MRG-SR 60 8.430
MRG County · est $0.5M
Bid dateThursday, May 24—
MRG County · est $0.5M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 26 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2George J Igel & CO INC | R3Alan Stone CO INC | R4R C Construction Company And Son INC | R5Suburban Maintenance & Construction | % of bid |
|---|---|---|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 1,399 FT | $79.00 | $77.00 | $80.00 | $110 | $75.00 | 25% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24x117 | 1,549 FT | $63.00 | $80.00 | $64.00 | $75.00 | $65.00 | 22% |
| 530E00400 SPECIAL - STRUCTURES: PRECAST CONCRETE LAGGING NO. | 162 EACH | $245 | $240 | $197 | $200 | $350 | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,307 | $38,400 | $40,000 | $25,000 | $50,000 | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 85 CY | $300 | $208 | $315 | $300 | $325 | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG |
| Item | Quantity | R1Shelly & Sands INC | R2George J Igel & CO INC | R3Alan Stone CO INC | R4R C Construction Company And Son INC | R5Suburban Maintenance & Construction |
|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 138 SY | $11.00 | $11.00 | $15.00 | $20.00 | $15.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 22 FT | $20.00 | $16.50 | $19.00 | $20.00 | $50.00 |
| 202E38000 GUARDRAIL REMOVED | 250 FT | $2.50 | $2.50 | $3.00 | $3.00 | $2.50 |
| 202E42010 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 75 CY |
| $325 |
| $310 |
| $345 |
| $325 |
| $350 |
| 6% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 176 FT | $105 | $77.00 | $140 | $175 | $75.00 | 4% |
| 203E10000 EXCAVATION | 985 CY | $16.50 | $13.50 | $20.00 | $10.00 | $19.30 | 4% |
| 203E20000 EMBANKMENT | 755 CY | $20.00 | $20.00 | $10.00 | $20.00 | $19.30 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 141 CY | $85.00 | $100 | $195 | $55.00 | $65.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,000 | $28,500 | $15,000 | $50,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $13,000 | $7,000 | $10,000 | $10,000 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 275 FT | $22.50 | $22.50 | $24.00 | $30.00 | $25.00 | 1% |
| 622E41001 PORTABLE BARRIER, 32", AS PER PLAN | 300 FT | $20.00 | $25.00 | $19.00 | $25.00 | $35.00 | 1% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 13 CY | $425 | $785 | $740 | $550 | $300 | 1% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,000 | $7,500 | $3,500 | $3,500 | $25,000 | 1% |
| 304E20000 AGGREGATE BASE | 65 CY | $70.00 | $70.00 | $85.00 | $55.00 | $65.00 | 1% |
| 614E12339 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL), AS PE | 2 EACH | $2,100 | $2,100 | $2,205 | $1,500 | $3,500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,525 | $4,440 | $3,500 | $20,000 | $15,000 | 1% |
| 524E95000 DRILLED SHAFTS, MISC.: EXTENSION | 13 FT | $250 | $77.00 | $118 | $1,000 | $150 | 1% |
| 1 EACH |
| $250 |
| $300 |
| $243 |
| $1,000 |
| $500 |
| 202E42040 ANCHOR ASSEMBLY REMOVED, TYPE T | 1 EACH | $250 | $300 | $205 | $1,000 | $500 |
| 204E10000 SUBGRADE COMPACTION | 428 SY | $3.50 | $5.25 | $2.50 | $2.00 | $5.00 |
| 606E20050 ROUNDED END SECTION | 2 EACH | $50.00 | $50.00 | $53.00 | $1,000 | $500 |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 2 EACH | $850 | $850 | $893 | $1,750 | $1,000 |
| 659E10000 SEEDING AND MULCHING | 516 SY | $3.85 | $3.82 | $2.50 | $10.00 | $2.50 |
| 659E20000 COMMERCIAL FERTILIZER | 0.07 TON | $665 | $665 | $2,772 | $1,200 | $500 |
| 659E31000 LIME | 0.11 ACRE | $145 | $149 | $736 | $800 | $400 |
| 659E35000 WATER | 1.39 MGAL | $1.00 | $1.00 | $21.00 | $10.00 | $2.00 |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $250 | $280 | $318 | $250 | $500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 245 FT | $2.00 | $2.50 | $13.00 | $20.00 | $2.50 |
| 407E20000 NON-TRACKING TACK COAT | 120 GAL | $3.00 | $14.00 | $3.50 | $10.00 | $3.00 |
| 408E10000 PRIME COAT | 72 GAL | $15.00 | $13.00 | $11.00 | $20.00 | $4.00 |
| 617E10100 COMPACTED AGGREGATE | 15 CY | $100 | $200 | $162 | $55.00 | $100 |
| 621E00100 RPM | 10 EACH | $80.00 | $225 | $350 | $500 | $550 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 10 EACH | $15.00 | $11.00 | $11.00 | $50.00 | $50.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BIDIRECTIONAL | 6 EACH | $7.50 | $7.50 | $8.00 | $20.00 | $15.00 |
| 642E00094 EDGE LINE, 6" | 0.15 MILE | $4,800 | $729 | $5,000 | $5,500 | $4,800 |
| 642E00290 CENTER LINE | 0.08 MILE | $8,600 | $1,293 | $9,000 | $10,000 | $8,600 |
| 614E13360 OBJECT MARKER, TWO WAY | 6 EACH | $15.00 | $18.00 | $35.00 | $20.00 | $55.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 201 FT | $5.00 | $3.00 | $8.50 | $25.00 | $8.00 |
| 518E40012 6" NON-PERFORATED CORRUGATED PLASTIC PIPE | 17 FT | $25.00 | $18.00 | $28.00 | $25.00 | $8.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 1,399 FT | $79 | $111k | 24% |
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24x117 | 1,549 FT | $63 | $98k | 21% |
| 530E00400 SPECIAL - STRUCTURES: PRECAST CONCRETE LAGGING NO. | 162 EACH | $245 | $40k | 9% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $28,307 | $28k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 85 CY | $300 | $26k | 6% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 75 CY | $325 | $24k | 5% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 176 FT | $105 | $18k | 4% |
| 203E10000 EXCAVATION | 985 CY | $16.5 | $16k | 4% |
| 203E20000 EMBANKMENT | 755 CY | $20 | $15k | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 141 CY | $85 | $12k | 3% |