COL-SR 267-00.59
COL County · est $0.4M
Bid dateThursday, April 23—
COL County · est $0.4M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 51 more items below.
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Shelly & Sands INC | R4Craig Edward Susany INC | R5Lockhart Concrete CO | R6Eclipse CO LLC | R7Dennison Bridge INC | % of bid |
|---|---|---|---|---|---|---|---|---|---|
| 511E81300 CONCRETE, MISC.: 8"x24"x45" PRECAST CONCRETE LAGGI | 258 EACH | $175 | $120 | $200 | $180 | $500 | $367 | $300 | 14% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,455 FT | $30.00 | $26.00 | $26.00 | $27.00 | $22.00 | $23.00 | $30.00 | 14% |
| 614E11000 |
| Item | Quantity | R1Ohio-west Virginia Excavating CO | R2Alan Stone CO INC | R3Shelly & Sands INC | R4Craig Edward Susany INC | R5Lockhart Concrete CO | R6Eclipse CO LLC | R7Dennison Bridge INC |
|---|---|---|---|---|---|---|---|---|
| 202E32000 CURB REMOVED | 360 FT | $5.00 | $3.00 | $2.00 | $10.00 | $5.00 | $5.00 | $15.00 |
| 202E35100 PIPE REMOVED, 24" AND UNDER | 31 FT | $50.00 | $14.00 | $12.00 | $10.00 | $20.00 | $24.00 | $20.00 |
| 202E38000 GUARDRAIL REMOVED | 249 FT |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $30,000 |
| $29,000 |
| $62,000 |
| $70,000 |
| $29,000 |
| $41,136 |
| $50,000 |
| 10% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 400 FT | $73.00 | $77.00 | $85.00 | $99.00 | $74.00 | $153 | $130 | 9% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 744 FT | $32.00 | $40.00 | $55.00 | $26.00 | $74.00 | $151 | $95.00 | 8% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 98 CY | $200 | $190 | $236 | $231 | $275 | $182 | $250 | 6% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 141 CY | $100 | $230 | $100 | $90.00 | $50.00 | $107 | $145 | 5% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 801 CY | $17.00 | $33.00 | $32.00 | $50.00 | $25.00 | $77.00 | $125 | 4% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 23 CY | $525 | $400 | $465 | $400 | $500 | $497 | $475 | 4% |
| 609E24510 CURB, TYPE 4-C | 364 FT | $30.00 | $26.00 | $47.00 | $30.00 | $20.00 | $29.50 | $45.00 | 3% |
| 622E41000 PORTABLE BARRIER, 32" | 470 FT | $22.00 | $28.00 | $20.00 | $30.00 | $32.00 | $31.00 | $26.00 | 3% |
| 624E10000 MOBILIZATION | 1 LS | $10,000 | $30,000 | $10,000 | $10,000 | $17,802 | $30,000 | $40,000 | 3% |
| 615E25001 PAVEMENT FOR MAINTAINING TRAFFIC, CLASS B, AS PER | 94 SY | $84.00 | $120 | $157 | $100 | $40.00 | $119 | $180 | 3% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $7,000 | $2,900 | $16,000 | $4,000 | $1,500 | $15,383 | $5,000 | 2% |
| 441E50300 ASPHALT CONCRETE INTERMEDIATE COURSE, TYPE 2 | 448 (30 CY | $232 | $390 | $252 | $300 | $320 | $363 | $400 | 2% |
| 304E20000 AGGREGATE BASE | 80 CY | $85.00 | $72.00 | $74.00 | $90.00 | $50.00 | $72.00 | $135 | 2% |
| 606E15151 GUARDRAIL, TYPE MGS HALF POST SPACING, AS PER PLAN | 206.25 FT | $30.00 | $32.00 | $32.00 | $31.00 | $28.00 | $33.50 | $35.00 | 2% |
| 441E50101 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), AS | 21 CY | $265 | $490 | $436 | $400 | $330 | $465 | $600 | 2% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $5,300 | $3,300 | $3,600 | $13,500 | $13,900 | $16,500 | $10,000 | 2% |
