TUS-SR 800-25.65
TUS County · est $0.3M
Bid dateThursday, October 25—
TUS County · est $0.3M
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 23 more items below.
| Item | Quantity | R1J Miller & Son Excavating LTD | R2Dennison Bridge INC | R3Matt Winters Excavation LLC | R4Shelly & Sands INC | R5Rudzik Excavating INC | R6Lockhart Concrete CO | R7Ohio-west Virginia Excavating CO | R8Tucson INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|---|
| 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN | 1,177 CY | $62.55 | $80.00 | $90.50 | $68.50 | $77.00 | $94.00 | $96.00 | $100 | 37% |
| 203E10000 EXCAVATION | 1,817 CY | $13.71 | $18.00 | $11.00 | $18.50 | $30.00 |
| Item | Quantity | R1J Miller & Son Excavating LTD | R2Dennison Bridge INC | R3Matt Winters Excavation LLC | R4Shelly & Sands INC | R5Rudzik Excavating INC | R6Lockhart Concrete CO | R7Ohio-west Virginia Excavating CO | R8Tucson INC |
|---|---|---|---|---|---|---|---|---|---|
| 202E23000 PAVEMENT REMOVED | 16 SY | $16.50 | $28.00 | $36.00 | $40.00 | $80.00 | $10.00 | $20.00 | $85.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 43 FT | $8.20 | $10.00 | $13.00 | $5.75 | $10.00 | $5.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| $20.00 |
| $20.00 |
| $23.00 |
| 12% |
| 622E41000 PORTABLE BARRIER, 32" | 380 FT | $43.53 | $8.00 | $31.00 | $23.75 | $41.23 | $30.00 | $27.50 | $30.00 | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,509 | $12,000 | $13,200 | $11,000 | $17,197 | $19,000 | $33,000 | $31,000 | 8% |
| 661E99900 PLANTING, MISC.:BARE ROOT SEEDLINGS | 650 EACH | $19.94 | $12.00 | $17.00 | $33.30 | $20.00 | $5.00 | $35.00 | $17.00 | 6% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 181 CY | $70.04 | $110 | $97.00 | $96.00 | $78.00 | $134 | $112 | $100 | 6% |
| 659E00300 TOPSOIL | 201 CY | $34.43 | $24.00 | $29.00 | $12.00 | $37.05 | $25.00 | $25.00 | $40.00 | 3% |
| 611E05900 15" CONDUIT, TYPE B | 43 FT | $132 | $175 | $50.00 | $194 | $272 | $110 | $125 | $125 | 3% |
| 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) FOR 24 | 2 EACH | $2,278 | $2,000 | $2,750 | $1,950 | $2,000 | $1,250 | $2,500 | $2,300 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,563 | $3,000 | $3,000 | $9,300 | $5,500 | $14,700 | $5,200 | $7,500 | 2% |
| 659E10000 SEEDING AND MULCHING | 1,815 SY | $1.76 | $3.00 | $3.00 | $1.14 | $2.25 | $1.10 | $1.20 | $2.00 | 2% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $3,039 | $5,000 | $5,200 | $17,500 | $19,000 | $19,000 | $9,000 | $15,000 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $2,875 | $3,000 | $6,250 | $1,350 | $3,355 | $29,000 | $4,500 | $5,500 | 1% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 50 FT | $52.34 | $20.00 | $33.00 | $35.00 | $55.00 | $20.00 | $22.00 | $40.00 | 1% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.24 MILE | $10,152 | $3,000 | $5,500 | $3,690 | $10,000 | $4,000 | $4,000 | $4,000 | 1% |
| 611E98410 CATCH BASIN, NO. 8 | 1 EACH | $2,069 | $3,000 | $1,700 | $4,750 | $2,853 | $1,500 | $3,760 | $2,325 | 1% |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $202 | $120 | $330 | $175 | $100 | $150 | $600 | $100 | 1% |
| 624E10000 MOBILIZATION | 1 LS | $1,898 | $7,000 | $11,250 | $10,000 | $11,500 | $19,000 | $19,000 | $19,000 | 1% |
