WAS-SR 145-03.14
WAS County · est $0.3M
Bid dateThursday, May 17—
WAS County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 22 more items below.
| Item | Quantity | R1Alan Stone CO INC | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES, W12X87 | 1,014 FT | $65.00 | $89.50 | $63.00 | $70.00 | 19% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 552 FT | $90.00 | $121 | $125 | $225 | 14% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 105 CY | $356 | $110 | $325 | $75.00 | 11% |
| 610E50000 RETAINING WALL, MISC.:PRECAST CONCRETE PANEL NO. 1 | 152 EACH | $204 | $222 | $300 | $250 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $27,000 | $31,500 | $15,000 | $45,000 | 8% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 273 FT | $88.00 | $134 | $105 |
| Item | Quantity | R1Alan Stone CO INC | R2Ohio-west Virginia Excavating CO | R3Shelly & Sands INC | R4R C Construction Company And Son INC |
|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 275 FT | $3.00 | $6.00 | $2.00 | $3.00 |
| 203E10000 EXCAVATION | 26 CY | $25.00 | $47.00 | $30.00 | $20.00 |
| 203E20000 EMBANKMENT | 90 CY | $13.00 | $40.00 | $22.00 | $20.00 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 50 FT | $30.00 | $40.00 | $25.20 | $30.00 |
| 659E10000 SEEDING AND MULCHING |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $200 |
| 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 66 CY | $355 | $325 | $338 | $375 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $19,000 | $10,000 | $12,000 | $20,000 | 5% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 143 SY | $106 | $65.00 | $80.00 | $175 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $2,000 | $6,500 | $4,500 | 3% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $7,348 | $5,000 | $30,000 | $7,500 | 2% |
| 622E41000 PORTABLE BARRIER, 32" | 420 FT | $16.00 | $23.00 | $25.00 | $20.00 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 225 FT | $29.00 | $30.00 | $22.80 | $26.00 | 2% |
| 615E10000 ROADS FOR MAINTAINING TRAFFIC | 1 LS | $5,591 | $3,500 | $12,500 | $15,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $1,900 | $8,078 | $10,000 | 1% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,310 | $2,800 | $2,500 | $2,100 | 1% |
| 617E10100 COMPACTED AGGREGATE | 21 CY | $148 | $150 | $115 | $75.00 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,500 | $5,000 | $3,400 | $20,000 | 1% |
| 202E98100 REMOVAL MISC.:PILE EXTRACTION | 5 EACH | $426 | $450 | $750 | $2,000 | 1% |
| 239 SY |
| $5.00 |
| $7.05 |
| $5.65 |
| $20.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.04 TON | $2,772 | $456 | $540 | $1,200 |
| 659E31000 LIME | 0.05 ACRE | $736 | $425 | $150 | $750 |
| 659E35000 WATER | 1 MGAL | $36.00 | $10.00 | $1.00 | $1.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $323 | $200 | $225 | $150 |
| 407E20000 NON-TRACKING TACK COAT | 145 GAL | $4.50 | $6.00 | $4.00 | $10.00 |
| 621E00100 RPM | 17 EACH | $121 | $350 | $85.00 | $300 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 17 EACH | $12.00 | $50.00 | $20.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 7 EACH | $9.00 | $50.00 | $6.50 | $10.00 |
| 642E00094 EDGE LINE, 6" | 0.24 MILE | $3,149 | $3,200 | $3,000 | $6,000 |
| 642E00290 CENTER LINE | 0.12 MILE | $5,878 | $6,000 | $5,600 | $7,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1, BI-DIRECTIONAL | 10 EACH | $53.00 | $60.00 | $10.00 | $40.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 10 EACH | $53.00 | $25.00 | $15.00 | $40.00 |
| 614E22000 WORK ZONE EDGE LINE, CLASS I, 4" | 0.18 MILE | $3,726 | $3,800 | $3,550 | $12,500 |
| 614E26000 WORK ZONE STOP LINE, CLASS I | 22 FT | $11.00 | $12.00 | $10.00 | $50.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 219 FT | $8.50 | $7.00 | $5.00 | $10.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 15 FT | $34.00 | $8.00 | $45.00 | $10.00 |
| 610E50000 RETAINING WALL, MISC.:PRECAST CONCRETE PANEL NO. 2 | 2 EACH | $379 | $600 | $700 | $750 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.:SOLDIER PILES, W12X87 | 1,014 FT | $65 | $66k | 18% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 552 FT | $90 | $50k | 14% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 105 CY | $356 | $37k | 10% |
| 610E50000 RETAINING WALL, MISC.:PRECAST CONCRETE PANEL NO. 1 | 152 EACH | $204 | $31k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $27,000 | $27k | 7% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 273 FT | $88 | $24k | 7% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 66 CY | $355 | $23k | 6% |
| 624E10000 MOBILIZATION | 1 LS | $19,000 | $19k | 5% |
| 615E25000 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B | 143 SY | $106 | $15k | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $10,000 | $10k | 3% |