HAS-TR 185-00.80
HAS County · est $0.3M
Bid dateThursday, July 26—
HAS County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 6 more items below.
| Item | Quantity | R1Dennison Bridge INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Suburban Maintenance & Construction | R5Bbr Drilling Company INC | R6Shelly & Sands INC | R7Lockhart Concrete CO | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,710 FT | $29.00 | $33.00 | $29.00 | $28.00 | $58.00 | $35.00 | $57.00 | 20% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 912 FT | $50.00 | $47.25 | $45.00 | $45.00 | $25.00 | $71.00 | $135 | 18% |
| Item | Quantity | R1Dennison Bridge INC | R2Ohio-west Virginia Excavating CO | R3Alan Stone CO INC | R4Suburban Maintenance & Construction | R5Bbr Drilling Company INC | R6Shelly & Sands INC | R7Lockhart Concrete CO |
|---|---|---|---|---|---|---|---|---|
| 201E11000 CLEARING AND GRUBBING | 1 LS | $100 | $3,000 | $2,359 | $10,000 | $250 | $3,500 | $900 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 300 FT | $3.00 | $3.00 | $16.00 | $2.50 | $9.00 | $3.00 | $2.00 |
| 407E10000 TACK COAT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 684 FT |
| $60.00 |
| $79.00 |
| $64.00 |
| $100 |
| $30.00 |
| $110 |
| $130 |
| 16% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 560 FT | $63.00 | $75.00 | $68.00 | $83.00 | $92.00 | $85.00 | $99.00 | 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 36 CY | $350 | $275 | $315 | $300 | $305 | $425 | $260 | 5% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 22 CY | $525 | $350 | $525 | $500 | $505 | $500 | $300 | 5% |
| 304E20000 AGGREGATE BASE | 85 CY | $110 | $110 | $86.00 | $65.00 | $70.00 | $105 | $50.00 | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (16 CY | $450 | $320 | $326 | $310 | $315 | $475 | $280 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $7,000 | $10,000 | $32,710 | $24,200 | $31,000 | $10,000 | $19,500 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 250 FT | $27.00 | $35.00 | $24.00 | $23.60 | $32.00 | $22.50 | $18.00 | 3% |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE, 1.25" | 312 SY | $17.00 | $7.00 | $18.00 | $17.00 | $22.00 | $35.00 | $9.00 | 2% |
| 202E23000 PAVEMENT REMOVED | 312 SY | $12.00 | $7.00 | $11.00 | $5.00 | $14.00 | $9.00 | $10.00 | 1% |
| 203E20000 EMBANKMENT | 232 CY | $14.00 | $35.00 | $28.00 | $20.00 | $70.00 | $20.00 | $20.00 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $3,100 | $4,000 | $2,500 | $8,000 | $500 | $2,950 | $9,900 | 1% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,300 | $950 | $1,312 | $1,500 | $2,500 | $1,250 | $1,035 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,500 | $1,000 | $4,724 | $5,000 | $2,000 | $6,721 | $14,000 | 1% |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 434 SY | $4.00 | $4.09 | $6.50 | $5.00 | $2.00 | $3.87 | $2.00 | 1% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $1,500 | $3,500 | $5,000 | $10,000 | $27,000 | $3,750 | $27,000 | 1% |
| 204E10000 SUBGRADE COMPACTION | 358 SY | $3.00 | $5.00 | $2.50 | $5.00 | $4.00 | $6.00 | $1.00 | 0% |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | 0% |
| 45 GAL |
| $10.00 |
| $2.00 |
| $2.50 |
| $2.25 |
| $7.00 |
| $2.00 |
| $5.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 50 GAL | $15.00 | $5.00 | $16.00 | $15.00 | $20.00 | $20.00 | $6.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 3 EACH | $10.00 | $15.00 | $8.50 | $5.00 | $30.00 | $8.00 | $25.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.06 MILE | $12,000 | $18,000 | $18,106 | $17,250 | $18,000 | $17,250 | $20,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,710 FT | $29 | $50k | 19% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 912 FT | $50 | $46k | 18% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 684 FT | $60 | $41k | 16% |
| 524E95000 DRILLED SHAFTS, MISC.: PLUG PILE, 30" DIAMETER, UN | 560 FT | $63 | $35k | 14% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 36 CY | $350 | $13k | 5% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 22 CY | $525 | $12k | 5% |
| 304E20000 AGGREGATE BASE | 85 CY | $110 | $9k | 4% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (16 CY | $450 | $7k | 3% |
| 624E10000 MOBILIZATION | 1 LS | $7,000 | $7k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 250 FT | $27 | $7k | 3% |