| 202E23001 PAVEMENT REMOVED, AS PER PLAN | 308 SY | $15.00 | $14.00 | $10.00 | $10.00 | $12.00 | $15.00 | $22.00 | 1% |
| $2.50 |
| $2.00 |
| $2.00 |
| $2.00 |
| $3.00 |
| $2.50 |
| $3.00 |
| 202E58100 CATCH BASIN REMOVED | 1 EACH | $920 | $420 | $475 | $100 | $300 | $377 | $750 |
| 203E10001 EXCAVATION, AS PER PLAN | 80 CY | $50.00 | $21.00 | $15.00 | $25.00 | $20.00 | $55.00 | $45.00 |
| 203E20000 EMBANKMENT | 49 CY | $20.00 | $23.00 | $18.00 | $90.00 | $30.00 | $78.00 | $32.00 |
| 204E10000 SUBGRADE COMPACTION | 488 SY | $3.00 | $3.00 | $2.80 | $3.00 | $2.00 | $2.50 | $5.00 |
| 606E15050 GUARDRAIL, TYPE MGS | 56.25 FT | $20.00 | $19.00 | $19.00 | $19.00 | $20.00 | $23.50 | $24.00 |
| 606E25550 ANCHOR ASSEMBLY, MGS TYPE A | 1 EACH | $1,200 | $1,200 | $1,150 | $1,200 | $2,100 | $1,382 | $1,500 |
| 601E32210 ROCK CHANNEL PROTECTION, TYPE C WITH AGGREGATE FIL | 1 CY | $125 | $890 | $640 | $90.00 | $150 | $101 | $500 |
| 659E00100 SOIL ANALYSIS TEST | 2 EACH | $49.00 | $100 | $105 | $25.00 | $200 | $158 | $100 |
| 659E00300 TOPSOIL | 91 CY | $30.00 | $60.00 | $36.00 | $25.00 | $30.00 | $53.00 | $70.00 |
| 659E10000 SEEDING AND MULCHING | 820 SY | $4.00 | $4.00 | $3.00 | $4.00 | $1.00 | $4.00 | $5.00 |
| 659E14000 REPAIR SEEDING AND MULCHING | 41 SY | $1.45 | $5.00 | $1.25 | $4.00 | $1.00 | $4.00 | $5.00 |
| 659E20000 COMMERCIAL FERTILIZER | 0.11 TON | $650 | $490 | $600 | $700 | $700 | $630 | $1,000 |
| 659E31000 LIME | 0.17 ACRE | $80.00 | $930 | $75.00 | $100 | $500 | $73.53 | $100 |
| 659E35000 WATER | 5 MGAL | $1.00 | $0.50 | $1.00 | $1.00 | $50.00 | $1.00 | $10.00 |
| 832E30000 EROSION CONTROL | 1,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 | $1.00 |
| 602E20000 CONCRETE MASONRY | 0.3 CY | $2,450 | $1,900 | $2,500 | $1,500 | $2,000 | $1,872 | $2,500 |
| 611E05901 15" CONDUIT, TYPE B, AS PER PLAN | 7 FT | $215 | $320 | $120 | $150 | $100 | $373 | $500 |
| 611E06100 15" CONDUIT, TYPE C | 11 FT | $105 | $86.00 | $70.00 | $75.00 | $90.00 | $91.00 | $175 |
| 611E98180 CATCH BASIN, NO. 3A | 1 EACH | $1,780 | $2,000 | $1,700 | $2,800 | $1,500 | $1,914 | $3,000 |
| 611E99710 PRECAST REINFORCED CONCRETE OUTLET | 1 EACH | $250 | $330 | $95.00 | $300 | $500 | $236 | $500 |
| 252E01500 FULL DEPTH PAVEMENT SAWING | 385 FT | $3.00 | $9.00 | $5.00 | $5.00 | $3.00 | $2.50 | $7.00 |
| 254E01000 PAVEMENT PLANING, ASPHALT CONCRETE (VARIABLE DEPTH | 176 SY | $11.00 | $25.00 | $45.00 | $34.00 | $10.00 | $24.00 | $50.00 |
| 407E10000 TACK COAT | 97 GAL | $10.00 | $3.00 | $2.00 | $8.00 | $3.00 | $2.50 | $3.00 |
| 626E00110 BARRIER REFLECTOR, TYPE 2 (BI-DIRECTIONAL) | 4 EACH | $8.00 | $8.00 | $7.00 | $7.00 | $12.00 | $11.50 | $10.00 |
| 630E02100 GROUND MOUNTED SUPPORT, NO. 2 POST | 44.3 FT | $20.00 | $21.00 | $21.00 | $10.00 | $14.00 | $16.00 | $25.00 |
| 630E08600 SIGN POST REFLECTOR | 2 EACH | $42.00 | $53.00 | $53.00 | $45.00 | $10.00 | $52.50 | $50.00 |
| 630E80100 SIGN, FLAT SHEET | 10 SF | $26.00 | $37.00 | $37.00 | $30.00 | $16.00 | $19.00 | $35.00 |
| 630E84900 REMOVAL OF GROUND MOUNTED SIGN AND DISPOSAL | 1 EACH | $10.00 | $21.00 | $21.00 | $10.00 | $35.00 | $65.00 | $20.00 |
| 630E85100 REMOVAL OF GROUND MOUNTED SIGN AND REERECTION | 1 EACH | $90.00 | $27.00 | $26.00 | $200 | $85.00 | $75.50 | $100 |
