HOC-US 33-19.12
HOC County · est $0.4M
Bid dateThursday, May 24—
HOC County · est $0.4M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 2 more items below.
| Item | Quantity | R1Axis Civil Construction LLC | R2Shelly & Sands INC | R3Allard Excavation LLC | R4R C Construction Company And Son INC | % of bid |
|---|---|---|---|---|---|---|
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1,744 CY | $72.00 | $86.00 | $83.99 | $75.00 | 32% |
| 659E00301 TOPSOIL, AS PER PLAN | 1,964 CY | $34.00 | $43.75 | $49.80 | $20.00 | 17% |
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 830 CY | $65.00 | $90.75 | $81.25 | $75.00 | 14% |
| 607E35000 FENCE REMOVED AND REBUILT | 555 FT | $47.80 | $48.00 | $75.00 | $25.00 | 7% |
| 670E00550 SLOPE EROSION PROTECTION MAT, TYPE E | 17,675 SY | $1.50 | $3.25 | $3.25 | $4.00 | 7% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20,000 | $84,500 |
| Item | Quantity | R1Axis Civil Construction LLC | R2Shelly & Sands INC | R3Allard Excavation LLC | R4R C Construction Company And Son INC |
|---|---|---|---|---|---|
| 659E00100 SOIL ANALYSIS TEST | 1 EACH | $250 | $60.00 | $60.00 | $100 |
| 659E35000 WATER | 1.61 MGAL | $1.00 | $100 | $100 | $100 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $54,000 |
| 5% |
| 659E00531 SEEDING AND MULCHING, CLASS 3B, AS PER PLAN | 20,175 SY | $0.65 | $0.65 | $0.65 | $1.00 | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $7,500 | $5,300 | $40,000 | 2% |
| 659E15001 INTER-SEEDING, AS PER PLAN | 11,228 SY | $0.65 | $1.50 | $1.50 | $1.00 | 2% |
| 659E98000 SEEDING, MISC.:VIRGINIA PINE - PINUS VIRGINIANA | 28,903 SY | $0.25 | $0.02 | $0.02 | $1.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $21,416 | $3,150 | $25,000 | 2% |
| 202E70120 SPECIAL - PIPE CLEANOUT, 27" TO 48" | 192 FT | $32.00 | $8.00 | $412 | $150 | 2% |
| 832E30000 EROSION CONTROL | 6,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 2% |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 105 FT | $55.00 | $14.00 | $273 | $100 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,200 | $9,000 | $4,000 | $15,000 | 1% |
| 832E15000 STORM WATER POLLUTION PREVENTION PLAN | 1 LS | $3,000 | $4,450 | $6,880 | $35,000 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,000 | $3,000 | $10,215 | $45,000 | 1% |
| 659E20000 COMMERCIAL FERTILIZER | 2.81 TON | $650 | $450 | $450 | $1,200 | 0% |
| 659E98000 SEEDING, MISC.:BLACK LOCUST - ROBINA PSEUDOACACIA | 28,903 SY | $0.05 | $0.02 | $0.02 | $1.00 | 0% |
| 659E31000 LIME | 6.48 ACRE | $200 | $50.00 | $50.00 | $800 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 1,744 CY | $72 | $126k | 32% |
| 659E00301 TOPSOIL, AS PER PLAN | 1,964 CY | $34 | $67k | 17% |
| 601E27001 DUMPED ROCK FILL, TYPE C, AS PER PLAN | 830 CY | $65 | $54k | 14% |
| 607E35000 FENCE REMOVED AND REBUILT | 555 FT | $47.8 | $27k | 7% |
| 670E00550 SLOPE EROSION PROTECTION MAT, TYPE E | 17,675 SY | $1.5 | $27k | 7% |
| 624E10000 MOBILIZATION | 1 LS | $20,000 | $20k | 5% |
| 659E00531 SEEDING AND MULCHING, CLASS 3B, AS PER PLAN | 20,175 SY | $0.65 | $13k | 3% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $8,500 | $9k | 2% |
| 659E15001 INTER-SEEDING, AS PER PLAN | 11,228 SY | $0.65 | $7k | 2% |
| 659E98000 SEEDING, MISC.:VIRGINIA PINE - PINUS VIRGINIANA | 28,903 SY | $0.25 | $7k | 2% |