D06-STW CCTV FY18
D06 County · est $3.1M
Bid dateThursday, May 17—
D06 County · est $3.1M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 6.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1Asplundh Construction LLC | R2Miller Cable Company | R3J Ranck Electric INC | % of bid |
|---|---|---|---|---|---|
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 36 EACH | $32,000 | $31,125 | $49,000 | 40% |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 36 EACH | $9,600 | $6,500 | $8,100 | 12% |
| 809E65000 ITS CABINET - GROUND MOUNTED | 36 EACH | $6,000 | $6,000 | $7,250 | 7% |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 60 EACH | $2,450 | $2,500 | $3,200 | 5% |
| 625E29010 TRENCH, 30" DEEP | 18,630 FT | $7.35 | $14.50 | $4.00 |
| Item | Quantity | R1Asplundh Construction LLC | R2Miller Cable Company | R3J Ranck Electric INC |
|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,500 | $32,000 | $5,000 |
| 606E15050 GUARDRAIL, TYPE MGS | 600 FT | $32.00 | $24.00 | $24.00 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 3 EACH | $1,800 | $2,400 | $2,375 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 1 EACH | $1,800 | $900 | $1,000 |
| 659E00510 SEEDING AND MULCHING, CLASS 2 | 2,770 SY | $3.00 | $2.50 | $7.00 |
| 659E20000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 5% |
| 625E25750 CONDUIT, 4", MULTICELL, 725.20 , EPC-40, AS PER PL | 8,715 FT | $15.00 | $14.00 | $11.25 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100,000 | $100,000 | 3% |
| 625E25408 CONDUIT, 2", 725.051 | 16,660 FT | $5.25 | $6.00 | $3.75 | 3% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 36 EACH | $2,200 | $3,500 | $3,100 | 3% |
| 625E30700 PULL BOX, 725.08, 18" | 110 EACH | $680 | $800 | $1,100 | 3% |
| 625E25908 CONDUIT, JACKED OR DRILLED, 725.052, SHEDULE 80 | 1,860 FT | $35.00 | $16.50 | $29.00 | 2% |
| 632E70001 POWER SERVICE, AS PER PLAN A | 14 EACH | $4,300 | $1,900 | $4,000 | 2% |
| 625E22990 NO. 6 AWG 600 VOLT DISTRIBUTION CABLE | 35,590 FT | $1.65 | $1.60 | $1.75 | 2% |
| 625E22900 NO. 1/0 AWG 2400 VOLT DISTRIBUTION CABLE | 10,635 FT | $5.00 | $5.00 | $5.75 | 2% |
| 625E98000 LIGHTING, MISC.:STEP-DOWN TRANSFORMER AND SUPPORT | 9 EACH | $4,900 | $4,400 | $7,000 | 2% |
| 633E67201 CONTROLLER WORK PAD, AS PER PLAN | 36 EACH | $1,000 | $1,600 | $2,675 | 1% |
| 625E25740 CONDUIT, MULTICELL, 4", 725.20, SCHEDULE 80, JACKE | 560 FT | $55.00 | $50.00 | $45.00 | 1% |
| 625E32001 GROUND ROD, AS PER PLAN | 146 EACH | $200 | $165 | $475 | 1% |
| 804E34013 FIBER TERMINATION PANEL, 12 FIBER, AS PER PLAN | 17 EACH | $1,700 | $2,500 | $1,775 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $25,100 | $29,250 | $152,000 | 1% |
| 0.39 TON |
| $400 |
| $500 |
| $1,600 |
| 659E35000 WATER | 15 MGAL | $25.00 | $1.00 | $65.00 |
| 832E30000 EROSION CONTROL | 10,000 EACH | $1.00 | $1.00 | $1.00 |
| 625E00470 CONNECTION, UNFUSED BOLTED | 3 EACH | $125 | $125 | $165 |
| 625E23000 NO. 4 AWG 600 VOLT DISTRIBUTION CABLE | 10,100 FT | $2.00 | $2.30 | $2.50 |
| 625E23100 NO. 2 AWG 600 VOLT DISTRIBUTION CABLE | 7,890 FT | $2.60 | $2.80 | $3.25 |
| 625E36000 PLASTIC CAUTION TAPE | 18,630 FT | $0.20 | $0.75 | $0.50 |
| 632E70001 POWER SERVICE, AS PER PLAN B | 7 EACH | $2,600 | $2,850 | $1,500 |
| 632E70001 POWER SERVICE, AS PER PLAN C | 1 EACH | $2,600 | $1,500 | $1,500 |
| 632E70001 POWER SERVICE, AS PER PLAN D | 5 EACH | $4,800 | $12,000 | $7,800 |
| 632E70001 POWER SERVICE, AS PER PLAN E | 3 EACH | $2,500 | $700 | $2,200 |
| 632E70001 POWER SERVICE, AS PER PLAN F | 2 EACH | $2,750 | $5,200 | $5,300 |
| 804E15010 FIBER OPTIC CABLE, 24 FIBER | 13,635 FT | $1.70 | $6.00 | $4.25 |
| 809E64550 ETHERNET CABLE, OUTDOOR-RATED | 1,955 FT | $2.00 | $4.00 | $1.25 |
| 809E65020 ITS CABINET - POWER DISTRIBUTION CABINET (PDC) | 1 EACH | $4,200 | $3,230 | $5,775 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 50 HOUR | $70.00 | $90.00 | $65.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $11,789 | $25,682 | $100,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $20,250 | $19,650 | $50,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 809E61000 CCTV CONCRETE POLE WITH LOWERING UNIT, 70 FEET | 36 EACH | $32,000 | $1.15M | 37% |
| 809E60000 CCTV IP-CAMERA SYSTEM, DOME-TYPE | 36 EACH | $9,600 | $346k | 11% |
| 809E65000 ITS CABINET - GROUND MOUNTED | 36 EACH | $6,000 | $216k | 7% |
| 625E30711 PULL BOX, 725.08, 32", AS PER PLAN | 60 EACH | $2,450 | $147k | 5% |
| 625E29010 TRENCH, 30" DEEP | 18,630 FT | $7.35 | $137k | 4% |
| 625E25750 CONDUIT, 4", MULTICELL, 725.20 , EPC-40, AS PER PL | 8,715 FT | $15 | $131k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 625E25408 CONDUIT, 2", 725.051 | 16,660 FT | $5.25 | $87k | 3% |
| 633E67101 CABINET FOUNDATION, AS PER PLAN | 36 EACH | $2,200 | $79k | 3% |
| 625E30700 PULL BOX, 725.08, 18" | 110 EACH | $680 | $75k | 2% |