OTT-SR 2-27.18 Slide repair
OTT County · est $3.0M
Bid dateThursday, March 22—
OTT County · est $3.0M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 63 more items below.
| Item | Quantity | R1Independence Excavating INC | R2Mark Haynes Construction INC | % of bid |
|---|---|---|---|---|
| 601E27000 DUMPED ROCK FILL, TYPE C | 7,761 CY | $72.00 | $118 | 19% |
| 203E10000 EXCAVATION | 42,335 CY | $13.00 | $46.00 | 18% |
| 205E10050 LIME STABILIZED EMBANKMENT | 30,045 CY | $14.00 | $24.00 | 14% |
| 205E10300 LIME | 1,339 TON | $151 | $142 | 7% |
| 622E41000 PORTABLE BARRIER, 32" | 5,700 FT | $35.00 | $68.00 | 7% |
| 690E98800 SPECIAL -LIME KILN DUST | 2,331 TON | $72.00 | $90.00 | 6% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 929 SY | $120 | $85.00 | 4% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $218,000 | 3% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $92,000 | $48,000 | 3% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 1,252 CY | $71.00 | $80.00 | 3% |
| 203E35130 GRANULAR MATERIAL, TYPE D | 944 CY | $85.00 | $75.00 | 3% |
| 203E35110 GRANULAR MATERIAL, TYPE B | 986 CY | $78.00 | $70.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $60,000 | $118,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $50,000 | $65,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $45,000 | $24,000 | 2% |
| 622E80000 GLARE SCREEN | 5,300 FT | $8.00 | $12.00 | 1% |
| 878E25000 INSPECTION AND COMPACTION TESTING OF UNBOUND MATER | 1 LS | $35,000 | $36,000 | 1% |
| 611E99920 DRAINAGE STRUCTURE, MISC.: MEDIAN INLET | 1 LS | $35,000 | $22,500 | 1% |
| 442E10000 ASPHALT CONCRETE SURFACE COURSE, 12.5 MM, TYPE A ( | 100 CY | $350 | $385 | 1% |
| 605E11000 6" CONSTRUCTION UNDERDRAINS | 1,062 FT | $28.00 | $20.00 | 1% |
| Item | Quantity | R1Independence Excavating INC | R2Mark Haynes Construction INC |
|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $20,000 | $68,000 |
| 202E23000 PAVEMENT REMOVED | 629 SY | $18.00 | $60.00 |
| 202E38000 GUARDRAIL REMOVED | 422.5 FT | $3.00 | $15.00 |
| 204E10000 SUBGRADE COMPACTION | 1,668 SY | $2.00 | $20.00 |
| 204E45000 PROOF ROLLING | 1 HOUR | $340 | $2,500 |
| 606E15050 GUARDRAIL, TYPE MGS | 662.5 FT | $20.00 | $28.00 |
| 606E35100 BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 1 EACH | $550 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $700 |
| 601E21050 TIED CONCRETE BLOCK MAT, TYPE 1 | 8 SY | $200 | $500 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $65.00 | $100 |
| 659E10000 SEEDING AND MULCHING | 8,142 SY | $1.10 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 1.1 TON | $450 | $800 |
| 659E31000 LIME | 1.69 ACRE | $100 | $150 |
| 659E35000 WATER | 44 MGAL | $1.05 | $20.00 |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $7,500 | $6,500 |
| 832E30000 EROSION CONTROL | 20,000 EACH | $1.00 | $1.00 |
| 605E14000 6" BASE PIPE UNDERDRAINS | 562 FT | $16.00 | $20.00 |
| 611E00510 6" CONDUIT, TYPE F FOR UNDERDRAIN OUTLETS | 218 FT | $4.00 | $20.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $720 | $750 |
| 251E01020 PARTIAL DEPTH PAVEMENT REPAIR (442) | 15 SY | $350 | $1,150 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1 1/2" | 840 SY | $10.00 | $20.00 |
| 255E20000 FULL DEPTH PAVEMENT SAWING | 695 FT | $4.00 | $15.00 |
| 256E10000 BONDED PATCHING OF PORTLAND CEMENT CONCRETE PAVEME | 20 SF | $265 | $400 |
| 302E46000 ASPHALT CONCRETE BASE, PG64-22 | 164 CY | $170 | $225 |
| 304E20000 AGGREGATE BASE | 273 CY | $90.00 | $48.00 |
