MRG-SR 78-13.90
MRG County · est $0.3M
Bid dateThursday, August 23—
MRG County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 16 more items below.
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Rudzik Excavating INC | % of bid |
|---|---|---|---|---|---|
| 601E27000 DUMPED ROCK FILL, TYPE C | 776 CY | $58.00 | $70.00 | $92.84 | 18% |
| 203E20000 EMBANKMENT | 2,997 CY | $14.05 | $23.50 | $40.13 | 16% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 274 CY | $120 | $118 | $86.33 | 13% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 69 CY | $400 | $280 | $400 | 11% |
| 203E10000 EXCAVATION | 2,593 CY | $8.00 | $19.80 | $31.00 | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 29 CY | $450 | $285 | $400 | 5% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 |
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Rudzik Excavating INC |
|---|---|---|---|---|
| 204E50100 GEOTEXTILE FABRIC, 712.09, TYPE A | 665 SY | $0.65 | $5.00 | $9.10 |
| 690E12010 SPECIAL - GEOTEXTILE FABRIC , 712.09, TYPE B | 773 SY | $1.00 | $6.00 | $9.42 |
| 659E20000 COMMERCIAL FERTILIZER | 0.22 TON | $716 | $1,085 | $1,000 |
| 659E31000 LIME | 0.46 ACRE | $193 | $900 | $1,000 |
| 659E35000 WATER | 6 MGAL | $1.00 | $1.00 | $1.00 |
| 611E01400 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $26,000 |
| $40,791 |
| 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10,600 | $28,920 | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 430 FT | $17.00 | $26.50 | $84.00 | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 250 FT | $27.50 | $38.00 | $28.52 | 3% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $6,500 | $500 | $6,000 | 3% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $6,000 | $4,000 | $6,000 | 2% |
| 621E00100 RPM | 14 EACH | $375 | $80.00 | $250 | 2% |
| 304E20000 AGGREGATE BASE | 74 CY | $70.00 | $96.00 | $100 | 2% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE ENCHRP 350 OR MASH 2016 | 2 EACH | $2,250 | $2,000 | $2,520 | 2% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,250 | $3,000 | $6,000 | 2% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 2,233 SY | $1.30 | $1.75 | $9.97 | 1% |
| 202E23000 PAVEMENT REMOVED | 180 SY | $13.00 | $13.00 | $40.00 | 1% |
| 204E10000 SUBGRADE COMPACTION | 230 SY | $6.00 | $9.00 | $10.00 | 1% |
| 250 FT |
| $1.25 |
| $12.00 |
| $43.43 |
| 611E01500 6" CONDUIT, TYPE F , 707.33 | 62 FT | $17.50 | $12.00 | $53.55 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $155 | $285 | $381 |
| 407E20000 NON-TRACKING TACK COAT | 126 GAL | $3.00 | $3.00 | $30.00 |
| 408E10000 PRIME COAT | 90 GAL | $15.00 | $5.00 | $30.00 |
| 617E10100 COMPACTED AGGREGATE | 10 CY | $95.00 | $400 | $200 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 14 EACH | $10.00 | $98.00 | $100 |
| 626E00110 BARRIER REFLECTOR, TYPE 2BI-DIRECTIONAL | 6 EACH | $8.60 | $8.00 | $6.00 |
| 642E00094 EDGE LINE, 6" | 0.19 MILE | $4,500 | $5,000 | $8,000 |
| 642E00290 CENTER LINE | 0.09 MILE | $9,000 | $10,000 | $18,000 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $1,250 | $5,000 | $6,600 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E27000 DUMPED ROCK FILL, TYPE C | 776 CY | $58 | $45k | 17% |
| 203E20000 EMBANKMENT | 2,997 CY | $14.05 | $42k | 16% |
| 203E35001 GRANULAR EMBANKMENT, AS PER PLAN | 274 CY | $120 | $33k | 12% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 69 CY | $400 | $28k | 10% |
| 203E10000 EXCAVATION | 2,593 CY | $8 | $21k | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 29 CY | $450 | $13k | 5% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $10,000 | $10k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 622E41000 PORTABLE BARRIER, 32" | 430 FT | $17 | $7k | 3% |
| 606E15050 GUARDRAIL, TYPE MGS | 250 FT | $27.5 | $7k | 3% |