| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Dennison Bridge INC | R4Alan Stone CO INC | % of bid |
|---|---|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 360 FT | $60.00 | $27.00 | $60.00 | $38.00 | 11% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 660 FT | $32.00 | $35.00 | $30.00 | $30.00 | 11% |
| 511E81300 CONCRETE, MISC.: 8"X24"X45" PRECAST CONCRETE LAGGI | 76 EACH | $225 | $200 | $300 | $165 | 9% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 200 FT | $85.00 | $96.00 | $75.00 | $67.00 | 9% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 153 SY | $90.00 | $82.00 | $65.00 | $130 | 7% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 105 CY | $130 | $250 | $110 |
| Item | Quantity | R1Shelly & Sands INC | R2Ohio-west Virginia Excavating CO | R3Dennison Bridge INC | R4Alan Stone CO INC |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 174 SY | $15.00 | $24.00 | $23.00 | $12.00 |
| 202E38000 GUARDRAIL REMOVED | 100 FT | $5.00 | $6.00 | $3.00 | $2.50 |
| 202E98000 REMOVAL MISC.:PILING REMOVED | 1 LS | $3,950 | $4,500 | $2,500 | $831 |
| 203E20000 EMBANKMENT | 20 CY | $15.00 | $18.00 | $30.00 | $14.00 |
| 204E10000 SUBGRADE COMPACTION | 174 SY |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $275 |
| 7% |
| 617E10100 COMPACTED AGGREGATE | 105 CY | $105 | $130 | $50.00 | $94.00 | 6% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,750 | $10,000 | $3,000 | $3,963 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $8,000 | $23,000 | $36,000 | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 180 CY | $50.00 | $130 | $245 | $27.00 | 5% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $6,700 | $3,000 | $5,000 | $9,000 | 3% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 18 CY | $345 | $290 | $400 | $370 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $5,500 | $3,500 | $2,500 | $9,000 | 3% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 3% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 40 CY | $125 | $85.00 | $125 | $165 | 3% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 12 CY | $400 | $320 | $400 | $443 | 2% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 112.5 FT | $39.50 | $39.00 | $38.00 | $38.00 | 2% |
| 619E16010 FIELD OFFICE, TYPE B | 2 MNTH | $2,200 | $450 | $500 | $1,000 | 2% |
| 203E35111 GRANULAR MATERIAL, TYPE B, AS PER PLAN | 47 CY | $93.00 | $100 | $120 | $100 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $4,207 | $3,500 | $4,500 | $6,000 | 2% |
| $5.00 |
| $9.00 |
| $5.00 |
| $2.50 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,400 | $2,000 | $1,850 | $1,843 |
| 659E10001 SEEDING AND MULCHING, AS PER PLAN | 139 SY | $15.00 | $7.00 | $10.00 | $11.00 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 147 FT | $4.00 | $6.00 | $7.00 | $32.00 |
| 304E20000 AGGREGATE BASE | 47 CY | $85.00 | $110 | $120 | $96.00 |
| 407E10000 TACK COAT | 9 GAL | $2.00 | $23.00 | $20.00 | $2.00 |
| 408E10001 PRIME COAT, AS PER PLAN | 23 GAL | $37.00 | $13.00 | $40.00 | $25.00 |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 6 CY | $545 | $390 | $700 | $550 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (8 CY | $425 | $320 | $500 | $435 |
| 621E00100 RPM | 4 EACH | $125 | $140 | $125 | $500 |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 4 EACH | $8.00 | $100 | $10.00 | $11.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 4 EACH | $10.00 | $22.00 | $15.00 | $15.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.02 MILE | $26,275 | $29,000 | $30,000 | $81,264 |
| 642E00300 CENTER LINE, TYPE 1 | 0.02 MILE | $26,275 | $29,000 | $30,000 | $81,311 |
| 616E10000 WATER | 10 MGAL | $20.00 | $5.00 | $1.00 | $21.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 81 FT | $4.50 | $9.50 | $10.00 | $11.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 8 FT | $35.00 | $35.00 | $25.00 | $63.00 |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 36 FT | $60.00 | $38.00 | $60.00 | $39.00 |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 20 FT | $85.00 | $265 | $75.00 | $92.00 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $250 | $235 | $300 | $328 |
| 690E98200 SPECIAL - TIMBER LAGGING | 56 SF | $30.00 | $73.00 | $50.00 | $100 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,320 | $3,797 | $3,500 | $2,500 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 360 FT | $60 | $22k | 9% |
| 507E00201 STEEL PILES HP12X53, FURNISHED, AS PER PLAN | 660 FT | $32 | $21k | 9% |
| 511E81300 CONCRETE, MISC.: 8"X24"X45" PRECAST CONCRETE LAGGI | 76 EACH | $225 | $17k | 7% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 200 FT | $85 | $17k | 7% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 153 SY | $90 | $14k | 6% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 105 CY | $130 | $14k | 6% |
| 617E10100 COMPACTED AGGREGATE | 105 CY | $105 | $11k | 5% |
| 614E12420 DETOUR SIGNING | 1 LS | $10,750 | $11k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $10k | 4% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 180 CY | $50 | $9k | 4% |