.50 |
| 608E10000 4" CONCRETE WALK | 106 SF | $12.00 | $11.20 | $13.00 | $26.00 |
| 608E53020 DETECTABLE WARNING | 16 SF | $13.75 | $66.35 | $45.00 | $25.00 |
| 623E39500 MONUMENT BOX ADJUSTED TO GRADE | 1 EACH | $475 | $478 | $350 | $1,200 |
| 690E50100 SPECIAL - MAILBOX SUPPORT SYSTEM, SINGLE | 7 EACH | $135 | $146 | $150 | $135 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 4 SY | $112 | $109 | $175 | $175 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $100 | $258 | $125 | $100 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 6,222 SY | $0.73 | $1.18 | $3.00 | $0.73 |
| 659E14000 REPAIR SEEDING AND MULCHING | 311 SY | $1.00 | $1.10 | $0.45 | $1.00 |
| 659E15000 INTER-SEEDING | 311 SY | $0.01 | $1.10 | $0.25 | $0.01 |
| 659E20000 COMMERCIAL FERTILIZER | 0.87 TON | $800 | $525 | $580 | $800 |
| 659E31000 LIME | 1.29 ACRE | $0.01 | $131 | $120 | $1.00 |
| 659E35000 WATER | 34 MGAL | $0.01 | $5.25 | $1.00 | $0.10 |
| 659E40000 MOWING | 14 MSF | $0.01 | $16.25 | $32.00 | $0.10 |
| 670E00700 DITCH EROSION PROTECTION | 542 SY | $2.00 | $2.50 | $3.00 | $2.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $1,200 | $1,159 | $3,500 | $1,125 |
| 605E13410 6" UNCLASSIFIED PIPE UNDERDRAINS WITH GEOTEXTILE F | 256 FT | $18.50 | $14.95 | $15.00 | $32.00 |
| 605E14020 6" BASE PIPE UNDERDRAINS WITH GEOTEXTILE FABRIC | 615 FT | $13.00 | $9.35 | $13.00 | $28.00 |
| 605E31100 AGGREGATE DRAINS | 464 FT | $11.00 | $11.41 | $16.00 | $30.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 68 FT | $31.00 | $18.60 | $17.00 | $70.00 |
| 611E04600 12" CONDUIT, TYPE C | 25 FT | $106 | $45.20 | $75.00 | $240 |
| 611E06400 15" CONDUIT, TYPE D | 42 FT | $90.00 | $57.70 | $30.00 | $240 |
| 611E98470 CATCH BASIN, NO. 2-2B | 1 EACH | $1,500 | $2,087 | $1,700 | $3,500 |
| 611E99574 MANHOLE, NO. 3 | 1 EACH | $3,200 | $2,477 | $2,100 | $4,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 2 EACH | $210 | $261 | $200 | $600 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 3,619 FT | $1.95 | $2.50 | $3.00 | $4.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, AS PER PLAN | 5,035 SY | $2.50 | $1.80 | $4.00 | $3.00 |
| 407E10000 TACK COAT | 1,366 GAL | $1.75 | $1.95 | $2.00 | $2.00 |
| 441E50701 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (35 CY | $260 | $247 | $215 | $320 |
| 617E10101 COMPACTED AGGREGATE, AS PER PLAN | 61 CY | $98.00 | $72.10 | $170 | $95.00 |
| 875E10000 LONGITUDINAL JOINT ADHESIVE | 511 LB | $3.00 | $1.55 | $2.00 | $7.99 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 140 FT | $5.95 | $9.80 | $6.00 | $8.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 237 FT | $6.90 | $11.25 | $7.00 | $9.00 |
| 630E08600 SIGN POST REFLECTOR | 1 EACH | $87.00 | $36.05 | $92.00 | $55.00 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 6 EACH | $54.35 | $139 | $57.00 | $45.00 |
| 630E80100 SIGN, FLAT SHEET | 205.1 SF | $16.50 | $17.50 | $17.00 | $15.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 31 EACH | $28.90 | $10.30 | $30.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 4 EACH | $56.15 | $46.35 | $59.00 | $65.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 25 EACH | $38.00 | $10.30 | $40.00 | $52.00 |
| 644E00500 STOP LINE | 82 FT | $9.50 | $7.75 | $10.00 | $6.00 |
| 644E00600 CROSSWALK LINE | 304 FT | $5.25 | $1.55 | $6.00 | $3.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 231 FT | $7.00 | $7.20 | $7.00 | $8.00 |
| 644E01300 LANE ARROW | 7 EACH | $125 | $134 | $135 | $125 |
| 646E10010 EDGE LINE, 6" | 1.04 MILE | $5,700 | $11,948 | $7,000 | $3,200 |
| 646E10200 CENTER LINE | 0.68 MILE | $6,102 | $14,214 | $10,560 | $5,100 |
| 646E10300 CHANNELIZING LINE, 8" | 625 FT | $1.76 | $3.25 | $2.25 | $1.90 |
| 625E25400 CONDUIT, 2", 725.04 | 79 FT | $30.45 | $31.35 | $15.00 | $30.45 |
| 625E25500 CONDUIT, 3", 725.04 | 47 FT | $42.75 | $44.05 | $29.00 | $42.75 |
| 625E25600 CONDUIT, 4", 725.04 | 7 FT | $64.50 | $66.45 | $60.00 | $64.50 |
