BEL-SR 147-22.93
BEL County · est $0.4M
Bid dateThursday, May 17—
BEL County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 43 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Dennison Bridge INC | R4Suburban Maintenance & Construction | R5Shelly & Sands INC | R6Bbr Drilling Company INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | — | $34.00 | $27.00 | $32.00 | $28.00 | $30.00 | $30.00 | 17% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $38,500 | $31,556 | $20,000 | $30,000 | $15,000 | $30,000 | 12% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 520 FT | $70.00 | $65.00 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Dennison Bridge INC | R4Suburban Maintenance & Construction | R5Shelly & Sands INC | R6Bbr Drilling Company INC |
|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,500 | $3,500 | $5,000 | $15,000 | $5,000 | $500 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 129 FT | $23.00 | $14.00 | $20.00 | $25.00 | $12.00 | $2.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $585 | $212 | $100 | $150 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $82.00 |
| $110 |
| $93.00 |
| $150 |
| 11% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 781 FT | $35.00 | $33.00 | $65.00 | $50.00 | $64.00 | $125 | 9% |
| 511E81300 CONCRETE, MISC.: 8"x24"x45" PRECAST CONCRETE LAGGI | 148 EACH | $148 | $145 | $180 | $200 | $250 | $200 | 7% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 191 SY | $95.00 | $69.00 | $135 | $65.00 | $110 | $40.00 | 6% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 347 CY | $49.00 | $27.00 | $60.00 | $15.00 | $90.00 | $20.00 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 60 CY | $220 | $315 | $300 | $300 | $249 | $275 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $11,750 | $27,000 | $12,000 | $43,000 | $15,000 | $40,000 | 4% |
| 304E20000 AGGREGATE BASE | 97 CY | $100 | $81.00 | $115 | $65.00 | $75.00 | $70.00 | 3% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 212.5 FT | $43.00 | $34.00 | $32.00 | $19.50 | $31.60 | $28.00 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 480 FT | $19.00 | $22.00 | $22.00 | $29.00 | $20.00 | $35.00 | 3% |
| 611E06100 15" CONDUIT, TYPE C | 83 FT | $106 | $97.00 | $140 | $95.00 | $80.00 | $70.00 | 3% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 31 CY | $268 | $339 | $300 | $300 | $550 | $250 | 3% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (18 CY | $429 | $410 | $400 | $390 | $369 | $400 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 69 CY | $101 | $260 | $140 | $65.00 | $135 | $70.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $6,500 | $2,500 | $5,250 | $10,000 | $3,550 | $1,000 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 14 CY | $441 | $473 | $500 | $450 | $475 | $400 | 2% |
| 202E23010 PAVEMENT REMOVED, ASPHALT | 369 SY | $14.00 | $12.00 | $18.00 | $10.00 | $10.00 | $35.00 | 2% |
| 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), 24" | 2 EACH | $2,500 | $2,582 | $2,500 | $2,000 | $2,500 | $3,500 | 2% |
| $250 |
| $100 |
| 202E75000 FENCE REMOVED | 324 FT | $3.00 | $3.00 | $3.00 | $2.50 | $3.00 | $1.00 |
| 203E10000 EXCAVATION | 141 CY | $27.00 | $24.00 | $20.00 | $15.00 | $25.00 | $20.00 |
| 203E20000 EMBANKMENT | 169 CY | $11.00 | $7.50 | $18.00 | $15.00 | $15.00 | $70.00 |
| 204E10000 SUBGRADE COMPACTION | 463 SY | $4.00 | $3.00 | $3.00 | $5.00 | $4.00 | $5.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,500 | $1,344 | $1,300 | $800 | $1,280 | $2,200 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,000 | $908 | $900 | $750 | $865 | $2,200 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 3 CY | $170 | $411 | $250 | $75.00 | $425 | $150 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $225 | $100 | $50.00 | $100 | $88.00 | $500 |
