ATB-/TRU SIGN FY2019 (Systematic)
ATB County · est $0.5M
Bid dateThursday, September 13—
ATB County · est $0.5M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 9 more items below.
| Item | Quantity | R1Trafftech INC | R2Cleveland Barricading Systems LLC | R3Lake Erie Construction Company | R4M P Dory CO | R521st Century Concrete Construction | % of bid |
|---|---|---|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 22,467 FT | $7.00 | $7.19 | $8.00 | $7.50 | $7.00 | 32% |
| 630E80100 SIGN, FLAT SHEET | 12,817 SF | $10.50 | $8.50 | $10.50 | $12.75 | $12.50 | 28% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,971 EACH | $30.00 | $18.10 | $10.00 | $8.50 | $18.50 | 12% |
| Item | Quantity | R1Trafftech INC | R2Cleveland Barricading Systems LLC | R3Lake Erie Construction Company | R4M P Dory CO | R521st Century Concrete Construction |
|---|---|---|---|---|---|---|
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 630E03101 GROUND MOUNTED SUPPORT, NO. 3 POST, AS PER PLAN | 32 FT | $8.00 | $7.65 | $10.00 | $9.50 | $7.40 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 85 FT | $9.00 | $9.25 | $12.00 | $12.50 | $17.50 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2,395 EACH |
| $15.00 |
| $11.90 |
| $10.00 |
| $8.00 |
| $19.40 |
| 7% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 1,037 SF | $15.00 | $24.25 | $17.00 | $18.00 | $19.00 | 3% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 12 EACH | $750 | $1,150 | $820 | $500 | $920 | 2% |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 45 EACH | $185 | $115 | $375 | $275 | $255 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $12,000 | $4,350 | $7,500 | $17,600 | 2% |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 26 EACH | $285 | $110 | $300 | $275 | $330 | 2% |
| 630E08600 SIGN POST REFLECTOR (RED) | 369 EACH | $20.00 | $27.00 | $34.50 | $28.00 | $37.00 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 6 MNTH | $1,200 | $1,975 | $425 | $500 | $2,300 | 1% |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 143 EACH | $45.00 | $85.00 | $95.00 | $80.00 | $225 | 1% |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 1,002 FT | $6.00 | $8.95 | $7.00 | $7.00 | $6.15 | 1% |
| 630E08600 SIGN POST REFLECTOR( YELLOW) | 237 EACH | $20.00 | $27.00 | $34.50 | $28.00 | $37.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $4,500 | $2,900 | $2,500 | $3,500 | $13,000 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $4,000 | $26,100 | $4,800 | $20,000 | $25,000 | 1% |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 68 EACH | $50.00 | $53.00 | $120 | $200 | $350 | 1% |
| 630E09000 BREAKAWAY STRUCTURAL BEAM CONNECTION | 12 EACH | $250 | $220 | $265 | $175 | $360 | 1% |
| 630E81200 SIGN ERECTED, EXTRUSHEET | 322 SF | $8.00 | $2.45 | $9.75 | $18.00 | $11.20 | 1% |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 39 EACH | $65.00 | $17.75 | $45.00 | $35.00 | $145 | 1% |
| 163 FT |
| $15.00 |
| $16.50 |
| $22.00 |
| $13.00 |
| $22.00 |
| 630E08004 ONE WAY SUPPORT, NO. 3 POST | 256 FT | $8.00 | $8.95 | $10.00 | $9.50 | $17.20 |
| 630E75000 SIGN ATTACHMENT ASSEMBLY | 8 EACH | $125 | $330 | $620 | $500 | $720 |
| 630E86102 REMOVAL OF GROUND MOUNTED STRUCTURAL BEAM SUPPORT | 6 EACH | $150 | $370 | $245 | $300 | $387 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 144 EACH | $15.00 | $50.00 | $25.00 | $12.00 | $72.00 |
| 624E10000 MOBILIZATION | 1 LS | $2,000 | $12,500 | $26,950 | $20,000 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 22,467 FT | $7 | $157k | 32% |
| 630E80100 SIGN, FLAT SHEET | 12,817 SF | $10.5 | $135k | 27% |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 1,971 EACH | $30 | $59k | 12% |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2,395 EACH | $15 | $36k | 7% |
| 630E80200 SIGN, GROUND MOUNTED EXTRUSHEET | 1,037 SF | $15 | $16k | 3% |
| 630E84500 GROUND MOUNTED STRUCTURAL BEAM SUPPORT FOUNDATION | 12 EACH | $750 | $9k | 2% |
| 630E79000 SIGN HANGER ASSEMBLY, SPAN WIRE | 45 EACH | $185 | $8k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $8k | 2% |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 26 EACH | $285 | $7k | 1% |
| 630E08600 SIGN POST REFLECTOR (RED) | 369 EACH | $20 | $7k | 1% |