| 614E21200 WORK ZONE CENTER LINE, CLASS I, 740.06, TYPE I | 0.18 MILE | $10,367 | $12,000 | $5,500 | $12,070 | $9,900 | $12,000 | $13,000 | $14,000 | 1% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 4 CY | $320 | $800 | $350 | $2,000 | $650 | $300 | $285 | $750 | 1% |
| $20.00 |
| $35.00 |
| 202E38000 GUARDRAIL REMOVED | 50 FT | $9.52 | $5.00 | $12.00 | $5.00 | $20.00 | $5.00 | $2.00 | $5.50 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $264 | $250 | $575 | $425 | $400 | $25.00 | $1,500 | $750 |
| 203E20000 EMBANKMENT | 93 CY | $9.52 | $28.00 | $18.00 | $8.00 | $50.00 | $20.00 | $52.00 | $23.00 |
| 601E32200 ROCK CHANNEL PROTECTION, TYPE C WITH FILTER | 2 CY | $99.73 | $300 | $225 | $225 | $105 | $129 | $505 | $500 |
| 659E20000 COMMERCIAL FERTILIZER | 0.24 TON | $1,822 | $500 | $600 | $683 | $200 | $750 | $550 | $1,500 |
| 659E31000 LIME | 0.38 ACRE | $460 | $200 | $300 | $152 | $200 | $500 | $225 | $2,000 |
| 659E35000 WATER | 5 MGAL | $17.00 | $1.00 | $1.00 | $1.00 | $0.50 | $50.00 | $11.50 | $1.00 |
| 670E00700 DITCH EROSION PROTECTION | 125 SY | $2.80 | $3.00 | $7.00 | $1.90 | $15.00 | $2.50 | $2.00 | $4.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.27 CY | $1,248 | $2,000 | $1,750 | $3,000 | $2,121 | $2,000 | $2,000 | $3,250 |
| 304E20000 AGGREGATE BASE | 3 CY | $96.53 | $150 | $230 | $375 | $102 | $50.00 | $195 | $120 |
| 407E10000 TACK COAT | 1 GAL | $29.00 | $100 | $11.00 | $3.00 | $100 | $5.00 | $105 | $300 |
| 441E50100 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 1 CY | $522 | $1,000 | $750 | $2,500 | $1,200 | $350 | $650 | $800 |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (1 CY | $522 | $900 | $750 | $2,500 | $1,200 | $325 | $650 | $800 |
| 642E00300 CENTER LINE, TYPE 1 | 0.12 MILE | $10,591 | $5,000 | $11,000 | $4,920 | $10,000 | $10,000 | $7,500 | $7,500 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 9 EACH | $9.24 | $10.00 | $13.00 | $10.00 | $9.00 | $10.00 | $55.00 | $8.00 |
| 614E13312 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 14 EACH | $9.24 | $20.00 | $13.00 | $10.00 | $9.00 | $12.00 | $55.00 | $8.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 23 EACH | $15.02 | $15.00 | $16.00 | $13.00 | $15.00 | $15.00 | $55.00 | $14.00 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.1 MILE | $7,013 | $10,000 | $7,200 | $9,052 | $6,700 | $13,000 | $13,000 | $13,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 22 FT | $4.51 | $20.00 | $28.00 | $6.90 | $5.00 | $25.00 | $13.00 | $14.00 |
| 616E10000 WATER | 5 MGAL | $24.00 | $1.00 | $10.00 | $12.00 | $5.00 | $1.00 | $5.00 | $1.00 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 601E26001 DUMPED ROCK FILL, TYPE B, AS PER PLAN | 1,177 CY | $62.55 | $74k | 35% |
| 203E10000 EXCAVATION | 1,817 CY | $13.71 | $25k | 12% |
| 622E41000 PORTABLE BARRIER, 32" | 380 FT | $43.53 | $17k | 8% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $15,509 | $16k | 7% |
| 661E99900 PLANTING, MISC.:BARE ROOT SEEDLINGS | 650 EACH | $19.94 | $13k | 6% |
| 601E32104 ROCK CHANNEL PROTECTION, TYPE B WITH GEOTEXTILE FA | 181 CY | $70.04 | $13k | 6% |
| 659E00300 TOPSOIL | 201 CY | $34.43 | $7k | 3% |
| 611E05900 15" CONDUIT, TYPE B | 43 FT | $132.05 | $6k | 3% |
| 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) FOR 24 | 2 EACH | $2,278 | $5k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,563 | $4k | 2% |