| 630E86002 REMOVAL OF GROUND MOUNTED POST SUPPORT AND DISPOSA | 3 EACH | $10.00 | $27.00 | $26.00 | $10.00 | $25.00 | $35.50 | $20.00 |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.24 MILE | $4,000 | $4,000 | $3,900 | $3,500 | $7,000 | $3,938 | $5,000 |
| 642E00300 CENTER LINE, TYPE 1 | 0.12 MILE | $7,500 | $7,400 | $7,400 | $3,500 | $9,000 | $7,349 | $10,000 |
| 614E11110 LAW ENFORCEMENT OFFICER WITH PATROL CAR FOR ASSIST | 40 HOUR | $50.00 | $69.00 | $69.00 | $75.00 | $50.00 | $68.50 | $75.00 |
| 614E12348 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) (FOR 2 | 2 EACH | $2,250 | $2,000 | $2,000 | $2,000 | $2,000 | $1,995 | $2,500 |
| 614E13000 ASPHALT CONCRETE FOR MAINTAINING TRAFFIC | 10 CY | $290 | $360 | $274 | $400 | $360 | $249 | $250 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BI-DIRECTIONAL) | 11 EACH | $34.00 | $34.00 | $34.00 | $11.00 | $12.00 | $9.00 | $35.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 11 EACH | $22.00 | $36.00 | $36.00 | $15.00 | $24.00 | $16.00 | $35.00 |
| 614E21100 WORK ZONE CENTER LINE, CLASS I, 642 PAINT | 0.18 MILE | $7,200 | $7,000 | $7,000 | $7,000 | $14,000 | $30,587 | $10,000 |
| 614E21550 WORK ZONE CENTER LINE, CLASS III, 642 PAINT | 0.12 MILE | $7,100 | $6,900 | $6,900 | $7,000 | $16,000 | $6,111 | $10,000 |
| 614E22210 WORK ZONE EDGE LINE, CLASS I, 6", 740.06, TYPE I | 0.24 MILE | $8,500 | $8,300 | $8,200 | $8,000 | $14,000 | $6,376 | $10,000 |
| 614E22360 WORK ZONE EDGE LINE, CLASS III, 6", 642 PAINT | 0.24 MILE | $3,500 | $3,600 | $3,600 | $4,000 | $13,000 | $5,964 | $6,000 |
| 614E26400 WORK ZONE STOP LINE, CLASS I, 740.06, TYPE I | 29 FT | $13.00 | $14.00 | $13.00 | $13.00 | $10.00 | $4.00 | $15.00 |
| 616E10000 WATER | 10 MGAL | $5.00 | $21.00 | $85.00 | $1.00 | $50.00 | $23.50 | $10.00 |
| 203E20000 EMBANKMENT | 67 CY | $21.00 | $9.00 | $32.00 | $90.00 | $30.00 | $23.00 | $30.00 |
| 518E40000 6" PERFORATED CORRUGATED PLASTIC PIPE | 156 FT | $5.00 | $11.00 | $3.00 | $10.00 | $5.00 | $5.50 | $10.00 |
| 518E40010 6" NON-PERFORATED CORRUGATED PLASTIC PIPE, INCLUDI | 8 FT | $5.00 | $51.00 | $34.00 | $10.00 | $30.00 | $12.50 | $20.00 |
| 619E16000 FIELD OFFICE, TYPE A | 4 MNTH | $500 | $900 | $1,800 | $1,500 | $300 | $600 | $1,500 |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $2,000 | $4,000 | $7,000 | $6,000 | $10,000 | $16,464 | $5,000 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 511E81300 CONCRETE, MISC.: 8"x24"x45" PRECAST CONCRETE LAGGI | 258 EACH | $175 | $45k | 12% |
| 507E00200 STEEL PILES HP12X53, FURNISHED | 1,455 FT | $30 | $44k | 12% |
| 614E11000 MAINTAINING TRAFFIC | 1 LS | $30,000 | $30k | 8% |
| 524E94505 DRILLED SHAFTS, 24" DIAMETER, INTO BEDROCK, AS PER | 400 FT | $73 | $29k | 8% |
| 524E94503 DRILLED SHAFTS, 24" DIAMETER, ABOVE BEDROCK, AS PE | 744 FT | $32 | $24k | 6% |
| 301E46000 ASPHALT CONCRETE BASE, PG64-22 | 98 CY | $200 | $20k | 5% |
| 518E21200 POROUS BACKFILL WITH GEOTEXTILE FABRIC | 141 CY | $100 | $14k | 4% |
| 503E21101 UNCLASSIFIED EXCAVATION, AS PER PLAN | 801 CY | $17 | $14k | 4% |
| 511E46511 CLASS QC1 CONCRETE, FOOTING, AS PER PLAN | 23 CY | $525 | $12k | 3% |
| 609E24510 CURB, TYPE 4-C | 364 FT | $30 | $11k | 3% |