| 625E29000 TRENCH | 117 FT | $7.95 | $8.20 | $15.00 | $7.95 |
| 625E30700 PULL BOX, 725.08, 18" | 4 EACH | $870 | $896 | $900 | $870 |
| 625E30706 PULL BOX, 725.08, 24" | 2 EACH | $1,065 | $1,097 | $1,100 | $1,065 |
| 625E32000 GROUND ROD | 6 EACH | $129 | $133 | $170 | $129 |
| 625E36000 PLASTIC CAUTION TAPE | 117 FT | $0.27 | $0.28 | $0.50 | $0.27 |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 7 EACH | $806 | $830 | $890 | $806 |
| 632E05087 VEHICULAR SIGNAL HEAD, (LED), 5-SECTION, 12" LENS, | 1 EACH | $1,292 | $1,331 | $1,400 | $1,292 |
| 632E20730 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN | 6 EACH | $549 | $565 | $500 | $549 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $12.75 | $13.15 | $50.00 | $12.75 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 6 EACH | $12.75 | $13.15 | $30.00 | $12.75 |
| 632E26000 PEDESTRIAN PUSHBUTTON | 2 EACH | $236 | $244 | $178 | $236 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 642 FT | $2.22 | $2.30 | $3.00 | $2.22 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 1,382 FT | $0.96 | $0.99 | $3.00 | $0.96 |
| 632E64020 PEDESTAL FOUNDATION | 1 EACH | $915 | $942 | $1,000 | $915 |
| 632E68200 POWER CABLE, 2 CONDUCTOR, NO. 6 AWG | 57 FT | $3.83 | $3.95 | $6.00 | $3.83 |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $2,580 | $2,657 | $2,500 | $2,580 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $447 | $460 | $650 | $447 |
| 632E89600 PEDESTAL, 8' | 1 EACH | $783 | $807 | $500 | $783 |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $3,768 | $3,881 | $3,150 | $3,768 |
| 632E90400 SIGNALIZATION, MISC.: MECHANICAL DAMPER FOR SUPPOR | 1 EACH | $356 | $367 | $700 | $356 |
| 633E65520 CABINET, TYPE 332 | 1 EACH | $7,790 | $8,024 | $9,500 | $7,790 |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 1 EACH | $1,680 | $1,730 | $1,800 | $1,680 |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 1 EACH | $570 | $587 | $600 | $570 |
| 633E74001 UNINTERRUPTIBLE POWER SUPPLY (UPS), AS PER PLAN | 1 EACH | $5,712 | $5,883 | $6,000 | $5,712 |
| 633E99000 CONTROLLER ITEM, MISC.: CONTROLLER UNIT, INSTALLAT | 1 EACH | $600 | $618 | $800 | $600 |
| 809E69000 ADVANCE RADAR DETECTION | 2 EACH | $6,665 | $6,865 | $8,100 | $6,665 |
| 410E12000 TRAFFIC COMPACTED SURFACE, TYPE A OR B | 36 CY | $103 | $141 | $75.00 | $80.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $70.00 | $66.95 | $45.00 | $65.00 |
| 614E11300 SPECIAL - WORK ZONE TRAFFIC SIGNAL | 1 EACH | $10,500 | $10,815 | $29,500 | $10,500 |
| 614E12420 DETOUR SIGNING | 1 LS | $3,950 | $1,875 | $4,500 | $4,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $190 | $435 | $200 | $250 |
| 614E21000 WORK ZONE CENTER LINE, CLASS I | 0.91 MILE | $3,990 | $3,723 | $4,200 | $4,500 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 1.77 MILE | $1,995 | $3,605 | $2,100 | $1,500 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 91 FT | $2.50 | $3.25 | $3.00 | $4.00 |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $6,500 | $6,276 | $18,500 | $2,500 |
| 616E10000 WATER | 8.39 MGAL | $20.00 | $5.25 | $2.00 | $50.00 |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $2,000 | $1,000 | $1,500 | $1,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 713 CY | $133 | $95k | 9% |
| 304E20000 AGGREGATE BASE | 1,062 CY | $75 | $80k | 8% |
| 442E20001 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 416 CY | $173 | $72k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $71,100 | $71k | 7% |
| 203E10000 EXCAVATION | 2,139 CY | $33 | $71k | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $70,170 | $70k | 7% |
| 441E50200 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 1 | 448 (219 CY | $177 | $39k | 4% |
| 832E30000 EROSION CONTROL | 33,000 EACH | $1 | $33k | 3% |
| 632E80502 SIGNAL SUPPORT, TYPE TC-81.21, DESIGN 11 | 3 EACH | $8,317 | $25k | 2% |
| 809E69100 STOP-BAR RADAR DETECTION | 4 EACH | $6,115 | $24k | 2% |