BEL-SR 647-06.63
BEL County · est $0.1M
Bid dateThursday, January 11—
BEL County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Rock Forge Bridge Company, LLC | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4Alan Stone CO INC | R5S E T INC | % of bid |
|---|---|---|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $37,850 | $41,600 | $35,000 | $35,000 | $17,500 | 28% |
| 624E10000 MOBILIZATION | 1 LS | $16,984 | $4,000 | $4,000 | $18,500 | $25,000 | 13% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 144 FT | $64.00 | $65.00 | $75.00 | $75.00 | $150 | 7% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 71 SY | $121 | $115 | $180 | $170 | $125 | 6% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 82 CY | $91.93 | $50.00 | $90.00 | $29.00 | $40.00 | 6% |
| 511E81300 |
| Item | Quantity | R1Rock Forge Bridge Company, LLC | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4Alan Stone CO INC | R5S E T INC |
|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $836 | $2,500 | $5,000 | $4,500 | $19,500 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 10 FT | $44.56 | $30.00 | $27.00 | $47.00 | $15.00 |
| 202E38000 GUARDRAIL REMOVED | 100 FT | $4.27 | $8.00 | $5.00 | $4.70 | $7.00 |
| 202E98000 REMOVAL MISC.: PILING REMOVED | 1 LS | $427 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 20 EACH |
| $326 |
| $450 |
| $275 |
| $266 |
| $225 |
| 5% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 7 CY | $917 | $700 | $400 | $560 | $325 | 5% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 200 FT | $28.24 | $45.00 | $35.00 | $35.00 | $32.00 | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 9 CY | $578 | $325 | $788 | $551 | $650 | 4% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 75 FT | $65.98 | $50.00 | $38.60 | $41.00 | $45.00 | 4% |
| 511E71100 CONCRETE, MISC.: CAST-IN-PLACE CONCRETE LAGGING | 2 CY | $2,058 | $1,500 | $3,632 | $4,339 | $850 | 3% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 56 FT | $65.00 | $135 | $133 | $100 | $200 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 22 CY | $130 | $250 | $125 | $120 | $85.00 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (4 CY | $688 | $475 | $898 | $656 | $725 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,441 | $1,000 | $4,500 | $3,000 | $10,500 | 2% |
| 202E23000 PAVEMENT REMOVED | 69 SY | $34.40 | $35.00 | $20.00 | $48.00 | $40.00 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 3 CY | $770 | $550 | $988 | $735 | $800 | 2% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,485 | $3,500 | $1,495 | $1,606 | $1,800 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,437 | $2,500 | $1,678 | $2,000 | $5,000 | 1% |
| 611E10400 24" CONDUIT, TYPE B | 10 FT | $136 | $350 | $185 | $300 | $200 | 1% |
| $2,500 |
| $2,500 |
| $1,409 |
| $7,500 |
| 203E20000 EMBANKMENT | 11 CY | $20.96 | $24.00 | $40.00 | $15.00 | $40.00 |
| 204E10000 SUBGRADE COMPACTION | 87 SY | $2.98 | $10.00 | $5.00 | $2.35 | $6.00 |
| 601E32204 ROCK CHANNEL PROTECTION, TYPE C WITH GEOTEXTILE FA | 3 CY | $374 | $135 | $250 | $591 | $175 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 92 SY | $5.63 | $12.00 | $11.00 | $20.00 | $7.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 99 FT | $2.75 | $3.50 | $2.50 | $39.00 | $15.00 |
| 304E20000 AGGREGATE BASE | 14 CY | $96.39 | $150 | $125 | $124 | $75.00 |
| 407E10000 TACK COAT | 4 GAL | $2.75 | $50.00 | $2.00 | $2.65 | $3.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 3 EACH | $55.00 | $30.00 | $12.00 | $13.00 | $16.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.02 MILE | $28,804 | $42,000 | $26,185 | $108,480 | $75,000 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 42 FT | $7.62 | $15.00 | $5.00 | $16.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 4 FT | $43.02 | $15.00 | $25.00 | $100 | $18.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $37,850 | $38k | 27% |
| 624E10000 MOBILIZATION | 1 LS | $16,984 | $17k | 12% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 144 FT | $64 | $9k | 6% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 71 SY | $121 | $9k | 6% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 82 CY | $91.93 | $8k | 5% |
| 511E81300 CONCRETE, MISC.:8"X24"X69" PRECAST CONCRETE LAGGIN | 20 EACH | $326.18 | $7k | 5% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 7 CY | $917.47 | $6k | 5% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 200 FT | $28.24 | $6k | 4% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 9 CY | $577.5 | $5k | 4% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 75 FT | $65.98 | $5k | 3% |