BEL-SR 9-11.24
BEL County · est $0.2M
Bid dateThursday, March 8—
BEL County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Bbr Drilling Company INC | R2Tucson INC | R3Shelly & Sands INC | R4Suburban Maintenance & Construction | R5Ohio-west Virginia Excavating CO | R6Alan Stone CO INC | R7R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 390 FT | $110 | $55.00 | $62.00 | $20.00 | $60.00 | $90.00 | $100 | 18% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $27,000 | $26,200 | $45,800 | $35,000 | $44,000 | $50,000 | $60,000 | 11% |
| Item | Quantity | R1Bbr Drilling Company INC | R2Tucson INC | R3Shelly & Sands INC | R4Suburban Maintenance & Construction | R5Ohio-west Virginia Excavating CO | R6Alan Stone CO INC | R7R C Construction Company And Son |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $500 | $2,600 | $5,193 | $10,000 | $4,500 | $4,000 | $7,500 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 12 FT | $10.00 | $29.00 | $18.00 | $50.00 | $130 | $100 | $40.00 |
| 202E38000 GUARDRAIL REMOVED |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 208 FT |
| $125 |
| $129 |
| $95.00 |
| $150 |
| $91.00 |
| $105 |
| $175 |
| 11% |
| 204E10000 SUBGRADE COMPACTION | 264 SY | $70.00 | $2.20 | $3.50 | $5.00 | $8.50 | $2.50 | $2.00 | 8% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN (WEATH | 650 FT | $28.00 | $37.00 | $30.00 | $36.00 | $31.00 | $27.00 | $40.00 | 8% |
| 511E81300 CONCRETE, MISC.:8"X24"X69" PRECAST CONCRETE LAGGIN | 86 EACH | $195 | $167 | $250 | $250 | $270 | $188 | $200 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $19,500 | $10,000 | $30,000 | $15,000 | $30,000 | $25,000 | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 34 CY | $305 | $390 | $339 | $365 | $345 | $315 | $330 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (23 CY | $380 | $307 | $276 | $375 | $310 | $394 | $350 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 17 CY | $455 | $422 | $367 | $450 | $350 | $473 | $425 | 3% |
| 203E20000 EMBANKMENT | 96 CY | $70.00 | $37.00 | $13.00 | $15.00 | $65.00 | $20.00 | $20.00 | 3% |
| 621E00100 RPM | 5 EACH | $1,300 | $512 | $445 | $1,000 | $675 | $525 | $1,000 | 3% |
| 202E23000 PAVEMENT REMOVED | 234 SY | $25.00 | $15.00 | $12.00 | $15.00 | $24.00 | $22.00 | $40.00 | 2% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 3" | 233 SY | $25.00 | $28.00 | $33.00 | $25.00 | $33.00 | $21.00 | $40.00 | 2% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 23 CY | $250 | $415 | $285 | $350 | $320 | $370 | $300 | 2% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 133 SY | $40.00 | $120 | $105 | $95.00 | $155 | $178 | $150 | 2% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 69 CY | $70.00 | $108 | $130 | $65.00 | $115 | $176 | $75.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 150 FT | $30.00 | $32.00 | $27.60 | $40.00 | $43.00 | $37.00 | $30.00 | 2% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 346 CY | $12.00 | $23.00 | $73.00 | $45.00 | $70.00 | $37.00 | $20.00 | 2% |
| 304E20000 AGGREGATE BASE | 49 CY | $70.00 | $91.00 | $97.00 | $70.00 | $163 | $119 | $75.00 | 1% |
| 150 FT |
| $1.00 |
| $3.50 |
| $5.00 |
| $5.00 |
| $8.00 |
| $6.00 |
| $5.00 |
| 202E98000 REMOVAL MISC.: PILING REMOVED | 1 LS | $500 | $3,500 | $5,500 | $5,000 | $5,600 | $4,000 | $20,000 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 284 SY | $1.75 | $3.80 | $7.50 | $2.50 | $8.00 | $6.50 | $20.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E05900 15" CONDUIT, TYPE B | 12 FT | $70.00 | $120 | $125 | $100 | $300 | $525 | $125 |
| 611E98631 CATCH BASIN ADJUSTED TO GRADE, AS PER PLAN | 1 EACH | $300 | $582 | $650 | $2,000 | $2,500 | $1,162 | $1,500 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $300 | $400 | $255 | $500 | $362 | $334 | $150 |
| 611E99900 DRAINAGE STRUCTURE, MISC.: HEADWALL REMOVED FOR RE | 1 EACH | $700 | $1,950 | $350 | $500 | $412 | $225 | $1,500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 212 FT | $7.00 | $5.75 | $2.00 | $8.00 | $5.00 | $11.00 | $15.00 |
| 407E10000 TACK COAT | 26 GAL | $5.00 | $2.00 | $2.00 | $3.00 | $26.00 | $3.00 | $15.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 13 GAL | $25.00 | $45.00 | $39.00 | $25.00 | $7.00 | $27.00 | $100 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 5 EACH | $22.00 | $43.00 | $15.00 | $500 | $100 | $13.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 2 EACH | $16.00 | $9.00 | $7.50 | $15.00 | $15.00 | $9.00 | $20.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.08 MILE | $12,000 | $7,475 | $6,500 | $6,500 | $7,000 | $6,823 | $25,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.04 MILE | $12,000 | $14,100 | $12,250 | $12,250 | $15,000 | $12,858 | $25,000 |
| 511E71100 CONCRETE, MISC.: CAST-IN-PLACE CONCRETE LAGGING | 2 CY | $1,200 | $1,670 | $3,000 | $1,500 | $2,000 | $2,325 | $1,500 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 160 FT | $3.00 | $9.30 | $3.00 | $10.00 | $5.00 | $11.00 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 10 FT | $3.00 | $27.00 | $20.00 | $10.00 | $20.00 | $52.00 | $10.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $700 | $3,850 | $2,597 | $5,000 | $4,275 | $2,000 | $10,000 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $8,600 | $4,250 | $3,500 | $2,000 | $4,500 | $7,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 390 FT | $110 | $43k | 17% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $27,000 | $27k | 11% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 208 FT | $125 | $26k | 10% |
| 204E10000 SUBGRADE COMPACTION | 264 SY | $70 | $18k | 7% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN (WEATH | 650 FT | $28 | $18k | 7% |
| 511E81300 CONCRETE, MISC.:8"X24"X69" PRECAST CONCRETE LAGGIN | 86 EACH | $195 | $17k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $12,000 | $12k | 5% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 34 CY | $305 | $10k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (23 CY | $380 | $9k | 3% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 17 CY | $455 | $8k | 3% |