| 407E10000 TACK COAT | 297 GAL | $3.00 | $4.00 |
| 442E10100 ASPHALT CONCRETE INTERMEDIATE COURSE, 19 MM, TYPE | 76 CY | $230 | $320 |
| 618E40100 RUMBLE STRIPS, (ASPHALT CONCRETE) | 4,957 FT | $2.00 | $6.00 |
| 625E00480 CONNECTION, UNFUSED PERMANENT | 2 EACH | $125 | $210 |
| 625E24100 1-1/2" DUCT CABLE WITH TWO NO. 4 AWG 2400 VOLT CAB | 595 FT | $7.00 | $20.00 |
| 625E29000 TRENCH | 585 FT | $11.00 | $20.00 |
| 625E30700 PULL BOX, 725.08, 18" | 1 EACH | $850 | $1,220 |
| 625E31510 PULL BOX REMOVED | 1 EACH | $150 | $860 |
| 625E35020 RE-ERECT EXISTING LIGHT TOWER | 1 EACH | $5,000 | $4,660 |
| 625E35100 REERECT EXISTING LUMINAIRE | 4 EACH | $160 | $540 |
| 625E36000 PLASTIC CAUTION TAPE | 595 FT | $1.00 | $2.50 |
| 621E00100 RPM | 7 EACH | $550 | $80.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, ONE-WAY | 7 EACH | $8.00 | $50.00 |
| 630E04100 GROUND MOUNTED SUPPORT, NO. 4 POST | 35.6 FT | $16.00 | $19.00 |
| 630E74601 OVERHEAD SIGN SUPPORT, INSTALLATION ONLY, AS PER P | 1 EACH | $9,000 | $10,220 |
| 630E81100 SIGN ERECTED, FLAT SHEET | 20 SF | $11.00 | $14.00 |
| 630E84511 RIGID OVERHEAD SIGN SUPPORT FOUNDATION, AS PER PLA | 1 EACH | $5,200 | $6,220 |
| 630E85101 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION, AS | 1 EACH | $310 | $370 |
| 642E00094 EDGE LINE, 6" | 1.5 MILE | $1,550 | $1,200 |
| 642E00194 LANE LINE, 6" | 1.75 MILE | $1,430 | $750 |
| 644E00104 EDGE LINE, 6" | 0.13 MILE | $18,000 | $10,000 |
| 644E00404 CHANNELIZING LINE, 12" | 266 FT | $4.50 | $4.00 |
| 644E00700 TRANSVERSE/DIAGONAL LINE | 38 FT | $8.00 | $8.00 |
| 644E01520 DOTTED LINE, 12" | 513 FT | $4.50 | $4.00 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 60 HOUR | $65.00 | $110 |
| 614E11630 INCREASED BARRIER DELINEATION | 1,000 FT | $1.00 | $8.00 |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 3 EACH | $2,300 | $3,800 |
| 614E12484 WORK ZONE INCREASED PENALTIES SIGN | 4 EACH | $150 | $250 |
| 614E12500 REPLACEMENT SIGN | 5 EACH | $185 | $175 |
| 614E12600 REPLACEMENT DRUM | 20 EACH | $60.00 | $100 |
| 614E12800 WORK ZONE RAISED PAVEMENT MARKER | 700 EACH | $8.00 | $7.00 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, ONE-WAY | 230 EACH | $9.00 | $6.00 |
| 614E18030 MAINTAINING TRAFFIC, MISC.: REMOVAL OF PORTABLE BA | 800 FT | $14.00 | $30.00 |
| 614E18601 PORTABLE CHANGEABLE MESSAGE SIGN, AS PER PLAN | 8 SNMT | $1,100 | $1,500 |
| 614E18700 DIGITAL SPEED LIMIT (DSL) SIGN ASSEMBLY | 8 SNMT | $900 | $1,100 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 3.85 MILE | $7,600 | $8,500 |
| 616E10000 WATER | 5 MGAL | $104 | $300 |
| 108E30000 CPM PROGRESS SCHEDULE SHORT DURATION PROJECTS | 1 LS | $7,500 | $10,000 |
| 619E16000 FIELD OFFICE, TYPE A | 2 MNTH | $1,300 | $1,800 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E27000 DUMPED ROCK FILL, TYPE C | 7,761 CY | $72 | $559k | 17% |
| 203E10000 EXCAVATION | 42,335 CY | $13 | $550k | 17% |
| 205E10050 LIME STABILIZED EMBANKMENT | 30,045 CY | $14 | $421k | 13% |
| 205E10300 LIME | 1,339 TON | $151 | $202k | 6% |
| 622E41000 PORTABLE BARRIER, 32" | 5,700 FT | $35 | $200k | 6% |
| 690E98800 SPECIAL -LIME KILN DUST | 2,331 TON | $72 | $168k | 5% |
| 452E13010 9" NON-REINFORCED CONCRETE PAVEMENT, CLASS QC1 | 929 SY | $120 | $111k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $100,000 | $100k | 3% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $92,000 | $92k | 3% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 1,252 CY | $71 | $89k | 3% |