ROS-CR 1/VAR GR FY2019
ROS County · est $0.3M
Bid dateThursday, October 11—
ROS County · est $0.3M
Bid form · ODOT
| Item | Qty |
|---|
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 1 more items below.
| Item | Quantity | R1Pdk Construction INC | R2Lake Erie Construction Company | R3M P Dory CO | % of bid |
|---|---|---|---|---|---|
| 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS | 5,425 FT | $16.75 | $17.40 | $17.50 | 34% |
| 517E72306 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 462.5 FT | $74.50 | $83.80 | $90.00 | 13% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 462.5 FT | $66.20 | $82.40 | $80.00 | 12% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,031.25 FT | $15.00 | $15.20 | $15.50 | 12% |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 42 EACH | $625 | $750 | $750 | 10% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 7,230.75 FT | $1.60 | $2.00 | $2.50 | 4% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 12 EACH | $585 |
| Item | Quantity | R1Pdk Construction INC | R2Lake Erie Construction Company | R3M P Dory CO |
|---|---|---|---|---|
| 690E50000 SPECIAL - MAILBOX SUPPORT | 1 EACH | $100 | $115 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $765 |
| $650 |
| 3% |
| 606E13041 GUARDRAIL, NESTED TYPE 5 WITH TUBULAR BACKUP, AS P | 75 FT | $82.50 | $106 | $100 | 2% |
| 202E38601 BRIDGE RAILING REMOVED FOR STORAGE, AS PER PLAN | 487.5 FT | $7.90 | $4.00 | $7.00 | 1% |
| 517E72205 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 31.25 FT | $116 | $74.00 | $114 | 1% |
| 606E17290 GUARDRAIL, TYPE 5, LONG-SPAN | 125 FT | $23.00 | $21.20 | $27.50 | 1% |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 3 EACH | $950 | $1,125 | $1,100 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,850 | $2,780 | $2,500 | 1% |
| 832E30000 EROSION CONTROL | 2,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $1,505 | $1,850 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $2,000 | $2,255 | $1,750 | 1% |
| 606E17291 GUARDRAIL, TYPE 5, LONG-SPAN, AS PER PLAN | 62.5 FT | $26.75 | $24.60 | $30.00 | 1% |
| 209E15001 RESHAPING UNDER GUARDRAIL, AS PER PLAN | 81 STA | $20.00 | $20.00 | $45.00 | 1% |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 140 EACH | $6.00 | $6.30 | $7.00 | 0% |
| 659E10000 SEEDING AND MULCHING | 267 SY | $0.50 | $2.00 | $1.00 | 0% |
| Unit price |
|---|
| Extended |
|---|
| % |
|---|
| 606E13030 GUARDRAIL, TYPE 5, USING 9 FOOT POSTS | 5,425 FT | $16.75 | $91k | 34% |
| 517E72306 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 462.5 FT | $74.5 | $34k | 13% |
| 517E75600 DEEP BEAM BRIDGE RETROFIT RAILING | 462.5 FT | $66.2 | $31k | 12% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,031.25 FT | $15 | $30k | 12% |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 42 EACH | $625 | $26k | 10% |
| 202E38101 GUARDRAIL REMOVED FOR STORAGE, AS PER PLAN | 7,230.75 FT | $1.6 | $12k | 4% |
| 606E35140 BRIDGE TERMINAL ASSEMBLY, TYPE 4 | 12 EACH | $585 | $7k | 3% |
| 606E13041 GUARDRAIL, NESTED TYPE 5 WITH TUBULAR BACKUP, AS P | 75 FT | $82.5 | $6k | 2% |
| 202E38601 BRIDGE RAILING REMOVED FOR STORAGE, AS PER PLAN | 487.5 FT | $7.9 | $4k | 1% |
| 517E72205 RAILING (DEEP BEAM RAIL WITH STEEL TUBULAR BACKUP | 31.25 FT | $116 | $4k | 1% |