| 659E00300 TOPSOIL | 116 CY | $42.00 | $53.00 | $25.00 | $50.00 | $30.00 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 1,046 SY | $4.00 | $1.50 | $4.00 | $2.66 | $2.00 | $0.50 |
| 659E14000 REPAIR SEEDING AND MULCHING | 52 SY | $4.00 | $3.00 | $4.00 | $1.00 | $0.65 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.15 TON | $1,600 | $2,772 | $1,000 | $625 | $655 | $1,000 |
| 659E31000 LIME | 0.22 ACRE | $2,800 | $735 | $100 | $85.00 | $150 | $1,000 |
| 659E35000 WATER | 10 MGAL | $112 | $32.00 | $5.00 | $1.00 | $1.00 | $1.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E05900 15" CONDUIT, TYPE B | 41 FT | $105 | $168 | $220 | $95.00 | $130 | $80.00 |
| 611E98470 CATCH BASIN, NO. 2-2B | 2 EACH | $1,900 | $2,005 | $2,500 | $2,000 | $2,700 | $1,000 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 737 FT | $3.00 | $6.00 | $3.00 | $2.50 | $1.50 | $5.00 |
| 407E10000 TACK COAT | 23 GAL | $2.00 | $2.50 | $4.00 | $2.00 | $2.00 | $7.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 4 GAL | $89.00 | $90.00 | $100 | $85.00 | $80.00 | $7.00 |
| 441E50401 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448) | — | $1,400 | $578 | $500 | $550 | $800 | $500 |
| 621E00100 RPM | 7 EACH | $196 | $223 | $400 | $725 | $175 | $250 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 7 EACH | $18.00 | $12.00 | $50.00 | $50.00 | $20.00 | $20.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 4 EACH | $12.00 | $8.00 | $10.00 | $33.25 | $8.50 | $20.00 |
| 646E10010 EDGE LINE, 6" | 0.16 MILE | $28,000 | $51,430 | $70,000 | $10,000 | $35,000 | $10,000 |
| 646E10200 CENTER LINE | 0.05 MILE | $29,000 | $52,479 | $70,000 | $10,000 | $35,000 | $15,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 30 HOUR | $84.00 | $69.00 | $75.00 | $65.00 | $70.00 | $100 |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 2 EACH | $800 | $3,674 | $2,500 | $4,000 | $15,320 | $3,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $350 | $495 | $120 | $300 | $250 | $550 |
| 614E13312 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 10 EACH | $38.00 | $35.00 | $15.00 | $33.25 | $10.00 | $20.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $38.00 | $35.00 | $25.00 | $33.25 | $15.00 | $20.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.04 MILE | $10,000 | $9,656 | $13,000 | $9,200 | $9,200 | $10,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.18 MILE | $11,000 | $11,178 | $11,000 | $10,650 | $10,650 | $8,500 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 20 FT | $15.00 | $14.00 | $15.00 | $12.75 | $12.75 | $3.00 |
| 616E10000 WATER | 10 MGAL | $1.00 | $21.00 | $25.00 | $1.00 | $20.00 | $2.00 |
| 511E71100 CONCRETE, MISC.: CAST-IN-PLACE CONCRETE LAGGING | 1 CY | $3,235 | $2,147 | $2,500 | $2,000 | $3,000 | $1,000 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 198 FT | $4.00 | $6.00 | $5.00 | $10.00 | $3.50 | $3.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 6 FT | $20.00 | $87.00 | $20.00 | $10.00 | $35.00 | $3.00 |
| 619E16000 FIELD OFFICE, TYPE A | 3 MNTH | $500 | $1,418 | $500 | $500 | $2,900 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $4,724 | $3,000 | $7,500 | $7,500 | $2,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | — | $34 | $53k | 14% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $38,500 | $39k | 10% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 520 FT | $70 | $36k | 9% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 781 FT | $35 | $27k | 7% |
| 511E81300 CONCRETE, MISC.: 8"x24"x45" PRECAST CONCRETE LAGGI | 148 EACH | $148 | $22k | 6% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 191 SY | $95 | $18k | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 347 CY | $49 | $17k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 60 CY | $220 | $13k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $11,750 | $12k | 3% |
| 304E20000 AGGREGATE BASE | 97 CY | $100 | $10k | 2% |