TUS-SR 800-25.10
TUS County · est $0.2M
Bid dateThursday, May 17—
TUS County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Dennison Bridge INC | R3Alan Stone CO INC | R4Shelly & Sands INC | R5Suburban Maintenance & Construction | R6INC R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 858 FT | $50.00 | $62.00 | $44.00 | $75.00 | $60.00 | $125 | 23% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $41,200 | $35,000 | $40,591 | $35,000 | $30,000 | $25,000 | 22% |
| 507E00400 STEEL PILES, MISC.: W16X31 STEEL BEAMS, FURNISHED | 1,040 FT | $22.00 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Dennison Bridge INC | R3Alan Stone CO INC | R4Shelly & Sands INC | R5Suburban Maintenance & Construction | R6INC R C Construction Company And Son INC |
|---|---|---|---|---|---|---|---|
| 202E38000 GUARDRAIL REMOVED | 75 FT | $5.00 | $2.00 | $7.00 | $5.00 | $2.50 | $5.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 25 FT | $40.00 | $60.00 | $53.00 | $50.00 | $47.20 | $35.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $25.00 |
| $20.00 |
| $25.00 |
| $16.00 |
| $25.00 |
| 12% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 130 FT | $105 | $105 | $88.00 | $95.00 | $200 | $150 | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 36 CY | $325 | $500 | $351 | $450 | $450 | $350 | 6% |
| 304E20000 AGGREGATE BASE | 43 CY | $165 | $110 | $99.00 | $122 | $65.00 | $75.00 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 15 CY | $350 | $700 | $519 | $650 | $650 | $450 | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $5,000 | $3,500 | $2,624 | $2,500 | $3,425 | $5,000 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 265 SY | $17.00 | $28.00 | $25.00 | $7.00 | $15.00 | $50.00 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (8 CY | $500 | $700 | $601 | $600 | $600 | $450 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $7,500 | $26,808 | $12,000 | $30,000 | $15,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,500 | $2,500 | $2,500 | $2,200 | $7,500 | $7,500 | 2% |
| 202E23000 PAVEMENT REMOVED | 156 SY | $22.00 | $14.00 | $14.00 | $25.00 | $15.00 | $20.00 | 2% |
| 621E00100 RPM | 2 EACH | $1,500 | $800 | $1,522 | $700 | $695 | $1,000 | 2% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $300 | $120 | $360 | $300 | $500 | $50.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $100 | $6,387 | $3,500 | $10,000 | $1,500 | 1% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 234 SY | $7.00 | $4.00 | $7.50 | $6.00 | $5.00 | $2.00 | 1% |
| 605E31100 AGGREGATE DRAINS | 45 FT | $35.00 | $20.00 | $24.00 | $17.50 | $50.00 | $10.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $1,500 | $2,000 | $4,724 | $4,500 | $5,000 | $8,000 | 1% |
| 204E10000 SUBGRADE COMPACTION | 179 SY | $8.00 | $4.00 | $2.50 | $5.00 | $10.00 | $2.00 | 1% |
| $1.00 |
| $1.00 |
| $1.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 160 FT | $4.00 | $6.00 | $32.00 | $3.00 | $2.50 | $50.00 |
| 407E10000 TACK COAT | 24 GAL | $25.00 | $10.00 | $5.50 | $3.00 | $3.00 | $10.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 25 GAL | $25.00 | $30.00 | $27.00 | $25.00 | $15.00 | $20.00 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 2 EACH | $50.00 | $50.00 | $11.00 | $35.00 | $25.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 2 EACH | $35.00 | $10.00 | $9.50 | $9.00 | $50.00 | $10.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.06 MILE | $14,000 | $15,000 | $12,595 | $12,000 | $12,000 | $25,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.03 MILE | $26,000 | $30,000 | $25,190 | $24,000 | $24,000 | $40,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 858 FT | $50 | $43k | 23% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $41,200 | $41k | 22% |
| 507E00400 STEEL PILES, MISC.: W16X31 STEEL BEAMS, FURNISHED | 1,040 FT | $22 | $23k | 12% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 130 FT | $105 | $14k | 7% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 36 CY | $325 | $12k | 6% |
| 304E20000 AGGREGATE BASE | 43 CY | $165 | $7k | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 15 CY | $350 | $5k | 3% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $5,000 | $5k | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 265 SY | $17 | $5k | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (8 CY | $500 | $4k | 2% |