D11-GR-FY2020
D11 County · est $1.6M
Bid dateThursday, March 26—
D11 County · est $1.6M
Published by ODOTon this contract’s Proposal PDF · EDGE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 38 more items below.
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO | % of bid |
|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 41,714.5 FT | $15.00 | $15.50 | 43% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 11,016.5 FT | $16.40 | $16.50 | 12% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 75 EACH | $2,165 | $2,150 | 11% |
| 202E38000 GUARDRAIL REMOVED | 62,304 FT | $1.20 | $2.50 | 5% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 3,498 FT | $20.60 | $23.50 | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 74 EACH | $895 | $900 | 5% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 20 EACH | $2,230 | $2,200 | 3% |
| 606E60029 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), AS PER |
| Item | Quantity | R1Lake Erie Construction Company | R2M P Dory CO |
|---|---|---|---|
| 202E75000 FENCE REMOVED | 98 FT | $2.00 | $10.00 |
| 203E20000 EMBANKMENT | 100 CY | $61.50 | $72.00 |
| 203E40000 BORROW | 50 CY | $48.50 | $72.00 |
| 606E13050 GUARDRAIL, TYPE 5A | 250 FT | $20.00 | $17.00 |
| 606E17360 GUARDRAIL, TYPE MGS, LONG-SPAN | 125 FT | $18.80 | $20.00 |
| 606E18500 GUARDRAIL POST, 9 FEET | 50 EACH | $15.00 | $20.00 |
| 606E25000 ANCHOR ASSEMBLY, TYPE A | 3 EACH | $19.00 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 2 EACH |
| $21,600 |
| $21,500 |
| 3% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,000 FT | $14.60 | $15.00 | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,500 | $40,000 | 1% |
| 606E35002 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 1 | 10 EACH | $1,945 | $1,950 | 1% |
| 209E15050 RESHAPING UNDER GUARDRAIL | 11.81 MILE | $1,500 | $2,750 | 1% |
| 606E15200 GUARDRAIL, TYPE MGS HALF POST SPACING WITH LONG PO | 750 FT | $22.40 | $25.00 | 1% |
| 606E27810 ANCHOR ASSEMBLY REBUILT, MGS TYPE A | 22 EACH | $720 | $750 | 1% |
| 606E98000 GUARDRAIL, MISC.:RAIL PANEL | 1,775 FT | $7.20 | $7.50 | 1% |
| 606E98100 GUARDRAIL, MISC.:LINE POST | 100 EACH | $125 | $75.00 | 1% |
| 614E18000 MAINTAINING TRAFFIC, MISC.:GUARDRAIL REPAIR | 20 EACH | $620 | $2,000 | 1% |
| 609E24000 CURB, TYPE 4-A | 133 FT | $72.00 | $85.00 | 1% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $9,250 | $2,000 | 1% |
| 606E60012 IMPACT ATTENUATOR, TYPE 1 (BIDIRECTIONAL) | 2 EACH | $4,275 | $4,200 | 1% |
| $1,350 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 2 EACH | $1,040 | $1,400 |
| 606E26000 ANCHOR ASSEMBLY, TYPE B | 2 EACH | $1,575 | $1,750 |
| 606E26050 ANCHOR ASSEMBLY, MGS TYPE B | 4 EACH | $1,795 | $1,750 |
| 606E26100 ANCHOR ASSEMBLY, TYPE E (NCHRP 350 OR MACH 2016) | 2 EACH | $2,180 | $2,150 |
| 606E26500 ANCHOR ASSEMBLY, TYPE T | 3 EACH | $725 | $800 |
| 606E35102 MGS BRIDGE TERMINAL ASSEMBLY, TYPE 2 | 3 EACH | $400 | $450 |
| 606E35141 BRIDGE TERMINAL ASSEMBLY, TYPE 4, AS PER PLAN | 9 EACH | $795 | $800 |
| 606E55020 SPECIAL - CABLE BARRIER, REPLACEMENT CABLE | 100 FT | $7.40 | $10.00 |
| 606E55100 SPECIAL - CABLE BARRIER, CONCRETE LINE POST FOUNDA | 5 EACH | $325 | $300 |
| 606E55110 SPECIAL - CABLE BARRIER, CONCRETE ANCHOR FOUNDATIO | 3 EACH | $495 | $1,250 |
| 606E55140 SPECIAL - CABLE BARRIER, ANCHOR POST | 4 EACH | $330 | $400 |
| 606E55170 SPECIAL - CABLE BARRIER, TURNBUCKLE | 1 EACH | $400 | $275 |
| 606E55180 SPECIAL - CABLE BARRIER, SPLICE | 3 EACH | $285 | $25.00 |
| 606E55190 SPECIAL - CABLE BARRIER, POST REFLECTOR | 13 EACH | $6.00 | $10.00 |
| 606E55200 SPECIAL - CABLE BARRIER, TENSIONING | 4 EACH | $320 | $5,000 |
| 606E55220 SPECIAL - CABLE BARRIER, ANCHOR POST RESET | 3 EACH | $215 | $500 |
| 606E98100 GUARDRAIL, MISC.:ANCHOR BUCKLE REPLACEMENT | 1 EACH | $360 | $25.00 |
| 606E98100 GUARDRAIL, MISC.:ANCHOR CABLE | 3 EACH | $390 | $100 |
| 606E98100 GUARDRAIL, MISC.:ANCHOR GROUND STRUT | 1 EACH | $150 | $150 |
| 606E98100 GUARDRAIL, MISC.:ANCHOR TRIGGER POST | 1 EACH | $395 | $750 |
| 606E98100 GUARDRAIL, MISC.:TENSIONED CABLE ANCHOR TERMINAL | 1 EACH | $2,265 | $4,000 |
| 659E10000 SEEDING AND MULCHING | 4,786 SY | $0.80 | $2.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.65 TON | $200 | $650 |
| 659E31000 LIME | 0.99 ACRE | $50.00 | $275 |
| 659E35000 WATER | 30 MGAL | $1.00 | $10.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 ONE WAY | 291 EACH | $7.00 | $7.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2, BI-DIRECTIONAL | 446 EACH | $7.00 | $7.50 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 100 HOUR | $50.00 | $70.00 |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,674 | $12,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $3,500 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 606E15050 GUARDRAIL, TYPE MGS | 41,714.5 FT | $15 | $626k | 41% |
| 606E15100 GUARDRAIL, TYPE MGS WITH LONG POSTS | 11,016.5 FT | $16.4 | $181k | 12% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (NCHRP 350 OR MASH 201 | 75 EACH | $2,165 | $162k | 11% |
| 202E38000 GUARDRAIL REMOVED | 62,304 FT | $1.2 | $75k | 5% |
| 606E15150 GUARDRAIL, TYPE MGS HALF POST SPACING | 3,498 FT | $20.6 | $72k | 5% |
| 606E26550 ANCHOR ASSEMBLY, MGS TYPE T | 74 EACH | $895 | $66k | 4% |
| 606E26150 ANCHOR ASSEMBLY, MGS TYPE E (MASH 2016) | 20 EACH | $2,230 | $45k | 3% |
| 606E60029 IMPACT ATTENUATOR, TYPE 2 (BIDIRECTIONAL), AS PER | 2 EACH | $21,600 | $43k | 3% |
| 606E13000 GUARDRAIL, TYPE 5 | 2,000 FT | $14.6 | $29k | 2% |
| 624E10000 MOBILIZATION | 1 LS | $20,500 | $21k | 1% |