CUY-SRTS FY2019 Cleveland Hts
CUY County · est $0.1M
Bid dateThursday, October 25—
CUY County · est $0.1M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 4.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 29 more items below.
| Item | Quantity | R1Greenwich Electric INC | R2Miller Cable Company | R3Perram Electric INC | R4Trafftech INC | R5Terrace Construction CO INC | R6U S Utility Contractor Company | % of bid |
|---|---|---|---|---|---|---|---|---|
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $6,250 | $6,885 | $7,135 | $7,500 | $7,097 | $7,123 | 13% |
| AA2 633E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 1 EACH | $12,300 | $11,750 | $12,235 | $13,000 | $13,200 | $14,020 | 13% |
| 632E75043 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 4 POLE, WITH | 1 EACH | $10,400 | $8,650 |
| Item | Quantity | R1Greenwich Electric INC | R2Miller Cable Company | R3Perram Electric INC | R4Trafftech INC | R5Terrace Construction CO INC | R6U S Utility Contractor Company |
|---|---|---|---|---|---|---|---|
| 202E30000 WALK REMOVED | 100 SF | $7.00 | $10.00 | $10.00 | $3.00 | $2.90 | $24.40 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 25.1 FT | $10.00 | $8.00 | $14.85 | $9.00 | $8.25 | $9.18 |
| 630E79500 SIGN SUPPORT ASSEMBLY, POLE MOUNTED | 2 EACH | $82.00 | $275 | $205 | $75.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $10,245 |
| $12,200 |
| $9,875 |
| $10,506 |
| 11% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $4,300 | $5,300 | $4,645 | $4,800 | $4,200 | $2,978 | 9% |
| 632E75013 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 3 POLE, WITH | 1 EACH | $8,400 | $7,500 | $8,230 | $9,200 | $8,865 | $9,265 | 9% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 173 FT | $48.00 | $53.00 | $56.15 | $65.00 | $83.00 | $43.00 | 9% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $660 | $900 | $672 | $900 | $723 | $889 | 5% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 250 FT | $16.50 | $11.00 | $13.05 | $15.00 | $12.50 | $15.30 | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,200 | $555 | $2,088 | $2,500 | $1,110 | $2,100 | 3% |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH | $1,000 | $850 | $740 | $700 | $696 | $588 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $3,000 | $4,000 | $4,000 | $2,500 | $3,135 | $13,250 | 3% |
| 633E67100 CABINET FOUNDATION | 1 EACH | $2,600 | $2,400 | $2,755 | $2,500 | $1,297 | $1,430 | 3% |
| 632E20731 PEDESTRIAN SIGNAL HEAD (LED), TYPE D2, COUNTDOWN, | 6 EACH | $415 | $570 | $390 | $525 | $1,250 | $716 | 3% |
| 625E30510 PULL BOX, 725.06, SIZE 4 | 3 EACH | $773 | $850 | $925 | $700 | $461 | $745 | 2% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $2,000 | $2,250 | $5,000 | $2,500 | $5,260 | $11,575 | 2% |
| 632E89901 PEDESTAL, 8', TRANSFORMER BASE, AS PER PLAN | 3 EACH | $665 | $700 | $800 | $950 | $643 | $935 | 2% |
| 630E79100 SIGN HANGER ASSEMBLY, MAST ARM | 6 EACH | $315 | $300 | $355 | $285 | $772 | $291 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN | 1 EACH | $1,880 | $900 | $1,375 | $2,800 | $1,660 | $2,348 | 2% |
| 632E90101 REMOVAL OF TRAFFIC SIGNAL INSTALLATION, AS PER PLA | 1 EACH | $1,800 | $2,100 | $3,420 | $2,500 | $2,418 | $4,173 | 2% |
| 608E10000 4" CONCRETE WALK | 100 SF | $16.00 | $25.00 | $25.00 | $35.00 | $8.50 | $30.60 | 2% |
| $81.00 |
| $76.50 |
