WAS-SR 821-05.20
WAS County · est $1.0M
Bid dateThursday, April 23—
WAS County · est $1.0M
Published by ODOTon this contract’s Proposal PDF · DBE Goal: 5.0%
Bid form · ODOT
ODOT bid tab line items with each bidder’s unit price. Top 20items by winning bid’s extended amount · 10 more items below.
| Item | Quantity | R1Buds INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC | % of bid |
|---|---|---|---|---|---|---|
| 862E00601 SLOPE DRAPE, AS PER PLAN | 4,915 SY | $100 | $98.00 | $93.00 | $83.00 | 69% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 160 CY | $250 | $220 | $235 | $230 | 6% |
| 862E00610 EXCAVATION | 2,390 CY | $16.50 | $12.00 | $21.00 | $50.00 | 6% |
| 622E41010 PORTABLE BARRIER, 50" | 920 FT | $35.00 | $41.00 | $40.00 | $52.00 | 5% |
| Item | Quantity | R1Buds INC | R2Alan Stone CO INC | R3Ohio-west Virginia Excavating CO | R4Shelly & Sands INC |
|---|---|---|---|---|---|
| 659E20000 COMMERCIAL FERTILIZER | 0.67 TON | $620 | $650 | $750 | $605 |
| 659E31000 LIME | 1.02 ACRE | $75.00 | $750 | $95.00 | $75.00 |
| 659E35000 WATER | 14 MGAL | $1.00 | $21.00 | $1.00 | $1.00 |
| 407E20000 NON-TRACKING TACK COAT | 327 GAL | $4.00 | $4.00 | $10.00 | $4.00 |
| 621E54000 |
How to read this. Plan‑pull counts come straight from agency portals. Patterns and confidence scores are derived from comparable lettings (same county, same category, three‑year basis). Confidence is a calibration of past correctness on signals of this shape — not a guarantee of this bid’s outcome. We never round up. More on what Cassandri does →
| 1 LS |
| $25,500 |
| $25,000 |
| $200,000 |
| $85,000 |
| 4% |
| 862E00500 SCALING | 48 HOUR | $450 | $480 | $630 | $580 | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $12,000 | $37,000 | $33,500 | $55,000 | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $4,800 | $5,000 | $42,500 | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,200 | $6,000 | $12,000 | $10,053 | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1.00 | $1.00 | $1.00 | $1.00 | 1% |
| 614E12740 WORK ZONE LIGHTING SYSTEM | 1 EACH | $5,000 | $5,300 | $2,000 | $51,500 | 1% |
| 408E10000 PRIME COAT | 220 GAL | $20.00 | $13.00 | $10.00 | $20.00 | 1% |
| 659E10000 SEEDING AND MULCHING | 3,597 SY | $1.15 | $2.00 | $1.40 | $1.10 | 1% |
| 614E12338 WORK ZONE IMPACT ATTENUATOR (BIDIRECTIONAL) | 2 EACH | $2,000 | $2,600 | $4,000 | $2,500 | 1% |
| 617E10100 COMPACTED AGGREGATE | 23 CY | $135 | $150 | $65.00 | $200 | 0% |
| 671E15060 EROSION CONTROL MAT, TYPE G | 1,265 SY | $2.00 | $20.00 | $2.50 | $28.00 | 0% |
| 621E00100 RPM | 31 EACH | $80.00 | $130 | $150 | $120 | 0% |
| 203E20000 EMBANKMENT | 99 CY | $22.00 | $14.00 | $42.00 | $25.00 | 0% |
| 201E11000 CLEARING AND GRUBBING | 1 LS | $2,000 | $21,000 | $45,000 | $53,000 | 0% |
| 642E00104 EDGE LINE, 6", TYPE 1 | 0.47 MILE | $4,000 | $1,900 | $2,235 | $1,775 | 0% |
| 31 EACH |
| $10.00 |
| $24.00 |
| $58.00 |
| $15.00 |
| 642E00300 CENTER LINE, TYPE 1 | 0.24 MILE | $4,000 | $3,300 | $3,800 | $3,050 |
| 614E13310 BARRIER REFLECTOR, TYPE 1 (BIDIRECTIONAL) | 19 EACH | $7.00 | $24.00 | $27.00 | $10.00 |
| 614E13360 OBJECT MARKER, TWO WAY | 19 EACH | $12.00 | $28.00 | $33.00 | $15.00 |
| 614E22110 WORK ZONE EDGE LINE, CLASS I, 6", 642 PAINT | 0.22 MILE | $5,000 | $4,000 | $4,800 | $3,775 |
| 614E26200 WORK ZONE STOP LINE, CLASS I, 642 PAINT | 24 FT | $25.00 | $14.00 | $15.00 | $12.50 |
| Item | Qty | Unit price | Extended | % |
|---|---|---|---|---|
| 862E00601 SLOPE DRAPE, AS PER PLAN | 4,915 SY | $100 | $492k | 68% |
| 441E50000 ASPHALT CONCRETE SURFACE COURSE, TYPE 1, (448), PG | 160 CY | $250 | $40k | 6% |
| 862E00610 EXCAVATION | 2,390 CY | $16.5 | $39k | 5% |
| 622E41010 PORTABLE BARRIER, 50" | 920 FT | $35 | $32k | 4% |
| 624E10000 MOBILIZATION | 1 LS | $25,500 | $26k | 4% |
| 862E00500 SCALING | 48 HOUR | $450 | $22k | 3% |
| 614E11001 MAINTAINING TRAFFIC, AS PER PLAN | 1 LS | $12,000 | $12k | 2% |
| 623E10000 CONSTRUCTION LAYOUT STAKES AND SURVEYING | 1 LS | $7,500 | $8k | 1% |
| 103E05000 PREMIUM FOR CONTRACT PERFORMANCE BOND AND FOR PAYM | 1 LS | $7,200 | $7k | 1% |
| 832E30000 EROSION CONTROL | 5,000 EACH | $1 | $5k | 1% |