How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
$685
$800
2%
606E18500GUARDRAIL POST, 9 FEET
753 EACH
$10.50
$15.00
$14.00
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM
1 LS
$7,400
$5,960
$7,500
1%
606E35140BRIDGE TERMINAL ASSEMBLY, TYPE 4
12 EACH
$560
$645
$300
1%
626E00102BARRIER REFLECTOR, TYPE 1BI
1,095 EACH
$6.00
$6.00
$5.00
1%
614E11000MAINTAINING TRAFFIC
1 LS
$6,000
$12,400
$10,000
1%
624E10000MOBILIZATION
1 LS
$6,000
$9,000
$5,000
1%
202E38101GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN
2,000 FT
$1.70
$2.00
$2.50
0%
606E50000SPECIAL - RESHAPING BERM
44,375 FT
$0.05
$0.16
$0.15
0%
606E25550ANCHOR ASSEMBLY, MGS TYPE A
85 EACH
$970
$82k
8%
202E38000GUARDRAIL REMOVED
42,375 FT
$1.2
$51k
5%
202E42206ANCHOR ASSEMBLY REMOVED
234 EACH
$165
$39k
4%
606E26050ANCHOR ASSEMBLY, MGS TYPE B
14 EACH
$1,600
$22k
2%
606E26550ANCHOR ASSEMBLY, MGS TYPE T
27 EACH
$770
$21k
2%
606E18500GUARDRAIL POST, 9 FEET
753 EACH
$10.5
$8k
1%
103E05000PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM