BEL-SR 149-05.32
BEL County · est $0.2M
Bid dateThursday, July 12—
BEL County · est $0.2M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1Rudzik Excavating INC | R2Shelly & Sands INC | R3Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|
| 203E20000 EMBANKMENT | 1,051 CY | $30.00 | $19.00 | $30.00 | 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 101 CY | $264 | $286 | $197 | 12% |
| 203E10000 EXCAVATION | 491 CY | $41.00 | $14.50 | $30.00 | 9% |
| 202E98000 REMOVAL MISC.:TIMBER WALL | 1 LS | $19,500 | $6,500 | $8,500 | 9% |
| 624E10000 MOBILIZATION | 1 LS | $15,070 | $10,000 | $11,000 | 7% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,755 | $56,000 | $31,000 | 7% |
| 304E20000 AGGREGATE BASE | 170 CY | $84.62 | $100 | $92.00 |
| Item | Quantity | R1Rudzik Excavating INC | R2Shelly & Sands INC | R3Ohio-west Virginia Excavating CO |
|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 44 SY | $40.00 | $20.00 | $37.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 8 FT | $50.00 | $34.50 | $80.00 |
| 202E38000 GUARDRAIL REMOVED | 390 FT | $2.75 | $5.00 | $4.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $632 | $425 | $650 |
| 202E70110 SPECIAL - PIPE CLEANOUT, 24" AND UNDER | 100 FT | $18.00 | $22.00 | $35.00 |
| 204E45000 PROOF ROLLING |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 6% |
| 622E41000 PORTABLE BARRIER, 32" | 410 FT | $32.60 | $25.00 | $23.00 | 6% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 368 FT | $29.00 | $10.00 | $18.00 | 5% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (29 CY | $352 | $298 | $285 | 5% |
| 202E56000 BUILDING DEMOLISHED, PARCEL 26-00730.000, BUILDING | 1 LS | $10,000 | $30,560 | $45,000 | 4% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 21 CY | $413 | $405 | $350 | 4% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,100 | $5,500 | $6,500 | 3% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,200 | $2,750 | $2,800 | 2% |
| 606E15050 GUARDRAIL, TYPE MGS | 200 FT | $19.25 | $21.75 | $32.00 | 2% |
| 611E07600 18" CONDUIT, TYPE C | 24 FT | $160 | $85.00 | $120 | 2% |
| 659E10000 SEEDING AND MULCHING | 894 SY | $4.00 | $2.50 | $4.00 | 2% |
| 204E10000 SUBGRADE COMPACTION | 685 SY | $5.00 | $4.25 | $2.00 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,915 | $1,750 | $3,800 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $10,000 | $5,000 | 1% |
| 2 HOUR |
| $200 |
| $200 |
| $122 |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 50 FT | $20.35 | $24.00 | $33.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,265 | $1,635 | $1,500 |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E | 1 EACH | $2,365 | $2,530 | $2,000 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $400 | $425 | $450 |
| 659E00300 TOPSOIL | 99 CY | $20.00 | $15.25 | $44.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.1 TON | $500 | $734 | $4,000 |
| 659E31000 LIME | 0.2 ACRE | $100 | $142 | $2,900 |
| 659E35000 WATER | 5 MGAL | $1.00 | $1.00 | $12.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.3 CY | $2,050 | $4,500 | $5,700 |
| 611E00410 4" CONDUIT, TYPE F FOR UNDERDRAIN OUTLET | 34 FT | $32.08 | $35.00 | $30.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 3 EACH | $320 | $330 | $290 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 305 FT | $4.00 | $2.50 | $3.00 |
| 407E10000 TACK COAT | 35 GAL | $2.53 | $2.00 | $5.00 |
| 408E10000 PRIME COAT | 18 GAL | $33.00 | $29.00 | $30.00 |
| 611E99654 MANHOLE ADJUSTED TO GRADE | 1 EACH | $900 | $1,350 | $2,000 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 4 EACH | $8.25 | $13.00 | $29.00 |
| 630E03100 GROUND MOUNTED SUPPORT, NO. 3 POST | 40 FT | $13.20 | $13.00 | $12.00 |
| 630E80100 SIGN, FLAT SHEET | 15.8 SF | $19.80 | $24.00 | $29.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 2 EACH | $16.50 | $25.00 | $18.00 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 2 EACH | $16.50 | $25.00 | $18.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.05 MILE | $12,000 | $9,306 | $13,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.12 MILE | $5,700 | $4,710 | $6,000 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 5 CY | $150 | $195 | $575 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 9 EACH | $55.00 | $7.50 | $59.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 9 EACH | $55.00 | $17.00 | $37.00 |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.07 MILE | $17,600 | $15,850 | $18,500 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.04 MILE | $15,400 | $13,138 | $15,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.1 MILE | $8,800 | $7,920 | $9,200 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.08 MILE | $7,700 | $6,670 | $7,800 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 30 FT | $12.00 | $10.00 | $12.00 |
| 616E10000 WATER | 5 MGAL | $5.00 | $27.50 | $9.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E20000 EMBANKMENT | 1,051 CY | $30 | $32k | 12% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 101 CY | $264 | $27k | 11% |
| 203E10000 EXCAVATION | 491 CY | $41 | $20k | 8% |
| 202E98000 REMOVAL MISC.:TIMBER WALL | 1 LS | $19,500 | $20k | 8% |
| 624E10000 MOBILIZATION | 1 LS | $15,070 | $15k | 6% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $14,755 | $15k | 6% |
| 304E20000 AGGREGATE BASE | 170 CY | $84.62 | $14k | 6% |
| 622E41000 PORTABLE BARRIER, 32" | 410 FT | $32.6 | $13k | 5% |
| 605E06000 4" BASE PIPE UNDERDRAINS | 368 FT | $29 | $11k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (29 CY | $352 | $10k | 4% |