BEL-SR 147-25.48
BEL County · est $0.1M
Bid dateThursday, July 26—
BEL County · est $0.1M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 18items by winning bid’s extended amount.
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Rudzik Excavating INC | R4Dennison Bridge INC | R5R C Construction Company And Son | % of bid |
|---|---|---|---|---|---|---|---|
| 203E10000 EXCAVATION | 1,263 CY | $20.00 | $12.00 | $27.40 | $35.00 | $20.00 | 20% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $19,500 | $15,000 | $8,375 | $15,000 | $25,000 | 15% |
| 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN | 385 CY | $50.00 | $73.50 | $91.62 | $135 | $95.00 | 15% |
| 203E20000 EMBANKMENT | 997 CY | $18.75 | $29.00 | $21.00 | $15.00 | $20.00 | 15% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 90 CY | $135 | $122 | $71.28 | $90.00 | $100 | 9% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $6,800 |
| $2,250 |
| $2,000 |
| $4,000 |
| $12,500 |
| 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,001 | $5,000 | $5,000 | $15,000 | $12,500 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $13,000 | $9,011 | $15,000 | $15,000 | 3% |
| 304E20000 AGGREGATE BASE | 53 CY | $75.00 | $128 | $89.65 | $120 | $95.00 | 3% |
| 607E15001 FENCE, TYPE 47, AS PER PLAN | 58 FT | $57.20 | $40.00 | $50.00 | $70.00 | $65.00 | 3% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 393 SY | $4.66 | $6.00 | $5.00 | $4.00 | $10.00 | 1% |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 4 EACH | $450 | $282 | $310 | $300 | $250 | 1% |
| 611E01500 6" CONDUIT, TYPE F, 707.33 | 81 FT | $19.00 | $23.00 | $30.32 | $15.00 | $20.00 | 1% |
| 204E10000 SUBGRADE COMPACTION | 273 SY | $5.00 | $7.25 | $5.00 | $4.00 | $2.00 | 1% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 611E01400 6" CONDUIT, TYPE E, 707.31 (PERFORATED) | 229 FT | $3.50 | $23.00 | $29.58 | $10.00 | $45.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $720 | $2,000 | $1,980 | $2,500 | $8,500 | 1% |
| 202E75000 FENCE REMOVED | 76 FT | $2.40 | $13.00 | $25.00 | $5.00 | $5.00 | 0% |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 203E10000 EXCAVATION | 1,263 CY | $20 | $25k | 20% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $19,500 | $20k | 15% |
| 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN | 385 CY | $50 | $19k | 15% |
| 203E20000 EMBANKMENT | 997 CY | $18.75 | $19k | 15% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 90 CY | $135.25 | $12k | 9% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,800 | $7k | 5% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $6,001 | $6k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $4,000 | $4k | 3% |
| 304E20000 AGGREGATE BASE | 53 CY | $75 | $4k | 3% |
| 607E15001 FENCE, TYPE 47, AS PER PLAN | 58 FT | $57.2 | $3k | 3% |