WAS-SR 26-25.90
WAS County · est $0.6M
Bid dateThursday, October 25—
WAS County · est $0.6M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 12 more items below.
| Item | Quantity | R1Suburban Maintenance & Construction | R2INC Shelly & Sands INC | R3Alan Stone CO INC | R4Ohio-west Virginia Excavating CO | % of bid |
|---|---|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24X229 | 1,534 FT | $122 | $128 | $132 | $177 | 33% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 2,096 FT | $60.00 | $79.00 | $88.00 | $89.00 | 22% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 480 FT | $185 | $160 | $120 | $300 | 16% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $30,000 | $14,424 | $30,000 | $45,000 | 5% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $20,000 | $20,000 | $9,350 | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 51 CY | $475 | $470 | $500 |
| Item | Quantity | R1Suburban Maintenance & Construction | R2INC Shelly & Sands INC | R3Alan Stone CO INC | R4Ohio-west Virginia Excavating CO |
|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 67 SY | $12.50 | $35.00 | $47.00 | $30.50 |
| 203E10000 EXCAVATION | 40 CY | $15.00 | $23.00 | $22.49 | $27.50 |
| 204E10000 SUBGRADE COMPACTION | 84 SY | $5.00 | $8.00 | $2.26 | $12.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.08 TON | $500 | $675 | $3,465 | $825 |
| 659E31000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $286 |
| 4% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $19,000 | $19,500 | $5,500 | $3,200 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,000 | $5,500 | $4,000 | $9,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $4,414 | $3,700 | $10,000 | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 13 CY | $610 | $605 | $610 | $490 | 1% |
| 621E54000 RAISED PAVEMENT MARKER REMOVED | 15 EACH | $525 | $25.00 | $11.82 | $21.00 | 1% |
| 622E41000 PORTABLE BARRIER, 32" | 290 FT | $20.00 | $30.00 | $21.00 | $25.00 | 1% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $5,000 | $6,371 | $6,500 | $2,000 | 1% |
| 606E15050 GUARDRAIL, TYPE MGS | 250 FT | $18.00 | $17.50 | $18.37 | $28.00 | 1% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,100 | $2,050 | $2,050 | $2,700 | 1% |
| 617E10100 COMPACTED AGGREGATE | 23 CY | $175 | $125 | $134 | $175 | 1% |
| 832E30000 EROSION CONTROL | 3,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,200 | $1,150 | $1,207 | $1,500 | 0% |
| 659E10000 SEEDING AND MULCHING | 600 SY | $4.00 | $3.55 | $2.81 | $4.00 | 0% |
| 203E20000 EMBANKMENT | 80 CY | $15.00 | $20.00 | $14.79 | $46.00 | 0% |
| 0.13 ACRE |
| $500 |
| $145 |
| $775 |
| $120 |
| 659E35000 WATER | 2 MGAL | $1.00 | $1.00 | $21.00 | $1.00 |
| 304E20000 AGGREGATE BASE | 13 CY | $70.00 | $120 | $140 | $212 |
| 407E20000 NON-TRACKING TACK COAT | 126 GAL | $4.00 | $4.00 | $4.20 | $7.50 |
| 408E10000 PRIME COAT | 107 GAL | $9.00 | $20.00 | $15.75 | $8.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BIDIRECTIONAL) | 6 EACH | $10.00 | $7.80 | $8.19 | $30.00 |
| 642E00094 EDGE LINE, 6" | 0.23 MILE | $3,400 | $3,400 | $3,400 | $4,000 |
| 642E00290 CENTER LINE | 0.12 MILE | $6,000 | $6,000 | $6,000 | $7,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 507E00400 STEEL PILES, MISC.: SOLDIER PILES W24X229 | 1,534 FT | $122 | $187k | 32% |
| 524E94703 DRILLED SHAFTS, 36" DIAMETER, ABOVE BEDROCK, AS PE | 2,096 FT | $60 | $126k | 22% |
| 524E94705 DRILLED SHAFTS, 36" DIAMETER, INTO BEDROCK, AS PER | 480 FT | $185 | $89k | 15% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $30,000 | $30k | 5% |
| 624E10000 MOBILIZATION | 1 LS | $25,000 | $25k | 4% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 51 CY | $475 | $24k | 4% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $19,000 | $19k | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $12,000 | $12k | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $12,000 | $12k | 2% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 13 CY | $610 | $8k | 1% |