| 630E80100 SIGN, FLAT SHEET | 75.7 SF | $20.00 | $18.00 | $21.30 | $18.00 | $19.00 | $18.36 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 4 EACH | $27.00 | $40.00 | $78.00 | $25.00 | $57.00 | $25.50 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $33.00 | $40.00 | $78.00 | $30.00 | $61.00 | $30.60 |
| 630E87400 REMOVAL OF OVERHEAD MOUNTED SIGN AND DISPOSAL | 2 EACH | $55.00 | $40.00 | $78.00 | $50.00 | $230 | $51.00 |
| 630E87500 REMOVAL OF POLE MOUNTED SIGN AND DISPOSAL | 8 EACH | $16.50 | $40.00 | $78.00 | $15.00 | $42.00 | $15.30 |
| 644E00500 STOP LINE | 12 FT | $9.00 | $12.00 | $17.75 | $8.00 | $13.00 | $8.16 |
| 644E00600 CROSSWALK LINE | 176 FT | $3.30 | $20.00 | $15.75 | $3.00 | $22.50 | $3.06 |
| 625E25400 CONDUIT, 2", 725.04 | 42 FT | $15.00 | $20.00 | $13.00 | $15.00 | $32.00 | $14.63 |
| 625E25500 CONDUIT, 3", 725.04 | 28 FT | $27.00 | $26.00 | $35.00 | $18.00 | $42.00 | $24.25 |
| 625E25600 CONDUIT, 4", 725.04 | 22 FT | $42.00 | $32.00 | $33.00 | $22.00 | $54.00 | $31.00 |
| 625E29000 TRENCH | 81 FT | $12.00 | $18.00 | $21.65 | $12.00 | $8.50 | $9.06 |
| 625E30520 PULL BOX, 725.06, SIZE 7 | 1 EACH | $890 | $925 | $1,025 | $950 | $546 | $854 |
| 625E32000 GROUND ROD | 6 EACH | $190 | $265 | $255 | $155 | $205 | $202 |
| 625E36000 PLASTIC CAUTION TAPE | 81 FT | $0.45 | $0.30 | $0.60 | $1.00 | $0.30 | $0.56 |
| 632E25000 COVERING OF VEHICULAR SIGNAL HEAD | 8 EACH | $20.00 | $40.00 | $10.00 | $15.00 | $50.00 | $33.45 |
| 632E25010 COVERING OF PEDESTRIAN SIGNAL HEAD | 6 EACH | $10.00 | $30.00 | $10.00 | $40.00 | $9.75 | $33.45 |
| 632E26001 PEDESTRIAN PUSHBUTTON, AS PER PLAN | 2 EACH | $400 | $376 | $405 | $175 | $344 | $524 |
| 632E40500 SIGNAL CABLE, 5 CONDUCTOR, NO. 14 AWG | 626 FT | $1.75 | $2.20 | $1.75 | $1.85 | $2.20 | $2.22 |
| 632E40700 SIGNAL CABLE, 7 CONDUCTOR, NO. 14 AWG | 688 FT | $1.95 | $2.30 | $2.05 | $2.25 | $2.40 | $2.54 |
| 632E65200 LOOP DETECTOR LEAD-IN CABLE | 161 FT | $1.45 | $1.30 | $2.25 | $1.55 | $1.80 | $1.76 |
| 632E68300 POWER CABLE, 3 CONDUCTOR, NO. 6 AWG | 192 FT | $4.65 | $4.00 | $3.15 | $4.00 | $3.70 | $3.50 |
| 632E70400 CONDUIT RISER, 2" DIAMETER | 1 EACH | $475 | $400 | $510 | $350 | $385 | $455 |
| 632E90400 SIGNALIZATION, MISC.: TEST HOLE PERFORMED | 2 EACH | $200 | $150 | $310 | $600 | $537 | $717 |
| 633E99000 CONTROLLER ITEM, MISC.: GENERATOR POWER PANEL | 1 EACH | $200 | $300 | $200 | $750 | $236 | $775 |
| 614E11111 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 16 HOUR | $60.00 | $60.00 | $65.00 | $65.00 | $65.00 | $75.00 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,000 | $400 | $250 | $2,500 | $2,150 | $2,788 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E69101 STOP LINE RADAR DETECTION, AS PER PLAN | 2 EACH | $6,250 | $13k | 11% |
| AA2 633E01551 CONTROLLER UNIT, TYPE TS2/A2, WITH CABINET, TYPE T | 1 EACH | $12,300 | $12k | 11% |
| 632E75043 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 4 POLE, WITH | 1 EACH | $10,400 | $10k | 9% |
| 632E64010 SIGNAL SUPPORT FOUNDATION | 2 EACH | $4,300 | $9k | 8% |
| 632E75013 SIGNAL SUPPORT, TYPE TC-81.21 DESIGN 3 POLE, WITH | 1 EACH | $8,400 | $8k | 7% |
| 625E25902 CONDUIT, JACKED OR DRILLED, 725.04, 4" | 173 FT | $48 | $8k | 7% |
| 632E05007 VEHICULAR SIGNAL HEAD, (LED), 3-SECTION, 12" LENS, | 8 EACH | $660 | $5k | 5% |
| 644E30000 REMOVAL OF PAVEMENT MARKING | 250 FT | $16.5 | $4k | 4% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,200 | $3k | 3% |
| 632E64020 PEDESTAL FOUNDATION | 3 EACH | $1,000 | $3k | 3% |